Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B687 + (05:29:59, 6 January 2025)
- ML18102B685 + (05:30:00, 6 January 2025)
- ML18102B684 + (05:30:01, 6 January 2025)
- ML18102B682 + (05:30:02, 6 January 2025)
- ML18102B683 + (05:30:02, 6 January 2025)
- LR-N970753, Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ + (05:30:03, 6 January 2025)
- LR-N970752, Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ + (05:30:05, 6 January 2025)
- ML18102B679 + (05:30:07, 6 January 2025)
- LR-N970707, Application for Amends to Licenses DPR-70 & DPR-75,providing TS Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels + (05:30:08, 6 January 2025)
- ML18102B676 + (05:30:11, 6 January 2025)
- ML18102B675 + (05:30:13, 6 January 2025)
- LR-N970150, Application for Amends to Licenses DPR-70 & DPR-75, Correcting Editorial & Administrative Errors in Ts,Which Existed Since Initial Issuance + (05:30:14, 6 January 2025)
- ML18102B672 + (05:30:16, 6 January 2025)
- ML18102B668 + (05:30:18, 6 January 2025)
- ML18102B671 + (05:30:18, 6 January 2025)
- LR-N970712, Forwards Rev 8 to Inservice Testing Manual for Pumps & Valves Program. Interval 2 Ten Year Salem IST Program for Units 1 & 2 Is Extended for Period Equivalent to Length of Outage,Due to Extended Plant Shutdown + (05:30:19, 6 January 2025)
- 05000311/LER-1997-014-01, :on 971002,Unit 2 Manually Tripped.Caused by Failure of Analog Input Circuit Board in Westrac Data Acquistion Sys.Westrac Data Acquisition Sys Removed from Digital Fws + (05:30:22, 6 January 2025)
- ML18102B664 + (05:30:23, 6 January 2025)
- ML18102B663 + (05:30:24, 6 January 2025)
- LR-N970563, Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.8.1 Re EDG & Deleting SR 4.8.1.1.2.d.1,calling for Diesels to Be Subjected to Insp Based on Vendor Recommendations + (05:30:25, 6 January 2025)
- 05000272/LER-1994-016, :on 941116,non-compliance W/Control Room Area SRO TS Staffing Requirements,Occurred.Caused by Personnel Error.Included LER 94-016-00 in Operator Continuing Training Sessions + (05:30:27, 6 January 2025)
- ML18102B659 + (05:30:28, 6 January 2025)
- LR-N970636, Application for Amends to Licenses DPR-70 & DPR-75,revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid + (05:30:32, 6 January 2025)
- LR-N970695, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-09,50-311/97-09 & 50-311/97-11.C/As:revised Unit 2 RWST Drain Down Evaluation,Revised EOP-LOCA-3 to Support Drain Down re-evaluation & Trained Crews on New Procedure + (05:30:38, 6 January 2025)
- ML18102B654 + (05:30:40, 6 January 2025)
- ML18102B652 + (05:30:41, 6 January 2025)
- ML18102B650 + (05:30:43, 6 January 2025)
- ML18102B651 + (05:30:43, 6 January 2025)
- ML18102B649 + (05:30:44, 6 January 2025)
- ML18102B647 + (05:30:45, 6 January 2025)
- ML18102B646 + (05:30:46, 6 January 2025)
- LR-N970603, Application for Amends to Licenses DPR-70 & DPR-75,revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 + (05:30:47, 6 January 2025)
- ML18102B643 + (05:30:49, 6 January 2025)
- LR-N970639, Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.8.1.1.2.d.2 Proposed in Util 960925 Submittal Re EDG Testing + (05:30:50, 6 January 2025)
- ML18102B639 + (05:30:52, 6 January 2025)
- ML18102B637 + (05:30:53, 6 January 2025)
- LR-N970664, Responds to 970919 RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis-Accident Conditions + (05:30:54, 6 January 2025)
- ML18102B635 + (05:30:57, 6 January 2025)
- ML18102B634 + (05:30:58, 6 January 2025)
- ML18102B633 + (05:30:59, 6 January 2025)
- ML18102B632 + (05:31:00, 6 January 2025)
- ML18102B629 + (05:31:01, 6 January 2025)
- LR-N970682, Monthly Operating Rept for Sept 1997 for Salem,Unit 2 + (05:31:03, 6 January 2025)
- ML18102B628 + (05:31:03, 6 January 2025)
- LR-N970681, Monthly Operating Rept for Sept 1997 for Salem,Unit 1 + (05:31:05, 6 January 2025)
- LR-N970652, Discusses Status of Proposed TS Changes Re Component Cooling Water Pump + (05:31:07, 6 January 2025)
- ML18102B624 + (05:31:09, 6 January 2025)
- LR-N970660, Submits Response to Violations Noted in Insp Repts 50-272/97-16 & 50-311/97-16.Corrective Actions:Appropriate Personnel Being Held Accountable for Actions in Accordance W/Util Disciplinary Policy + (05:31:10, 6 January 2025)
- ML18102B622 + (05:31:10, 6 January 2025)
- ML18102B620 + (05:31:12, 6 January 2025)
- LR-N970619, Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 + (05:31:13, 6 January 2025)
- 05000311/LER-1997-003-03, :on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containments Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised + (05:31:17, 6 January 2025)