Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N980208, Provides Suppl Response to NRC Bulletin 96-01,as Committed to in .Response Contains Relevant Control Rod Drag Force Testing,Summary of Control Rod Drop Testing,Location of Each Assembly in Core,Control Rod Drop Time & Recoils + (05:16:55, 6 January 2025)
- IR 05000443/2018007 + (05:16:58, 6 January 2025)
- ML18106A580 + (05:16:59, 6 January 2025)
- LR-N980217, Forwards Diskette Containing Annual Rept on of Individual Monitoring for Salem & Hope Creek Generating Stations,Per 10CFR20.2206 + (05:17:00, 6 January 2025)
- 05000272/LER-1998-005, Corrected LER 98-005-00:on 980219,inoperability of 12 Fuel Oil Transfer Pump (Fotp),Noted.Caused by Installation of Incorrect Control Switch.Field Insp Performed to Verify Configuration of Switches for 11,21 & 22 FOTPs + (05:17:02, 6 January 2025)
- ML18106A577 + (05:17:03, 6 January 2025)
- ML18106A574 + (05:17:05, 6 January 2025)
- LR-N980197, Responds to NRC Re Violations Noted in Insp Repts 50-272/98-01 & 50-311/98-01.Corrective Actions:New Service Water Reliability Program Manager Has Been Assigned + (05:17:06, 6 January 2025)
- ML18106A570 + (05:17:09, 6 January 2025)
- LR-N980137, Forwards Responses to NRC Questions Re Electrical Power Sources During Shutdown + (05:17:10, 6 January 2025)
- LR-N980144, Informs That Licensee Completed Requirements of CAL Issued on 950609 & Modified on 970806 to Allow Restart of Salem, Unit 2.Mod to Subject Cal,Requested to Allow Salem,Unit 1,to Restart + (05:17:12, 6 January 2025)
- ML18106A563 + (05:17:14, 6 January 2025)
- ML18106A565 + (05:17:14, 6 January 2025)
- LR-N980198, Informs NRC That Analysis of Containment Liner Anchorage Loading Due to MSLB Completed & Available at Site for NRC Review + (05:17:15, 6 January 2025)
- 05000272/LER-1998-008, :on 980323,inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.Caused by less-than-adequate Work Practices During Replacement of Equalizing Valve.Salem Unit 2 Airlocks Were Inspected + (05:17:18, 6 January 2025)
- ML18106A557 + (05:17:20, 6 January 2025)
- LR-N98-0192, Monthly Operating Rept for Mar 1998 for Salem,Unit 1 + (05:17:21, 6 January 2025)
- ML18106A546 + (05:17:22, 6 January 2025)
- ML18106A542 + (05:17:23, 6 January 2025)
- GO2-18-056, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 + (05:17:24, 6 January 2025)
- LR-N98-0193, Monthly Operating Rept for Mar 1998 for Salem Unit 2 + (05:17:25, 6 January 2025)
- ML18106A458 + (05:17:28, 6 January 2025)
- ML18106A457 + (05:17:29, 6 January 2025)
- ML18106A455 + (05:17:33, 6 January 2025)
- LR-N980160, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-21 & 50-311/97-21.Corrective Actions:Tris Database Was Updated & CR Switches Were Promptly Tagged to Document off-normal Position for These Valves + (05:17:34, 6 January 2025)
- ML18106A449 + (05:17:39, 6 January 2025)
- ML18106A446 + (05:17:41, 6 January 2025)
- ML18106A447 + (05:17:41, 6 January 2025)
- 05000272/LER-1998-004-01, :on 980302,failure to Perform TS 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Were Taken to Correctly Document Safety Factors + (05:17:43, 6 January 2025)
- ML18106A444 + (05:17:44, 6 January 2025)
- IR 05000272/1998004 + (05:17:49, 6 January 2025)
- ML18106A440 + (05:17:50, 6 January 2025)
- ML18106A439 + (05:17:51, 6 January 2025)
- 05000311/LER-1998-006-01, :on 980227,incorrect Scaling of First Stage Turbine Impulse Pressure Transmitters Noted.Cause Indeterminate.Implemented Procedure Changes & re-scaled Affected Turbine Impulse Pressure Transmitters + (05:17:53, 6 January 2025)
- LR-N980146, Provides Administrative Clarification of Phrase Included in 971014 License Amend Request + (05:17:54, 6 January 2025)
- LR-N980141, Forwards 90-day Response to GL 97-06, SG Tube Insp Techniques + (05:17:56, 6 January 2025)
- ML18106A432 + (05:17:58, 6 January 2025)
- ML18106A431 + (05:17:59, 6 January 2025)
- ML18106A430 + (05:18:01, 6 January 2025)
- ML18106A429 + (05:18:01, 6 January 2025)
- LR-N980125, Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 + (05:18:02, 6 January 2025)
- ML18106A425 + (05:18:05, 6 January 2025)
- ML18106A424 + (05:18:08, 6 January 2025)
- LR-N980038, Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters + (05:18:09, 6 January 2025)
- ML18106A421 + (05:18:12, 6 January 2025)
- LR-N980158, Provides Response to NRC Requesting Util Review Concern Re Item in TP-6,Section II.4,as It Applies to ASME Code Re Inservice Testing Program.Util Will Clarify Statement in TP-6 Re Testing of Check Valves + (05:18:13, 6 January 2025)
- ML18106A418 + (05:18:15, 6 January 2025)
- TAC:M98703 + (05:18:16, 6 January 2025)
- ML18106A416 + (05:18:17, 6 January 2025)
- ML18106A412 + (05:18:18, 6 January 2025)
- PNO-I-98-009, on June 1995 CAL Which Modified to Allow Salem Unit 2 Restart on 970806 Has Now Been Modified to Permit Unit 1 Restart.Approach to Criticality Expected to Begin on 980405.Addl Insp Planned to Monitor Power Ascension Program + (05:18:20, 6 January 2025)
- ML18106A410 + (05:18:21, 6 January 2025)