Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N98-0293, Monthly Operating Rept for May 1998 for Salem Unit 2 + (05:15:33, 6 January 2025)
- ML18106A652 + (05:15:36, 6 January 2025)
- ML18106A651 + (05:15:37, 6 January 2025)
- LR-N980286, Submits Annual Fuel Clad Temp Rept,Iaw Requirements of 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp for Salem Generating Station Large & Small Break LOCA Analyses + (05:15:38, 6 January 2025)
- LR-N980230, Notifies NRC of Plans to Implement Rev 2 of MPR-1807/NEDC-32719 as Response to GL 96-05 for Salem & Hope Creek Generating Stations.Specific Items in Pse&Gs Continue to Be Applicable + (05:15:40, 6 January 2025)
- ML18106A649 + (05:15:40, 6 January 2025)
- 05000272/LER-1998-011, :on 980505,improper Isolation of Single Cell Battery Charger from 125 Vdc Battery Was Noted.Caused by Inadequate 10CFR50.59 Applicability Review.Placed Procedure SC.MD-CM.ZZ-0024(Q) on Administrative Hold + (05:15:43, 6 January 2025)
- TAC:MA0038 + (05:15:44, 6 January 2025)
- ML18106A646 + (05:15:45, 6 January 2025)
- LR-N980270, Informs That Salem TS Surveillance Improvement Project (Tssip) Completed Phase 2 Review of 1,185 of 1,293 TS Implementing Procedures as of End of Dec 1997.As of 980520, Review of All 108 Remaining Procedures Completed + (05:15:46, 6 January 2025)
- 05000311/LER-1998-006, :on 980227,determined Incorrect Scaling Error of First Stage Pressure Transmitter Existed.Caused by Human Error.Revised Setpoint Calculation SC-MS002-01 & Revised Associated Instrument Calibr Database Info + (05:15:48, 6 January 2025)
- 05000272/LER-1998-010, :on 931019,reactor Pressure Vessel Insp Plugs Were Out of Configuration,Was Noted.Caused by Personnel Error.Proper Configuration Was Restored Shortly After Discovery Prior to Entering Mode 2 + (05:15:50, 6 January 2025)
- ML18106A639 + (05:15:52, 6 January 2025)
- ML18106A640 + (05:15:52, 6 January 2025)
- ML18106A638 + (05:15:53, 6 January 2025)
- ML18106A637 + (05:15:54, 6 January 2025)
- ML18106A636 + (05:15:56, 6 January 2025)
- ML18106A635 + (05:15:57, 6 January 2025)
- ML18106A634 + (05:15:58, 6 January 2025)
- ML18106A633 + (05:15:59, 6 January 2025)
- ML18106A632 + (05:16:00, 6 January 2025)
- ML18106A629 + (05:16:01, 6 January 2025)
- ML18106A631 + (05:16:01, 6 January 2025)
- ML18106A628 + (05:16:02, 6 January 2025)
- ML18106A627 + (05:16:03, 6 January 2025)
- ML18106A625 + (05:16:04, 6 January 2025)
- ML18106A624 + (05:16:05, 6 January 2025)
- TAC:M91325 + (05:16:06, 6 January 2025)
- ML18106A623 + (05:16:06, 6 January 2025)
- LR-N980190, Informs of One Time Rev to Commitment to Specific Provisions Contained in NRC SER to Perform Weld Root Pass Surface Nde. Instead of Volumetric Exam on Pressure Boundary,Asme Class 3 Component Was Performed,Per Requirements of 10CFR50.59 + (05:16:07, 6 January 2025)
- ML18106A621 + (05:16:09, 6 January 2025)
- ML18106A619 + (05:16:10, 6 January 2025)
- LR-N980245, Responds to NRC Re Violations Noted in OI 1-96-031.Corrective Actions:Safeguards Event Log Updated When Incorrect Log Entry Was Discovered + (05:16:11, 6 January 2025)
- LR-N980238, Informs That Rc Downey,License SOP-11342,has Resigned from Pse&G.License Should Be Terminated + (05:16:12, 6 January 2025)
- LR-N980251, Submits Request for Approval of Incorporation of WRB-2 CHF Correlation Into Plant Licensing Basis.Util Requests NRC Approval by 980831 in Order to Support Fuel Mfg Schedule + (05:16:19, 6 January 2025)
- ML18106A615 + (05:16:21, 6 January 2025)
- 05000311/LER-1998-008-01, :on 970814,failure to Test 21 & 22 AF 40 Valves in Closed Direction as Required by TS 4.0.5 Was Noted.Caused by Inadequate Design Mod Process.Motor Driven 21/22 AF 40 Valves Were Tested IAW Revised Procedure + (05:16:23, 6 January 2025)
- ML18106A613 + (05:16:24, 6 January 2025)
- LR-N98-0243, Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1 + (05:16:25, 6 January 2025)
- LR-N98-0244, Monthly Operating Rept for Apr 1998 for Salem Unit 2 + (05:16:27, 6 January 2025)
- IR 05000272/1998001 + (05:16:30, 6 January 2025)
- TAC:M92777 + (05:16:31, 6 January 2025)
- LR-N980037, Provides Clarification of 950622 License Amend Request, Deleting Amend 72 (DPR-70) & Amend 46 (DPR-75) Re RHR Operation in Modes 4 & 5,in Response to Rai.Clarification of TS Bases 3/4.4.1 & 3/4.9.7,provided + (05:16:32, 6 January 2025)
- 05000272/LER-1998-004, Corrected LER 98-004-00:on 980302,failure to Comply W/Tss 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Have Been Taken to Correctly Document Safety Factors.Corrects Prior Similar Occurrences + (05:16:35, 6 January 2025)
- TAC:M95635 + (05:16:37, 6 January 2025)
- ML18106A597 + (05:16:38, 6 January 2025)
- ML18106A596 + (05:16:39, 6 January 2025)
- LR-N980204, Forwards Correction to Licensee 971020 Response to RAI Re GL 96-06.Attachment of Subject Ltr Was Transmitted W/Portion of Paragraph on Page 5 Truncated.Replacement of Attachment, Requested + (05:16:40, 6 January 2025)
- LR-N980157, Forwards Response to 980312 RAI Re Util Commitment to Seismically Qualify Spent Fuel Cooling Sys,Contained in + (05:16:42, 6 January 2025)
- LR-N980233, Informs That Incorrectly Identified LER Number as LER 311/98-007-00 Instead of LER 272/98-007-00.Ltr W/ Original LER Being Submitted to Correct Administrative Oversight + (05:16:44, 6 January 2025)
- ML18106A592 + (05:16:46, 6 January 2025)