Forwards Insp Repts 50-272/98-03 & 50-311/98-03 on 980316- 0503 & Notice of Violation Re Failure to Follow Procedures, Including Documentation of Engineering Evaluations & Operability Determinations
ML18106A627
Person / Time
Site: Salem  
Issue date: 05/22/1998
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML18106A630 List:
References
50-272-98-03, 50-272-98-3, 50-311-98-03, 50-311-98-3, NUDOCS 9806030286
Download: ML18106A627 (3)


See also: IR 05000272/1998003

Text

Mr. Harold W. Keiser

Executive Vice President

Nuclear Business Unit

May 22, 1998

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/98-03, 50-311 /98-03

NOTICE OF VIOLATION

Dear Mr. Keiser:

On May 3, 1998, the NRC completed an inspection at your Salem 1 & 2 reactor facilities.

The enclosed report presents the results of that inspection.*

During the seven week period covered by this inspection, the of activities at the Salem

facilities generally involved safety-conscious operations, sound engineering practices, and

careful radiological work .controls. The prompt decision to reduce power and remove Unit

2 from service following an unplanned inoperability of a service water loop was viewed as

appropriate. Though maintenance was generally safe and controlled, we noted several

work coordination issues during emergency diesel generator on-line maintenance which led

to delays in restoring the equipment to operability.

On April 1, 1998, Confirmatory Action Letter 1-95-001 was modified and NRC approved

the restart of Salem Unit 1. Unit 1 achieved criticality on April 7, 1998. Overall, your

plant management and staff controlled the reactor startup, testing, and power ascension

activities well. The operating crews were attentive, used excellent communication skills,

and appropriately addressed all emergent issues and challenges.

In our letter dated March 17, 1998, we informed you that enforcement action from the

Readiness Assessment Team Inspection (RATI) would be addressed under separate

correspondence. The RATI identified issues involving the failure to follow procedures,

including the documentation of engineering evaluations and operability determinations, and

inadequate oversight of the Corrective Action Program. These violations are cited in the

enclosed Notice of Violation and the circumstances surrounding the issues were described

in detail in NRC Inspection Report 50-272, 311/98-81 sections M&03.2.b and E4.1.b

respectively. Please note that you are required to respond to this letter and should follow

the instructions specified in the enclosed Notice when preparing your response. The NRC

will use your response, in part, to determine whether further enforcement action is

necessary to ensure compliance with regulatory requirements .

9806030286 980522

~DR ADOCK 05000272

PDR

Mr. Harold *w. Keiser

2

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

Enclosures:

Notice of Violation

Sincerely,

Original Signed By:

James C. Linville, Chief

Projects Branch 3

Division of Reactor Projects

Inspection Report 50-272/98-03, 50-311 /98-03

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

C. Bakken, General Manager - Salem Operations

J. McMahon, Director - QA/Nuclear Training/Emergency Preparedness

D. Powell, Director, Licensing, Regulation and Fuels

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

J. J. Keenan, Esquire

M. J. Wetterhahn, Esquire

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

Mr. Harol.d W. Keiser

3

Distribution. w/encl:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

PUBLIC

H. Miller, HA/W. Axelson, DRA

J. Linville, DRP

S . .Sarber, DRP

L. Harrison, DRP

C. O'Daniell, DRP

G. Kelly, DRS

N. Della Greca, DRS

Distribution w/encl: (Via E-Mail)

B. McCabe, OEDO

R. Capra, NRR

P. Milano, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

DOCUMENT NAME: G:\\BRANCH3\\IR9803

To receive a copy of this document, ijicate in the box: *c* = Copy without attachment/enclosure

No copy

OFFICE

Rl/DRP

Al I

I

I

I

I

NAME

Jlinville \\Y1.-' /

DATE

05/22/98 v

05/ /98

05/ /98

OFFICIAL RECORD COPY