MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1981999-04-12012 April 1999 Responds to 990312 RAI Re Request for Change to TSs Permissible Enrichment Values for New Fuel Storage,Which Was Submitted on 990202 ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML20205F8981999-03-31031 March 1999 Provides Info Re Status of Decommissioning Funding for LGS, Units 1 & 2,PBAPS,Units 1,2 & 3 & Sgs,Units 1 & 2,per Requirements of 10CFR50.75(f)(1) ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek 1999-09-08
[Table view] |
Text
e
... 0 PS~G
- Public Service .Electric ,and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit MAY 2 8 1998 LR-E980261 CERTIFIED MAIL RETURN RECEIPT REQUESTED ARTICLE NUMBER: P 462 770 283 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
REPORT OF IMPINGEMENT OF SHORTNOSE STURGEON SALEM GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NO. 50-272 AND 50-311 In accordance with Section 5.4.2 of Appendix B, Environmental Protection Plan, to the Operating License for the Salem Generating Station, Public Service Electric and Gas Company (PSE&G) hereby transmits notification of a nonroutine event discovery, and documents the occurrence and removal of three (3) shortnose sturgeon from the Salem I
Generating Station circulating water intake structure.
Enclosed please find four (4) attachments. Attachment 1 gives a narrative description of the events, as requested by the NRG. Attachment 2-4, requested by the National Marine Fisheries Service (NMFS), provides more specific information regarding the observance and retrieval of each sturgeon.
Should you have any questions regarding this transmittal, please feel free to contact us.
Sincerely, D.R. Powell Director-Licensing/Regulation & Fuels
\\.
~,
\
\.
Attachments (4) . , ., -* ,...,
- ---- -- ---- - - -- - -- - - -- --- - -- -'---'- ~ \ ._j;__()_
I 9806020356 980528 1
- PDR ADOCK 05000272 I S PDR The power is in your hands.
95-2168 REV. 6/94
Document Control Desk 2 MAY 2 81998 LR-E980261 C Mr. Hubert J. Miller, Administrator- Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. G. Evans (X24)
USNRC Senior Resident Inspector - Salem Mr. Doug Beach National Marine Fisheries Service Habitat Conservation Branch One Blackburn Drive Gloucester, MA 01930-2298 Ms. Nancy Haley National Marine Fisheries Service 212 Rogers Avenue Milford, CT 06460 Mr. Kent Tosch, Manager IV New Jersey Department of Environmental Protection Bureau of Nuclear Engineering 33 Arctic Parkway P. 0. Box 415 Trenton, NJ 08625-0415 Mr. Dave Jenkins Endangered and Nongame Species Program
LR-E980261 ATTACHMENT 1 INCIDENTAL TAKE OF SHORTNOSE STURGEON OCCURRENCE DATES: May 6, 1998 May 14, 1998 May 16, 1998 FACILITY: Salem Generating Station, Units 1 and 2 Public Service Electric and Gas Company Hancocks Bridge, NJ 08038 IDENTIFICATION OF OCCURRENCES:
Three shortnose sturgeon (Acipenser brevirostrum) were removed from Circulating Water System (CWS) Intake trash racks at the Salem Generating Station. The sturgeon were recovered on May 6, May 14 and May 16, 1998. Shortnose sturgeon are federally listed as "endangered" species under the Endangered Species Act of 1973, as amended.
CONDITIONS PRIOR TO OCCURRENCES:
May 6, 1998 Unit 1 90 percent power Unit 2 100 percent power May 14, 1998 Unit 1 95 percent power Unit 2 100 percent power May 16, 1998 Unit 1 70 percent power Unit 2 100 percent power DESCRIPTION OF OCCURRENCES:
DATE TIME STATUS INTAKE FORK TOTAL WEIGHT BAY LENGTH LENGTH (KG)
(CM) (CM) "
5/6/98 1100 Live 22B NA - 61 NA 5/14/98 0857 Live 12A 77.5 85.5 NA 5/16/98 1000 Dead 23A NA -63.9 3.18 The sturgeon recovered on May 6th and May 14th were recovered alive, while the sturgeon recovered on May 16th was dead. Site Services personnel recovered all sturgeon during the cleaning of the trash racks.
2 The May 5th 'live st~rgeon was in good condition, with no marks or lesions and was immediately released back into the Delaware River. PSE&G does not have any documentation (i.e., measurements and photographs) for this sturgeon. The sturgeon was released prior to Environmental Licensing personnel responding. A biological environmental consulting employee, who used a key for identification, as well as conversations with experienced personnel of the company, made the identification.
The May 14th live sturgeon was in fair condition, with some old wounds on the sides and missing its right eye. It was released, after discussions with NMFS about the disposition, at approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> near the Hope Creek Jetty on the Delaware River.
The May 15th dead sturgeon was missing its tail and had a gash on the right side behind the gill. The sturgeon was immediately placed on ice and has been frozen. Fin tissue samples have been taken and were sent to Dr. Ike Wirgin at the New York University Medical Center. The carcass was sent to the Academy of Natural Sciences in Philadelphia, PA.
The U.S. Nuclear Regulatory Commission (NRC), the U.S. National Marine Fisheries Service (NMFS), and the New Jersey Department of Environmental Protection (NJDEP) have been notified regarding these occurrences.
APPARENT CAUSE OF OCCURRENCES:
Based on historical and recent records, shortnose sturgeon appear to utilize the entire Delaware estuary-river complex, from the river mouth to New Hope, Pennsylvania (0-238 river kilometer - rkm). Spawning occurs north of Trenton, 128 rkm upstream from the Salem and Hope Creek Generating Stations. It is unlikely that larval or post-larval fish would travel the distance downstream to Artificial Island. Adult shortnose sturgeon may move into the Artificial Island area during fall migration to wintering grounds.
Healthy adult and juvenile shortnose sturgeon are strong enough swimmers that they should be able to escape from intake velocities typically encountered at the trash bars.
Sturgeon which are in a weakened condition may be subject to impingement.
ANALYSIS OF OCCURRENCE:
The CWS intake is monitored for accumulation of debris throughout the year. This accumulated debris is periodically removed. Because of the debris in the Delaware River this spring, cleaning of the trash racks has been occurring typically on a daily basis. All three sturgeon in 1998 have been recovered during this cleaning. Between 1978 and 1998, a total of thirteen (13) shortnose sturgeon have been collected at the CWS intake, two in 1978, one in 1981, three in 1991, two in 1992, two in 1994, and these three occurrences in 1998.
3 CORRECTIVE ACTION:
PSE&G has began inspecting the trash racks every two hours which is not mandated until the period of June 1 and October 15. The specified time period represents the peak migratory movement of sea turtles into and out of the Delaware River.
Observations are made specifically for sea turtles and sturgeon during this time. During the remaining months the trash rack is inspected daily for debris load and cleaned as necessary. Any sturgeon occurrence will be observed at this time.
LR-E980261 ATTACHMENT 2 REPORTING REQUIREMENTS Appendix II to Section 7 Consultation Photographs should be taken and the information requested below should be collected in association with all protected species (sea turtles and shortnose sturgeon) impingements. This documentation should be sent to the:
National Marine Fisheries Service Habitat Conservation Branch One Blackburn Drive Gloucester, MA 01930-2298 Protected Species Impingements Salem and Hope Creek Generating Stations Observers full name: Cherie Titerance - Environmental Consulting Services, Inc.
- Reporters full name: Donald Bowman - PSE&G Environmental Licensing Species Identification: Shortnose Sturgeon (Acipenser brevirostrum)
Site of Impingement: *Salem Generating Station - CWS Intake 22B Date and time impingement was observed: 05/06/98 1100 hrs Date and time animal was collected: 05/06/98 1100 hrs Tidal stage at time of observation: Ebb Tide Date and time of last observation of screen: 05/06/98 1100 hrs Water temperature at site and time of impingement: 18.47° (C)
Average percent of power generating capacity achieved per unit over the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> previous to impingement: Unit 1 - 90 percent Unit 2 - 100 percent Condition of animal: Live Shortnose Sturgeon Measurements:
Fork Length: NA Total Length: Estimated to be greater than 2 feet (61 centimeters)
Weight: NA Remarks: The sturgeon was found during routine cleaning of the CWS Intake trash racks.
It was in good condition and immediately released back into the Delaware River.
PSE&G does not have any documentation (i.e., measurements and photographs) for this sturgeon.
LR-E980261 ATTACHMENT 3 REPORTING REQUIREMENTS Appendix II to Section 7 Consultation Photographs should be taken and the information requested below should be collected in association with all protected species (sea turtles and shortnose sturgeon) impingements. This documentation should be sent to the:
National Marine Fisheries Service Habitat Conservation Branch One Blackburn Drive Gloucester, MA 01930-2298 Protected Species Impingements Salem and Hope Creek Generating Stations Observers full name: John Shuman - PSE&G Site Services Reporters full name: Robert Boot - PSE&G Environmental Licensing Species Identification: Shortnose Sturgeon (Acipenser brevirostrum)
Site of Impingement: Salem Generating Station - CWS Intake 12A ,
Date and time impingement was observed: 05/14/98 0857 hrs Date and time animal was collected: 05/14/98 0857 hrs Tidal stage at time of observation: Flood Tide Date and time of last observation of screen: 05/14/98 0857 hrs Water temperature at site and time of impingement: 15.83° (C)
Average percent of power generating capacity achieved per unit over the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> previous to impingement: Unit 1 - 95 percent Unit 2 - 100 percent Condition of animal: Live Shortnose Sturgeon Measurements:
Fork Length: 77.5 cm Total Length: 85.5 cm Weight: NA Remarks: The sturgeon was found during routine cleaning of the CWS Intake trash racks.
It was in fair condition with a missing right eye and bruises on top and sides of body. After discussion with NMFS, it was released into the Delaware River near Hope Creek Jetty.
LR-E980261 ATTACHMENT 4 REPORTING REQUIREMENTS Appendix II to Section 7 Consultation Photographs should be taken and the information requested below should be collected in association with all protected species (sea turtles and shortnose sturgeon) impingements. This documentation should be sent to the:
National Marine Fisheries Service Habitat Conservation Branch One Blackburn Drive Gloucester, MA 01930-2298 Protected Species Impingements Salem and Hope Creek Generating Stations Observers full name: Dave Lesher - PSE&G Site Services Reporters full name: Robert Boot - PSE&G Environmental Licensing Species Identification: Shortnose Sturgeon (Acipenser brevirostrum)
Site of Impingement: Salem Generating Station - CWS Intake 23A Date and time impingement was observed: 05/16/98 1000 hrs Date and time animal was collected: 05/16/98 1000 hrs Tidal stage at time of observation: Flood Tide Date and time of last observation of screen: 05/16/98 1000 hrs Water temperature at site at time of impingement: 18.77° c Average percent of power generating capacity achieved per unit over the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> previous to impingement: Unit 1 - 70 percent Unit 2 - 100 percent Condition of animal: Dead Shortnose Sturgeon Measurements:
Fork Length: Estimated at 63.9 cm Total Length: NA Weight: 3.18 Kg Remarks: The sturgeon was found during routine cleaning of the CWS Intake trash racks. It had a gash on the right side behind the gills and missing tail.