Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-77-290, Letter Forwarding Supplement 1 to Revision 1 of CEN-38 (F) Containing Five Figures Reclassified as non-proprietary + (03:40:08, 6 January 2025)
- L-77-279, Letter Indicating Preparation of a Response on the Subject of Control Room Leak Rate Testing and Dose Calculations. Plan to Forward Response by 09/23/1977 + (03:40:08, 6 January 2025)
- PMNS20180524, Design Certification Review Discussions + (03:40:09, 6 January 2025)
- L-77-305, Submittal of Drawings for Inservice Inspection and Testing Program + (03:40:10, 6 January 2025)
- PMNS20180523, Design Certification Review Discussions - Response to RAI 9092, 9196 and 9128 + (03:40:10, 6 January 2025)
- L-77-314, Letter Advising That FP&L Is in Compliance with the Physical Search Requirements of 10 CFR 73.55 + (03:40:11, 6 January 2025)
- L-77-333, Letter Regarding Inservice Inspection Program. Expects to Complete Response in About 30 Days & Plan to Forward by 11/30/1977 + (03:40:12, 6 January 2025)
- ML18127B206 + (03:40:12, 6 January 2025)
- L-77-164, Letter Forwarding Copies of a Supplementary Startup Report Covering the Remainder of the Test Program + (03:40:13, 6 January 2025)
- L-77-276, Proposed Amendment to Facility Operating License DPR-67, Supplemental Information. Requests That Extension of Due Date for Specification 4.4.5 Be Deleted from Proposed Amendment + (03:40:14, 6 January 2025)
- L-77-392, Combustion Engineering Reported Potential CEA-to-Guide-Tube Interaction That Lead to Deterioration of Guide Tube. FP&L Implemented Weekly Cycling of CEAs as Requested by NRC Per Phone Conversation on 12/23/1977. Will Prepare . + (03:40:15, 6 January 2025)
- ML18127B184 + (03:40:18, 6 January 2025)
- ML18127B181 + (03:40:18, 6 January 2025)
- DT-18-12, Management Directive 8.1, Abnormal Occurrence Reporting Procedure + (03:40:19, 6 January 2025)
- ML18127B178 + (03:40:21, 6 January 2025)
- ML18127B175 + (03:40:22, 6 January 2025)
- ML18127B172 + (03:40:23, 6 January 2025)
- IR 05000458/2018011 + (03:44:50, 6 January 2025)
- ML18127B168 + (03:44:52, 6 January 2025)
- ML18127B167 + (03:44:53, 6 January 2025)
- L-76-326, Response to Letter of 8/13/1976 to Evaluate Reactor Coolant System Design and Provide Certain Information Regarding Susceptibility to Overpressurization Events, FP&L Will Report the Results by 10/15/1976 + (03:44:54, 6 January 2025)
- ML18127B164 + (03:44:54, 6 January 2025)
- ML18127B156 + (03:44:55, 6 January 2025)
- ML18127B154 + (03:44:56, 6 January 2025)
- ML18127B151 + (03:44:56, 6 January 2025)
- L-76-352, FP&L Does Not Plan to Replace CEDM 44 During the Present Outage. FP&L Requests Section J Be Deleted from Enclosure 1 to Operation License + (03:44:57, 6 January 2025)
- L-76-356, FP&L Wants to Withdraw Request of 8/3 and 10/7/1976 for Deletion of Section J of Enclosure 1 to Operating License. FP&L Will Renew Request for Deletion Upon Completion of Replacement of CEDM 44 + (03:44:58, 6 January 2025)
- ML18127B149 + (03:44:58, 6 January 2025)
- L-76-376, Replacement of CEDM 44 During the Present Outage Is Complete, Fulfilling Condition J of Enclosure 1 to Operating License. FP&L Requests Condition J to Be Deleted + (03:44:59, 6 January 2025)
- L-76-381, Response to Request of 9/30/1976 for Information on Operating Experience with Loose-Parts and Loose-Parts Monitoring System + (03:45:00, 6 January 2025)
- ML18127B143 + (03:45:00, 6 January 2025)
- ML18127B139 + (03:45:01, 6 January 2025)
- L-76-401, Letter Supplements Information Repair Report CEN-38(f)-P, Rev. 1, and Documents Results of Recent Discussions with Staff. FP&L Concluded Additional Monitoring Using Traversing Incore Probes Would Not Be Appropriate + (03:45:02, 6 January 2025)
- ML18127B136 + (03:45:02, 6 January 2025)
- ML18127B128 + (03:45:03, 6 January 2025)
- L-76-415, Forwards Preoperational Test Procedure No. 0700080B,, Steam Generator Feedwater Hammer Test + (03:45:04, 6 January 2025)
- L-76-412, Correction for Fp&Ls Letter of 12/2/1976 + (03:45:07, 6 January 2025)
- L-76-416, Response to Letter of 11/5/1976, Forwards Requested Additional Appendix I Information + (03:45:07, 6 January 2025)
- L-76-437, Florida Power & Light Co.S Response to NRCs Letter of 8/1/1976 Concerning Anticipated Transients Without Scram + (03:45:10, 6 January 2025)
- ML18127B115 + (03:45:13, 6 January 2025)
- ML18127B109 + (03:45:14, 6 January 2025)
- ML18127B108 + (03:45:14, 6 January 2025)
- ML18127B107 + (03:45:15, 6 January 2025)
- ML18127B105 + (03:45:16, 6 January 2025)
- ML18127B106 + (03:45:16, 6 January 2025)
- ML18127B104 + (03:45:17, 6 January 2025)
- ML18127B102 + (03:45:18, 6 January 2025)
- ML18127B100 + (03:45:19, 6 January 2025)
- ML18127B101 + (03:45:19, 6 January 2025)
- L-77-111, Response to Request for Additional Information Steam Generator Operating History + (03:45:20, 6 January 2025)
- ML18127B094 + (03:45:20, 6 January 2025)
- L-76-414, Letter Enclosure of Generic Report on Overpressure Protection for Operating CE Ness + (03:45:23, 6 January 2025)