Enclosed Is Model Annual Report Developed After Reviewing Letter of 12/1/1976; FP&L Determined the Model Is Not Appropriate for Fp&Ls 1976 Annual Operating Report Since It Is Almost Completed and Reformatting Would Delay Submittal
ML18127B115
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/13/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18127B115 (4)


Text

U.S. NUCLEAR REGULATORY ISS ION NRC FORM 195 (2-76 I NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-335 FILE NUMBER'O:

Mr. Benard C. Rusche

'FROM:

Florida Power

& Light Company

'iami, Florida Mr. Robert E. Uhrig DATE OF DOCUMENT 1/13/77 DATE RECEIVED 1/17/77 glLETTER

. JPfORIGINAL QCOP Y C3NOTORIZED P6JNCLASSIFIEO PROP INPUT FORM NUMBER OF COPIES RECEIVED Thl'ee signed PLANT. NAME (1-P)

DESCRIPTION I

Ltr. re our 12/1/76 ltr....concerning the model annual rep'ort,.indicating that the model is not appropriate for their 1976 annual operating report...

ENCLOSURE DO NOT REMOVE ACXNO~EDGED St. Lucie foal SAFETY ASSIGNED AD!

FOR ACTION/INFORMATION Ziemann 1

19 77 RJL

-~RO EC

'MANA E

'L-C-'ASS

'Di 6

PROJECT MANAGER LIC ASST

~ '

~

~

> 4 ->

~

~

NRC. PDR I&E OELD GOSSICK & STAFF IPC CASE HANAUER

--.- HARLESS PROJECT.

MANAGEMENT BOYD P ~ COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT LPDR ~

Pierce Fla.

TIC!

NSIC!

ASLB!

ACRS CYS H8bBXNO/ E NRC FORM 166 {2-76)

. INTERNALD SYSTEMS SAFETY HEINEMAN SCHROEDER

- ENGINEERING MACARRY

'NIGHT SIHWEIL PAWLICK E REACTOR -SAFE ROSS NOVAK ROSZTOCZY CHECK AT & I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB ~

REG V,IE LA PDR CONSULTANTS!

ISTRI BUTION PLANT SYSTEMS TEDESCO N

0 IPPOLITO-OPERATING REACTORS STELLO OPERATING TECH EISENHUT B

E ULRIKSON OR S TE SAFE E

ERNST

- =>v BALLARD SPANGLER SITE TECH GAMMILL STEPP HULMAN SITE ANALYSIS VOLLMER BUNCH J ~ COLLINS KREGER CONTROL NUMBER Wz/

lf'<<$ 4>

g) ) pi' n",

AagIItatoI l Dn~trat pia,

+porno I'7- /ayg~

c. H~ygaa~

t( pi, Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Rusche:

Re:

St. Lucie Unit 1 Docket No. 50-335 Annual 0 eratin Re ort P. O. BOX 013100, MIAMI, FL 33101 i+1 i@i 0~

FLORIDAPOWER 5 LIGHTCOMPANY January 13,1977 L-77-16 2

J4y

'~i~EO 4~

Aug iaa~~

O~

6'e have reviewed your letter of December 1,

1976 and the enclosed model annual report.

We have determined that the model is not appropriate for our 1976 annual operating report.

Since the report, is almost completed for 1976, to reformat and research the additional information would delay its submittal beyond the date required by Technical Specifi-cations.

We agree in principal that the consistent arrangement. of annual operating reports would be desirable.

However, the proposed model exceeds the requirements of the plant Technical Specifications and Regulatory Guide 1.16, and requires repetition of information sub-mitted in special reports required by Technical Specifications.

Very truly yours, Robert E. Uhrig Vice President, REU/MAS/gbq cc: