Proposed Amendment to Facility Operating License DPR-67, Supplemental Information. Requests That Extension of Due Date for Specification 4.4.5 Be Deleted from Proposed Amendment
ML18127B193
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/02/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
L-77-276
Download: ML18127B193 (4)


Text

DISTRIBUTION AFTER ISSUANCE OF OPERATING LICEiISE iIRC FORM U.S. NUCI EAR REGULATORV COMMISSION OO~CET NUMSE+

8-vS I 195 W~- 90K FILE NUMSER

" NRC'DISTRlBUTlON 'FQR PART'50 DOCKET MATERlAL FROM OATE OF OQCUMENT Mr. Victor Stello FPL 09/02/77 Miami, Fl. 13100 Robert E. Uhrig OAT E RE CEI VE 0 09/06/77 ClNO I ORIZEO PROP INPUT FORM NUM8ER OF COPIES RECEIVEO LEs E'ER 5fQR IG INAL QCOPV A)UNCLASSIFIED g 51 DESCRIPTION ENCLOSURE Furnishing request that item 4 be deletdd from the proposed Amendment submitted 08/22/77 concerning extension of the present du dates for several of the 18-month surveillancde requirements...

. 1p 00 ¹T P<gog LUCIE UNIT A.Cage>>G g<'1'jm

'T 09/08/77 SAFETY FOR ACTION/INFORMATION BRANCH CHIEF: 7 INTERNAL D ISTRI BUTION

~QHULF~~'"

wIRC(-PDR I aIE (2)

OELD HANAUER CHECK STELLO I

E SEi IHUT SHAO, BAER'UTLER GRIMES COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:

TIC 8> 't NSIC ~~zgyozz~

16 CYS ACRS SENT CATE

\

. BOX 013100, MIAMI, FL 33101 Ql Ib h .vs%

FLORIDA POWER & LIGHT COMPANY September 2, 1977 L-77-276 Director of Nuclear Reactor Regu'lation Attn: Nr. Victor. Stello, Director 8 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C. 20555 gg" jap spy S

Dear Nr. Stello:

.U,sz I8@~

(R~~~v 'g@g45 Re: St. Lucie Unit 1 Docket No. 50-335 Proposed Amendment to Facility Operat:ing License DPR-67 Suoplemental Information In our letter of August 22, 1977 (L-77-256), FP&L.requested that the facility operating license for St;. Lucie Unit. 1 be amended to allow an extension of the present due dates for several of the 18-month surveillance requirements. to the end of the first regularly scheduled refueling outage. Item 4 of the request concerned Specification 4.4.5, which requires that the first in-service inspection of steara generator tubes

'be perform d within 24,calendar months of initial criticality.

This would require performance of the inspection before April 22, 1978, the date specified in the Safety Evaluation accompanying our request. However, based upon our understanding of Speci-fication 4.0.2, which allows an extension of each surveillance requirement not to exceed 25% of the test interval, the inspec-tion would actually have to be performed'efore October 22, 1978. Since the first regularly scheduled refueling outage for that'ate, an extension of the St. Lucie 1 will, o ccur before due date for'pecification 4.4.5 is n'ot required: Accordingly, FP&L hereby requests that that item be deleted from the proposed amendment.

In addit'on, at this time FP&L plans to undergo a maintenance outage of approximately two weeks duration't: St. Lucie Unit 1, beginning September 26, 1977. During this outage, the Integrated Safeguards Test (Item 6 of our Augu'st 22 letter) will be performed.

Yours very truly, 1

Robert 'E. Uhrig Vice President REU/LLL:ltm cc: Robert Lowenstein, Esq.