- 05000280/LER-1991-014-01, :on 910724,determined That Main Steam Flow Setpoints in Excess of Max TS Allowed Value of 110%.Caused by Use of Incorrect Scaling Methodology.Flow & Feedwater Flow Transmitters Will Be Respanned + (23:50:12, 5 January 2025)
- ML18153C706 + (23:50:13, 5 January 2025)
- 05000281/LER-1991-006-02, :on 910719,safety Injection Sys Interlock Rendered Inoperable & Unit Not Placed in Shutdown within Six H Due to Personnel Error.Failed Amplifier Circuit Board & Calibr Circuit Board Replaced + (23:50:15, 5 January 2025)
- 05000280/LER-1991-010, :on 910530.ASME Section XI Inservice Testing Program Requirements Discovered Not Met.Caused by Personnel Error.Review of Inservice Testing Program Conducted to Identify Any Other Compliance Issues + (23:50:17, 5 January 2025)
- 05000280/LER-1991-012-01, :on 910720,discovered That Pressurizer Level Channel Not Declared Inoperable,Per Acceptance Criteria Due to Personnel Error.Personnel Involved Reinstructed in Review of Recorded Data & Supervision of Trainees + (23:50:22, 5 January 2025)
- ML18153C702 + (23:50:23, 5 January 2025)
- ML18153C701 + (23:50:23, 5 January 2025)
- ML18153C700 + (23:50:25, 5 January 2025)
- ML18153C699 + (23:50:26, 5 January 2025)
- ML18153C697 + (23:50:26, 5 January 2025)
- TAC:72686 + (23:50:27, 5 January 2025)
- ML18153C695 + (23:50:28, 5 January 2025)
- ML18153C694 + (23:50:30, 5 January 2025)
- ML18153C692 + (23:50:31, 5 January 2025)
- ML18153C693 + (23:50:31, 5 January 2025)
- ML18153C691 + (23:50:32, 5 January 2025)
- ML18153C690 + (23:50:33, 5 January 2025)
- ML18153C688 + (23:50:34, 5 January 2025)
- TAC:73181 + (23:50:35, 5 January 2025)
- ML18153C684 + (23:50:37, 5 January 2025)
- ML18153C683 + (23:50:38, 5 January 2025)
- ML18153C682 + (23:50:38, 5 January 2025)
- ML18153C681 + (23:50:39, 5 January 2025)
- TAC:80425 + (23:50:40, 5 January 2025)
- ML18153C679 + (23:50:41, 5 January 2025)
- ML18153C678 + (23:50:42, 5 January 2025)
- ML18153C677 + (23:50:43, 5 January 2025)
- ML18153C676 + (23:50:43, 5 January 2025)
- ML18153C675 + (23:50:44, 5 January 2025)
- ML18153C674 + (23:50:45, 5 January 2025)
- TAC:65840 + (23:50:46, 5 January 2025)
- ML18153C673 + (23:50:47, 5 January 2025)
- IR 05000280/1991008 + (23:50:49, 5 January 2025)
- ML18153C671 + (23:50:50, 5 January 2025)
- ML18153C670 + (23:50:52, 5 January 2025)
- ML18153C669 + (23:50:53, 5 January 2025)
- IR 05000280/1991017 + (23:50:55, 5 January 2025)
- ML18153C666 + (23:50:56, 5 January 2025)
- 05000281/LER-1991-005-02, :on 910602,reactor Coolant Sys Leakage Exceeded Tech Spec Limits.Caused by Mechanical Failure of Isolation Valve.Preparation of Design Change Has Been Underway That Will Install RTDs on Main RCS Lines + (23:50:58, 5 January 2025)
- IR 05000280/1991013 + (23:50:59, 5 January 2025)
- IR 05000280/1991016 + (23:51:01, 5 January 2025)
- ML18153C660 + (23:51:03, 5 January 2025)
- ML18153C658 + (23:51:04, 5 January 2025)
- 05000280/LER-1991-011-01, :on 910406,simulated Design Basis Accident Conditions Resulted in Failure of Pumps to Develop Design Flow & Discharge Pressure.Caused by Inadequate Design. Permanent Mod of Radiation Sys Evaluated + (23:51:05, 5 January 2025)
- ML18153C656 + (23:51:07, 5 January 2025)
- ML18153C654 + (23:51:07, 5 January 2025)
- 05000280/LER-1991-010-01, :on 910530,inservice Testing Instrumentation Discovered to Exceeded Limits.Caused by Personnel Error. Calibration Data for Installed Instrumentation Used to Perform Testing Evaluated + (23:51:09, 5 January 2025)
- TAC:79105 + (23:51:10, 5 January 2025)
- ML18153C652 + (23:51:11, 5 January 2025)
- IR 05000280/1991010 + (23:51:12, 5 January 2025)
- TAC:79259 + (23:51:13, 5 January 2025)