Notifies of Withdrawal of 880707 Relief Request from ASME Section XI Flow Instrument Accuracy Requirement for Inside Recirculation Spray Pumps 1-RS-P-1A & 1B,in Ref to Facility Inservice Insp Program
ML18153C701
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/14/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-426, NUDOCS 9108190097
Download: ML18153C701 (1)


Text

"' ' '

r:

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 14, 1991 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 INSERVICE INSPECTION PROGRAM WITHDRAWAL OF SUBMITTED RELIEF REQUEST Serial No.91-426 NURPC Docket No.

50-280 License No. DPR-32 In our letter (Serial No.88-430) dated July 7, 1988, Virginia Electric and Power Company requested relief from the ASME Section XI flow instrument accuracy requirement for the Inside Recirculation Spray Pumps, 1-RS-P-1 A and 1 B, at Surry Power Station Unit 1. The accuracy requirement could not be met at that time because of the test loop piping configuration that existed then. The test loop was modified during the subsequent refueling outage in order to support ASME Section XI testing requirements. Accordingly, we withdraw the relief request specified in our July 7, 1988 letter. Should you have any questions or require further information, please contact us.

jry truly yours,

/

W. L. Stewart Senior Vice President - Nuclear cc:

United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station