Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19042A125 + (10:08:36, 5 January 2025)
- ML19042A121 + (10:08:38, 5 January 2025)
- IR 05000324/2018004 + (10:08:38, 5 January 2025)
- RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS + (10:08:39, 5 January 2025)
- ML19042A115 + (10:08:40, 5 January 2025)
- ML19042A110 + (10:08:41, 5 January 2025)
- ML19042A108 + (10:08:41, 5 January 2025)
- IR 05000338/2018004 + (10:08:49, 5 January 2025)
- SECY-19-0037, Enclosure 1 - Reactor Oversight Process Program Area Evaluations + (10:08:50, 5 January 2025)
- IR 05000482/2018004 + (10:09:06, 5 January 2025)
- ML19042A080 + (10:09:06, 5 January 2025)
- 05000461/LER-2018-003-01, Load Driver Card Failure Resulting in High Pressure Core Spray Inoperability + (10:09:09, 5 January 2025)
- ML19042A076 + (10:09:10, 5 January 2025)
- ML19042A074 + (10:09:11, 5 January 2025)
- ML19042A075 + (10:09:11, 5 January 2025)
- ML19042A073 + (10:09:12, 5 January 2025)
- ML19042A072 + (10:09:13, 5 January 2025)
- ML19042A023 + (10:09:16, 5 January 2025)
- ML19042A026 + (10:09:16, 5 January 2025)
- LR-N19-0011, In-Service Inspection Activities - 90-Day Report + (10:09:17, 5 January 2025)
- ML19042A018 + (10:09:18, 5 January 2025)
- RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure. + (10:09:18, 5 January 2025)
- 05000390/LER-2018-006, Containment Air Return Fan Inoperable for a Time Period Longer than Allowed by Technical Specifications Due to an Inadequate Post Maintenance Test + (10:09:24, 5 January 2025)
- ML19039A362 + (10:09:25, 5 January 2025)
- ML19039A354 + (10:09:26, 5 January 2025)
- ULNRC-06482, Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System + (10:09:27, 5 January 2025)
- 05000416/LER-2018-010, Reactor Manual Scram Due to Main Turbine Bypass Valve Drifting Open + (10:09:31, 5 January 2025)
- ML19039A274 + (10:09:33, 5 January 2025)
- ML19039A277 + (10:09:33, 5 January 2025)
- RS-19-021, Withdrawal of License Amendment Request for a One-Time Extension to Byron Station, Units 1 and 2 Technical Specification 3.8.1, AC Sources-Operating, Required Action a + (10:09:34, 5 January 2025)
- ML19039A268 + (10:09:35, 5 January 2025)
- ND-19-0119, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule + (10:09:36, 5 January 2025)
- ML19039A254 + (10:09:36, 5 January 2025)
- ML19039A253 + (10:09:37, 5 January 2025)
- ML19039A243 + (10:09:38, 5 January 2025)
- ML19039A242 + (10:09:38, 5 January 2025)
- ML19039A241 + (10:09:39, 5 January 2025)
- ML19039A236 + (10:09:40, 5 January 2025)
- ML19039A238 + (10:09:40, 5 January 2025)
- ND-19-0065, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.17 (Index Number 822) + (10:09:41, 5 January 2025)
- ML19039A223 + (10:09:42, 5 January 2025)
- RAIO-0219-64485, LLC Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application + (10:09:43, 5 January 2025)
- IR 05000237/2018004 + (10:10:40, 5 January 2025)
- ML19039A180 + (10:10:41, 5 January 2025)
- ML19039A174 + (10:10:42, 5 January 2025)
- ML19039A164 + (10:10:43, 5 January 2025)
- ML19039A154 + (10:10:44, 5 January 2025)
- ML19039A151 + (10:10:44, 5 January 2025)
- ML19039A149 + (10:10:45, 5 January 2025)
- ML19039A121 + (10:10:48, 5 January 2025)
- NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR + (10:10:48, 5 January 2025)