___________
(x) x 31310018D0011 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
See Schedule 785915794 BECKMAN ASSOCIATES INC NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ See Block 16C P00002 6
1
- 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
- 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS FACILITY CODE CODE 10B. DATED (SEE ITEM 13) 10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11) 9A. AMENDMENT OF SOLICITATION NO.
CODE
- 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
- 7. ADMINISTERED BY (If other than Item 6)
CODE
- 6. ISSUED BY PAGE OF PAGES
- 4. REQUISITION/PURCHASE REQ. NO.
- 3. EFFECTIVE DATE
- 2. AMENDMENT/MODIFICATION NO.
- 5. PROJECT NO. (If applicable)
- 1. CONTRACT ID CODE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 08/23/2018 1071 STATE RTE 136 SUITE 20 BELLE VERNON PA 150122926 CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT:
Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
FAR 52.243-2 Changes - Cost Reimbursement; 2009.570-9 OCOI Waiver x
- 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
X 1
The purpose of this modification number 002 is to (1) revise NRCAR 2052.209-72 "Contractor Organizational Conflict of Interest" clause, specifically paragraphs (c)(3) and (c)(4). This change is necessary to remove the "work for others" restriction from the end of the task order to the end of individual inspections, (2) replace references from Inspection Manual Chapter (IMC) 0612, "Power Reactor Inspection Reports" to Inspection Manual Chapter (IMC) 0611, "Power Reactor Inspection Reports" and (3) revise Continued...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 15A. NAME AND TITLE OF SIGNER (Type or print) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED (Signature of person authorized to sign)
(Signature of Contracting Officer)
JEFFREY R. MITCHELL STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243 Previous edition unusable Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect.
02/08/2019
ITEM NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2
6 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF BECKMAN ASSOCIATES INC (A)
(B)
(C)
(D)
(E)
(F) 31310018D0011/P00002 Attachment No. 1 entitled Contractor Inspector Performance Assessment Form Accordingly the contract is modified as follows:
Total Obligation Amount: $0.00 (Unchanged)
Exercised Ceiling Amount: $4,485,997.72 (Unchanged)
Total Ceiling Amount: $11,612,503.82 (Unchanged)
Period of Performance: 09/01/2018 to 08/31/2020 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
310018D0011 Modification No.2 (1) Incorporate revisions to NRCAR clause 2052-209-72 "Contractor Organizational Conflicts of Interest".
As a result of this action paragraphs (c)(3) and (c)(4) of NRCAR 2052.209-72 are hereby deleted and replaced with the following:
Paragraph (c)(3)
When the contractor performs work for the NRC under this contract at any NRC licensee or applicant site, the contractor shall neither solicit nor perform work in the same or similar technical area for that licensee or applicant organization for a period commencing with the beginning of work on a particular inspection and ending one year after completion of all work relating to that particular inspection.
Paragraph (c)(4)
When the contractor performs work for the NRC under this contract at any NRC licensee or applicant
- site, (i)
The contractor may not solicit work at that site for that licensee or applicant during the period of performance of the particular inspection task; (ii)
The contractor may not perform work at that site for that licensee or applicant during the period of performance of the particular inspection task, and for one year thereafter; (iii)
Notwithstanding the foregoing, the contracting officer may authorize the contractor to solicit or perform this type of work (except work in the same of similar technical area) if the contracting officer determines that the situation will not pose a potential for technical bias or unfair competitive advantage.
(2) Replace references from Inspection Manual Chapter (IMC) 0612, "Power Reactor Inspection Reports" to Inspection Manual Chapter (IMC) 0611, "Power Reactor Inspection Reports" Remove References from IMC 0612 Replace with IMC 0611 Guidance on IMC 0611 Power Reactor Inspection Reports can be found below:
Area Chapter Title Issue Date CN Number Word IMC 0611 Power Reactor Inspection Reports 12/13/17 17-029
.docx IMC 0611 Exh 1 Standard Reactor Inspection Report Outline 12/13/17 17-029
.docx IMC 0611 Exh 2 Inspection Report Documentation Matrix 12/13/17 17-029
.docx IMC 0611 App A Acronyms Used in Inspection Reports 12/13/17 17-029
.docx IMC 0611 App C Guidance for Supplemental Inspection Reports 12/13/17 17-029
.docx
IMC 0611 App D Guidance for Problem Identification and Resolution Inspection 12/13/17 17-029
.docx (3) Refer to Section C - Statement of Work, Attachment No 1 entitled Contractor Inspector Performance Assessment Form is hereby deleted in its entirety and replaced with the following Attachment No. 1 Contractor Inspector Performance Assessment Form - Revision.
ATTACHMENT 1-CONTRACTOR INSPECTOR PERFORMANCE ASSESSMENT FORM -
REVISION Contractor Inspectors Name/Discipline:
Plant Name:
Inspection Dates:
Team Leader:
Please check Yes or No for the performance requirements. Provide comments for all performance requirements checked No in COMMENTS section below.
INSPECTION PLANNING AND PREPARATION Yes No 1
Completed all site access requirements, information technology, and other continuing training requirements prior to inspection. Training did not lapse during inspection.
2 Followed team leader direction regarding inspection plan requirements.
3 Developed appropriate inspection plan for assigned area and submitted inspection plan, verbally or in writing, to the team leader.
4 Prioritized inspection plan based on complexity, risk significance, and margin.
5 Reviewed necessary design and licensing basis documents of the licensees facility.
6 Developed relevant questions for licensee based on review of documents within the design and licensing basis of the licensees facility.
7 Scheduled travel to ensure attendance at entrance/exit meetings and onsite inspection schedule established by the team leader.
INSPECTION ACTIVITIES Yes No 1
Performed an in-depth, objective review, appropriate to the design and licensing basis of the facility, to identify and develop inspection findings from NRC requirements and standards, or to determine there are no findings.
2 Evaluated assigned sample selection based on technical discipline expertise and familiarity of NRC regulations and standards.
3 Effectively used inspection time, altered inspection activities when appropriate, and was responsive to team leader direction regarding issues not to be worked upon.
4 Exhibited professional speaking and listening skills during interactions with licensee and other team members.
5 Provided daily1 progress reports, written or verbal, to team leader by close of business during home office review period.
6 Communicated issues or findings during team meetings (no surprises at exit meetings) to appropriately characterize the safety significance of the issues.
1 Or an appropriate frequency determined by the team leader.
INSPECTION ACTIVITIES Yes No 7
Presented information accurately to support findings in a clear and professional manner to the team and licensee, when necessary.
8 Provided written notes, within one business day of identifying a deficiency, which include the issue of concern, NRC or industry requirement not met, and recommendation on minor or more-than-minor safety significance of noncompliance.
9 Followed NRC information security requirements. Appropriately used NRC provided e-mail account to send or receive sensitive information (information that is not releasable to the public).
INSPECTION DOCUMENTATION Yes No 1
Followed team leader direction/sample report and documents reviewed, as required to comply with IMC 0611, Power Reactor Inspection Reports.
2 Provided report input which clearly supported the issuance of inspection findings and violations using factual information, dates, and appropriate references to design and license basis of the facility.
3 Provided report input in electronic format acceptable to team leader within seven calendar days after the inspection exit date2.
COMMENTS (Provide comments for all attributes checked No. When a performance requirement is not met, the deficiency will be first brought to contractor inspector's attention by the team leader. Significant or repetitive deficiencies will be brought to the attention of the contractor for resolution by the NRC COR.)
2 The team leader may extend this due date if additional reviews are necessary.