Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:10558 + (14:23:39, 4 January 2025)
- ML19250C008 + (14:23:42, 4 January 2025)
- 05000289/LER-1979-016-01, /01T-0:on 791001,error in Seismic Analysis for ladder-type Support for Water Piping May Have Resulted in Exceeding of code-allowable Stresses.Caused by Error in Design Drawings.Engineering Evaluation in Progress + (14:23:43, 4 January 2025)
- ML19250C005 + (14:23:59, 4 January 2025)
- 05000267/LER-1979-040-03, Ler 79-040/03L-0:on 791001,two Snubbers Required During Power Operation Found Inoperable.Caused by Oil Reservoir Leak in HRS-194 & Loose Lock Nut on HOS-29.Reservoir Refilled & Lock Nut Tightened + (14:24:01, 4 January 2025)
- 05000289/LER-1979-016, Forwards LER 79-016/01T-0 + (14:24:03, 4 January 2025)
- 05000346/LER-1979-097-03, /03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced + (14:24:04, 4 January 2025)
- ML19250B999 + (14:24:05, 4 January 2025)
- 05000237/LER-1979-054, Forwards LER 79-054/03L-0 + (14:24:07, 4 January 2025)
- 05000346/LER-1979-097, Forwards LER 79-097/03L-0 + (14:24:09, 4 January 2025)
- ML19250B994 + (14:24:10, 4 January 2025)
- 05000302/LER-1979-097-03, /03L-0:on 791005,chem/rad Sampling Revealed That Reactor Coolant Sys Dose Equivalent I-131 Exceeded 1.0 Uci Per Gram.Caused by Instrument Failure Requiring Removal of Demineralizers from Svc.Dose Reduced & Instrument Repaire + (14:24:14, 4 January 2025)
- 05000029/LER-1979-019-04, /04X-0:on 790801,direct External Radiation Monitor at Station 9 Was Missing.Cause Unknown.No Corrective Action Planned Other than Replacement of Missing Monitor + (14:24:16, 4 January 2025)
- 05000029/LER-1979-019, Forwards LER 79-019/04X-0 + (14:24:18, 4 January 2025)
- 05000267/LER-1979-040, Forwards LER 79-040/03L-0 + (14:24:20, 4 January 2025)
- 05000302/LER-1979-097, Forwards LER 79-097/03L-0 + (14:24:22, 4 January 2025)
- 05000237/LER-1979-055, Forwards LER 79-055/03L-0 + (14:24:23, 4 January 2025)
- 05000029/LER-1979-024-03, /03L-0:on 791004,during Maint shutdown,CS-MOV-540 Isolated for Repair,Keeping Flow Paths Inoperable.Caused by CS-MOV-540 Leaking by CS-MOV-540 Gate Valve Resulting in Insufficient Gate & Seat Contact.Gate Machined + (14:24:25, 4 January 2025)
- 05000266/LER-1979-015-01, /01T-0:on 791002,during Normal Power Operation, Loose Tube Fitting Discovered on Common Line from containment-to-containment Pressure Transmitters.Cause Undetermined.Fitting Tightened + (14:24:27, 4 January 2025)
- ML19250B977 + (14:24:30, 4 January 2025)
- 05000029/LER-1979-024, Forwards LER 79-024/03L-0 + (14:24:32, 4 January 2025)
- ML19250B973 + (14:24:33, 4 January 2025)
- 05000266/LER-1979-015, Forwards LER 79-015/01T-0 + (14:24:35, 4 January 2025)
- ML19250B968 + (14:24:37, 4 January 2025)
- ML19250B967 + (14:24:38, 4 January 2025)
- 05000298/LER-1979-025-03, /03L-0:on 790912,HPCI Turbine Stop Valve Separated from Actuator at Split Coupling.Caused by Improperly Mfg Split Coupling.Split Coupling Replaced & Installation Procedures Revised + (14:24:39, 4 January 2025)
- ML19250B965 + (14:24:40, 4 January 2025)
- 05000298/LER-1979-025, Forwards LER 79-025/03L-0 + (14:24:41, 4 January 2025)
- ML19250B962 + (14:24:42, 4 January 2025)
- 05000254/LER-1979-026-03, /03L-0:on 790914,during Reactor Shutdown,Outboard MSIV A0-1-203-2C Would Not Fully Close.Caused by Sticking Air Pilot Valve.Pilot Disassembled,Inspected & Replaced. MSIV Stroked & Timed to Close in 3.9-s + (14:24:44, 4 January 2025)
- ML19250B960 + (14:24:45, 4 January 2025)
- ML19250B958 + (14:24:48, 4 January 2025)
- ML19250B957 + (14:24:49, 4 January 2025)
- 05000254/LER-1979-026, Forwards LER 79-026/03L-0 + (14:24:50, 4 January 2025)
- ML19250B952 + (14:24:53, 4 January 2025)
- ML19250B949 + (14:24:54, 4 January 2025)
- 05000366/LER-1979-113-03, /03L-0:on 791012,during Reactor Startup,Hydrogen Gas Concentration,As Measured Downstream of Recombiners, Increased to Greater than Tech Spec Limit.Probably Caused by Moisture Carry Over from Steam Jet Air Ejector to Preheat + (14:24:55, 4 January 2025)
- 05000366/LER-1979-113, Forwards LER 79-113/03L-0 + (14:24:57, 4 January 2025)
- ML19250B944 + (14:24:59, 4 January 2025)
- ML19250B942 + (14:25:00, 4 January 2025)
- ML19250B941 + (14:25:01, 4 January 2025)
- ML19250B940 + (14:25:02, 4 January 2025)
- ML19250B938 + (14:25:09, 4 January 2025)
- ML19250B937 + (14:25:10, 4 January 2025)
- ML19250B936 + (14:25:11, 4 January 2025)
- ML19250B935 + (14:25:12, 4 January 2025)
- ML19250B933 + (14:25:13, 4 January 2025)
- ML19250B932 + (14:25:14, 4 January 2025)
- ML19250B931 + (14:25:19, 4 January 2025)
- ML19250B929 + (14:25:23, 4 January 2025)
- ML19250B927 + (14:25:24, 4 January 2025)