Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19254F949 + (09:46:12, 4 January 2025)
- ML19254F948 + (09:46:14, 4 January 2025)
- 05000336/LER-1979-033-03, /03L-0:on 791011,during Routine Maint,Leakage Discovered on Recovered Boric Acid Pump Suction Line.Caused by Chloride Stress Corrosion Due to Salt Water Leakage to Aerated Waste Drains.Pipe Spool Will Be Replaced + (09:46:46, 4 January 2025)
- ML19254F946 + (09:46:52, 4 January 2025)
- 05000336/LER-1979-033, Forwards LER 79-033/03L-0 + (09:47:32, 4 January 2025)
- ML19254F943 + (09:47:37, 4 January 2025)
- ML19254F942 + (09:47:38, 4 January 2025)
- ML19254F941 + (09:47:40, 4 January 2025)
- ML19254F940 + (09:47:41, 4 January 2025)
- ML19254F939 + (09:47:42, 4 January 2025)
- 05000295/LER-1979-084-03, /03L-0:on 791006,fire Sump Rad Monitor Alarmed at Level Below Alarm Setpoint.Caused by Two Broken Pins Connecting Bin to Module.Pins Replaced.Monitor Tested & Returned to Svc + (09:47:45, 4 January 2025)
- ML19254F937 + (09:47:50, 4 January 2025)
- ML19254F936 + (09:47:51, 4 January 2025)
- ML19254F934 + (09:47:52, 4 January 2025)
- 05000295/LER-1979-084, Forwards LER 79-084/03L-0 + (09:47:54, 4 January 2025)
- ML19254F931 + (09:47:56, 4 January 2025)
- 05000278/LER-1978-014-03, /03L-0:on 780626,at Power Operation,Shutoff Valve on Pressure Switch Found Closed.Caused by Closure During 780621 Testing.Valve Reopened & Valving for Safety Instrumentation Checked + (09:48:20, 4 January 2025)
- ML19254F929 + (09:48:24, 4 January 2025)
- ML19254F928 + (09:48:25, 4 January 2025)
- 05000304/LER-1979-053-03, /03L-0:on 791009,boron Concentration Found Below Min Concentration of 11.5%.Caused by Back Leakage from RCS Through Check Valves Open Due to Limit Switches Being Out of Adjustment.Switches Adjusted + (09:48:28, 4 January 2025)
- ML19254F926 + (09:48:30, 4 January 2025)
- ML19254F924 + (09:48:31, 4 January 2025)
- ML19254F923 + (09:48:32, 4 January 2025)
- ML19254F922 + (09:48:34, 4 January 2025)
- 05000304/LER-1979-053, Forwards LER 79-053/03L-0 + (09:48:38, 4 January 2025)
- 05000295/LER-1979-082-03, /03L-0:on 791006,failed Fuel Letdown Liquid Rad Monitor 1RT-PR27 Failed Low & Could Not Be Reset.Cause Unknown.Monitor Reconnected & Returned to Svc + (09:48:42, 4 January 2025)
- ML19254F918 + (09:48:47, 4 January 2025)
- ML19254F914 + (09:48:50, 4 January 2025)
- ML19254F913 + (09:48:51, 4 January 2025)
- ML19254F912 + (09:48:53, 4 January 2025)
- 05000219/LER-1979-025-03, /03L-0:on 790806,10,000 Gallons of Torus Water Drained & Ability of Primary Containment Degraded.Caused by Isolation Valve Left Open After Water Samplings.Change to Sampling Procedure Submitted on Use of Valve + (09:49:40, 4 January 2025)
- ML19254F910 + (09:49:45, 4 January 2025)
- 05000219/LER-1979-025, Forwards LER 79-025/03L-0 + (09:50:33, 4 January 2025)
- 05000219/LER-1979-024-03, /03L-0:on 790730,control Rod Drive Pump a Discovered Spraying Water Through Seal.Caused by Failure of Mechanical Seal.Inboard Mechanical Seal & Inboard Bearing Replaced + (09:51:18, 4 January 2025)
- 05000267/LER-1979-046-03, /03L-0:on 791011,noted That Sequence of Manual Switching of Primary Coolant Low Level Dew Point Moisture Monitors Can Result in Degraded Mode of Limiting Conditions for Operation.Sys Operating Procedure Revised + (09:51:45, 4 January 2025)
- ML19254F904 + (09:51:47, 4 January 2025)
- 05000219/LER-1979-024, Forwards LER 79-024/03L-0 + (09:52:20, 4 January 2025)
- ML19254F901 + (09:52:25, 4 January 2025)
- ML19254F900 + (09:52:26, 4 January 2025)
- ML19254F899 + (09:52:28, 4 January 2025)
- ML19254F897 + (09:52:30, 4 January 2025)
- ML19254F898 + (09:52:30, 4 January 2025)
- ML19254F896 + (09:52:32, 4 January 2025)
- 05000267/LER-1979-046, Forwards LER 79-046/03L-0 + (09:53:04, 4 January 2025)
- ML19254F892 + (09:53:36, 4 January 2025)
- ML19254F890 + (09:53:38, 4 January 2025)
- ML19254F887 + (09:54:09, 4 January 2025)
- 05000304/LER-1979-049-03, /03L-0:on 791009,during Reactor Trip,Breaker a Failed to Open & Was Tripped Manually.Caused by Binding Coil Mechanism Which Could Not Raise Trip Bar.Mechanism Lubricated & Tested.Other Breakers Tested & Adjusted + (09:54:15, 4 January 2025)
- ML19254F885 + (09:54:18, 4 January 2025)
- ML19254F884 + (09:54:20, 4 January 2025)
- 05000304/LER-1979-049, Forwards LER 79-049/03L-0 + (09:54:23, 4 January 2025)