05000336/LER-1979-033, Forwards LER 79-033/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 79-033/03L-0
ML19254F944
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/09/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19254F945 List:
References
MP-2-4191, NUDOCS 7911190492
Download: ML19254F944 (1)


LER-1979-033, Forwards LER 79-033/03L-0
Event date:
Report date:
3361979033R00 - NRC Website

text

i

)

1 It103rf533551ST IJTd3.TT5355 hh:.).lk s S ""~ ""

1

(

< 1 x = = = =:

Hovember 9,1979 MP-2-4191 Mr. Boyce H. Grier Director, Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License flo. DPR-65 Docket flo. 50-336 Reportable Occurrence R0-50-336/79-33/3L

Dear !!r. Grier:

This letter forwards Licensee Event Report 79-33/3L required to be submitted within thirty days pursuant to !!illstone Unit 2 Appendix A Technical Specifications 6.9.1.9.d, abnomal degradation of a systea designed to contain radioactive material resulting frca the fission process. An additional three copies of the report are enclosed.

Yours truly, AC onF.pA Opeka Station Superintendent Millstone t!uclear Power Station JF0/ RAS:llm

Attachment:

LER 79-33/3L cc: Director, Office of Inspection and Enforcement, Washington, D.C.

(30)

Director, Office of Management Information and Program Control, Washington, D. C. (3) 1914 159 7911190 VfC