Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-86-375, Monthly Operating Repts for Aug 1986 + (11:43:05, 4 December 2024)
- ML20212C757 + (11:43:06, 4 December 2024)
- ML20212C756 + (11:43:06, 4 December 2024)
- ML20212C755 + (11:43:07, 4 December 2024)
- ML20212C754 + (11:43:07, 4 December 2024)
- ML20212C753 + (11:43:08, 4 December 2024)
- ML20212C752 + (11:43:09, 4 December 2024)
- ML20212C751 + (11:43:09, 4 December 2024)
- ML20212C750 + (11:43:10, 4 December 2024)
- ML20212C745 + (11:43:11, 4 December 2024)
- ML20212C742 + (11:43:12, 4 December 2024)
- 05000353/LER-1999-010, :on 990820,manual Actuation of Main CR Chlorine Isolation Mode Was Noted.Caused by Faint Chlorine Odor in Reactor Encl.Conducted Investigation & Was Unable to Locate Source of Odor + (11:43:13, 4 December 2024)
- ML20212C739 + (11:43:14, 4 December 2024)
- U-602853, Responds to NRC Re Violations Noted in Insp Rept 50-461/97-07.Corrective Actions:Revised Procedure 3317.01 to Close Containment Isolation Valves Prior to Stopping Fuel Pool Cooling & Cleanup Sys Flow + (11:43:14, 4 December 2024)
- ML20212C738 + (11:43:15, 4 December 2024)
- U-600842, Forwards Rev to Physical Security Plan,Per 10CFR50.54(p). Summary of Changes Encl.Rev Withheld + (11:43:15, 4 December 2024)
- ML20212C733 + (11:43:16, 4 December 2024)
- ML20212C732 + (11:43:16, 4 December 2024)
- ML20212C729 + (11:43:17, 4 December 2024)
- NSD-NRC-97-5388, Forwards Summary of W Responses Re Nuclear Island Basement. Response Should Permit Resolution of All Remaining Open Items Re Nuclear Island Basement + (11:43:20, 4 December 2024)
- PNO-IV-97-060, on 971027,portal Monitor Had Alarmed When Vehicle Carrying Load of Scrap Metal Arrived at Facility. Commonwealth Aluminum Reported,Routinely Received Magnesium from Std Metals,Also of Carson,Ca.State of CA Informed + (11:43:21, 4 December 2024)
- ML20212C717 + (11:43:22, 4 December 2024)
- 05000457/LER-1997-002-08, :on 970927,reactor Trip Breakers Were Manually Opened Due to Decoder & Encoder Control Card Failure. Replaced Defective Card & re-performed Surveillance Prior to Unit Startup + (11:43:24, 4 December 2024)
- ML20212C715 + (11:43:24, 4 December 2024)
- NRC-97-0097, Responds to NRC Re Violations Noted in Insp Repts 50-341/97-02 & 97-03.Corrective actions:multi-discipline Team Identified & Investigated Potential Factors Re Binding of Fused Disconnect Switch Operating Mechanism + (11:43:25, 4 December 2024)
- ML20212C710 + (11:43:26, 4 December 2024)
- ML20212C708 + (11:43:27, 4 December 2024)
- ML20212C707 + (11:43:27, 4 December 2024)
- IR 05000254/1999017 + (11:43:29, 4 December 2024)
- ML20212C704 + (11:43:29, 4 December 2024)
- ML20212C703 + (11:43:30, 4 December 2024)
- ML20212C702 + (11:43:31, 4 December 2024)
- ML20212C696 + (11:43:32, 4 December 2024)
- ML20212C697 + (11:43:32, 4 December 2024)
- ML20212C693 + (11:43:33, 4 December 2024)
- ML20212C691 + (11:43:34, 4 December 2024)
- U-602832, Forwards Rev 2 to CPS TS Bases,Consisting of Pages Annotated W/Rev Numbers 2-1 Through 2-14.Text Changes Identified by Rev Bars + (11:43:35, 4 December 2024)
- ML20212C686 + (11:43:36, 4 December 2024)
- ML20212C682 + (11:43:38, 4 December 2024)
- ML20212C677 + (11:43:39, 4 December 2024)
- PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power + (11:43:40, 4 December 2024)
- CY-97-109, Provides Addl Info Re Proposed Defueled Emergency Plan & Util Request for Exemption from 10CFR50.54(q).Defueled EPIP Depip 1.5-1, Emergency Assessment Using Defueled EAL Tables & Draft Procedure Rev 20 to ACP 1.0-6,encl + (11:43:41, 4 December 2024)
- ML20212C672 + (11:43:42, 4 December 2024)
- ML20212C669 + (11:43:43, 4 December 2024)
- NSD-NRC-97-5402, Summarizes Breaks That Need to Be Considered for AP600 as Result of LBB Evaluations Performed Re Pipe Rupture Analysis.Pipe Rupture LOCA Dynamic Transient Limiting Case Analysis,Encl + (11:43:43, 4 December 2024)
- PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 + (11:43:44, 4 December 2024)
- ML20212C665 + (11:43:45, 4 December 2024)
- PNO-II-88-003, licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing + (11:43:45, 4 December 2024)
- ML20212C663 + (11:43:46, 4 December 2024)
- ML20212C660 + (11:43:48, 4 December 2024)
- ML20212C659 + (11:43:48, 4 December 2024)