_._
_.. ~.
Sergenti.[.
Lundy"c 1
- Don K. Schopfer -
Vice President 312 269-6078 October 28,1997 Project No.- 9583-100
- Docket No. 50-423 Nortlicast Nuclear Energy Company.
- Millstone Nuclear Power Station, Unit No. 3.
Independent Corrective Action Verification Program United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I have enclosed the following fifteen (15) discrepancy reports (DRs) identified during our review activities for the ICAVP, These DRs are being distributed in accordance with the Conununications Protocol, PI-MP3-01.
DR No. DR-MP3-0068 DR No. DR-MP3-0280
- DR No. DR-MP3-0163 DR No. DR-MP3-0291 DR No. DR-MP3-0214 DR No. DR-MP3-0301 DR No. DR-MP3-0233 DR No'. DR-MP3-0353 DR No. DR-MP3-0242 DR No. DR-MP3-0354
. DR No, DR-MP3-0254 DR No. DR-MP3-0356 q
DR No. DR-MP3-0256 DR No. DR-MP3-0359 I ha've also enclosed the following three (3) DRs that.have been determined invalid. No action is required from Northet Utilities for these three DRs. The basis for their invalid t
J
- determination is included on the document.
t DR No.~ DR-MP3-0258
[
DR No. DR-MP3-0288 g
DR'No. DR-MP3-0492 9710300152 971028 lil'llllllMlll1 l PDR ADOCK 05000423 mii
.I p
pg y
SN East Monroe Street Chicago, IL 60603-5780 USA = 312-269-2000 4
-_-.. -.~..
O' P
United Otates Nuclear Regulatory Commission October 281997 Document Control Desk Project No. 9583 100 Page 2 l
f Please direct any questions to me at (312) 269-6078.
Yours very truly, J
).T N
D. K. Sc opfer h
Vice President and ICAVP Manager DKS:spr Enclosures Coples:
E. Imbro (1/1) Deputy Director, ICAVP Oversight T. Concannon (1/l) Nuclear Energy Advisory Council J. Fougere (1/1) NU r-&astunt 97w102Ba ew s
9 d
t i
\\
t s.y
~ -...
,.--,.m.,,-
3--.
y.
.~
Northeast Utilities ICAVP DR No. DR-MP3 0064 l
Millstorm Unit 3 Discrepancy Report Rev6ew Group: Confguraton DR VALID Rev6ew Elernent: System instaliaton Potential @rebMy lam Disc 6phne: Doctrical Desgn O Yo.
06ecrepency Type: Installaton implementaten
,,3 y, System' Process: SWP NRC Signancance level: 3 Date faxed to NU:
Date Published: 10/3397 D6.crepency2 Cable Tray Cover not instsIliJ in Accorrance with Drawing De*cr6 ekm: Drawliig EE.34TB Rev,1 (H 5) Lidicates the cover on tray riser P
3TL7530 shall extend fiom elevation 29'.3* to 35' 8*. The installed cover starts at elevation 22' extending upward to the end of the tray, The additional cover may affect the ampacity of the included power cabler Rev6ew Vehd inval6d Needed Date initialor: Larver, T. L.
O O
O 10/17'87 VT Lead: Neri, Anthony A O
O O
10/17/97 VT Mgt: Schopfer, Don K O
O O
10'20S7 IRC Chmn: Singh, Anand K O
O O
in/27/97 Dete:
INVALID:
Date:
RESOLUTION:
Prov60usly identshed by NUF Q Yes ' # ' No Non Discrepent Condetion C) Yes i No Rev6ew
^ * * *
- init6ator: Sarver, T. L.
VT Lead: Nort, Anthony A VT Mgri Schopfer, Don K IRC Chmn: Singh, Anand K D.te:
SL Conwnents:
Pnnled 1GTB97 9 3416 AM Pah1of1
Northeast Utilities ICAVP DR No. DR MP3 0163 Millstone unN 3 Discrepancy Report Review a,ou,: stoiem DR vAuo
{
Rev6ew Element: s elem Doo9n r
Di.ewine: uset.u Dee9n poterdial oporability issue o yee Discrepancy Type: Calculaton e) No system /Procese: RSS NRC slenificance level: 4 Date faxed to NO:
Date Publi6hed: 10%97 D6*crepancy: Cal,xelation P(R)-621 Inaccuacies Deecripeton: The RGS De Watering Pump discharge piping is approximately 30 feet long. The calculation Indicates this piping is it feet long. See Drawing EP 79K for pipe length. By not including this portion of pipe, the total developed head is underestimated which is not at:ceptable.
The flow rates for the De Waaring system are under 150 gpm for all line s!zes which include 1%',2",10" and 12" pipes. The calculation references Crane Technical Paper #410 for the head loss per 100 feet of piping. The papr provides head loss data l
for a 10" pipe starting at 475 gpm and for a 12" pipe starting at 700 gpm. The head loss is proportional to the square of the flow. The resulting head losses calculated using the square of the flow method are smaller than the values used.
Review Val 6d invalid Needed Date initiator; Langel, D.
O O
O 10S7 VT Lead: Nort. Anthony A g
g Q
io/7/97 VT Mgri Scropfer Don K O
O O
10'12S7 IRC Cturin: Sngh, Anand K Q
U O
ia27/or Dele:
INVALID:
Date:
RESOLUTION:
Prov6ously identifled by Nu7 O Yee + No Non Discrepent Condellon O Yet
(#1 No Review Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgri Schopfer, Don K IRC Chmn: Singh, Anand K D.i.:
sL Comments:
Pnnted 1GT&97 9 35 33 AM Page1 of 1 h
tf O
Northeast Utilities ICAVP DR No. DR MP3 0214 Millstone Unit 3 Discrepancy Report Rev6ew Group: System DP VALID Review Element: System Desgn PotentW Operebusy leaue D6ecipline: I & C Doesgn Q y,,
D6screpancy Type: Drawing (e) tao systerr#tocese: OSS i
NRC signencence level: 4 Date faxed to NO:
Date Putdeshed: 1Q%97 D6ecrepency: Drawing Discrepancy. Schematic 30SS-060 D. cription: Jumper between terminals 'C65" and *C65* of TB14 in Annunciator Logic Cabinet 3lHA ANNMB2 not shown; jumper shown on Wiring Diagram EE 4R, Rev 5, Review Valid invei6d Needed Date initiator: Pinoise, H.
g
]
y 10/14S7 VT Lead: Nort Anthony A O
J O
io/1'S7 VT Mgr: Schopfer, Don K O
O O
io2aS7 IRC Chnus: Singh, Anand K O
O O
'S27/87 D.ie:
INVALID:
Date:
RESOLUTION:
Prov60uely identined by NUF Q Yee
'91 No Non D6.crepar[Condet6cn V Yee (9) No Rev6ew inMielor Pinetee, H VT Lead: Nort, Anthony A VT Mgra Schopfer, Don K 1RC Chmn: Singh, Anand K Date:
SL Commente:
Printed 10?&97 g.37.43 AM Page 1 of i
./
)
Northeast Utilities ICAVP DR No. DR44P3 4233 Millstone unit 3 Discrepancy Report Rev6ew Group: System DR VALID I
Disc 6pl6 net t & C Des **
PoterW6al Operab64 sty is6ue O va Discrepancy Type: Drewm0
- g) y, System'Procesa
- SWP NRC 56 nincance level: 4 3
Date faxed to NU:
Date Published: 1G"Ja97 Discrepancy: Drawing Discrepancy. LSK 9100,K Descript6on: Control Actions "3SWP'MOV102A Open/ Auto" on LSK 9-10K and *3SWP'MOV102B Open/ Auto" on LSK 9100 should be depicted as two separate Control Actions; one for Open and one int Auto to provide the capability for opening MOV102A and MOV1028 manually or automatically to agree with the P&lD.
Monitor designation between Source and Condition for 3SWP'MOV102A on LSK 910K should be changed from "A" to "S" at MB5R. The monitor designation 'A'is shown twice.
Note 1 on LSK 9100 references "LSK 910J (28193 Sh 9)*
rather than *LSK 910K (28193 Sh 10)".
noview Valid inva66d Needed Date inittetor: Pineles, H.
O O
O
$0'57/87 VT Lead: Nort. Anthony A O
O O
o'17/87 VT Mer: Schopfer, Don K O
O O
'S2SS7 IRC Chrnn: Singh, Anand K.
O C
C 1077/97 Date:
s INVALID:
i Date:
REsOLUTlON:
Prev 6ously identmed by NU7 O Yes. Lei No Non Discrepard Condet6on Q Yes
'98 No Rev6ew initialor: Penelas, H VT Lead: Nort, Anthony A VT Mgr: Schopfer,009 K s
INC Chnn: Singh, Anand K Date:
sL Comments:
Pnnted 1G?&97 9 36 55 AM Page 1 of 1
s b4 A
Northeast utilities ICAVP DR No. DR MP3 0242 Millstone Unit 3 Discrepancy Repoft Rev6ew Group: Confgureton DR VAllo Rev6ew Element: System installeton PMW OperabHNy boue Diecipl6ne: E!adrtcal Design O Yoo
(
Diecropency Type: Dreeng
- 4) y, systerWProcese: SWP NRC signinconce level: 4 Date faxed to NU:
Dale Published: 1o/3097 l
Dkcrepency: Differences in Support Drawings and TSO2 Data Deecripth: 1. Drawing EE 34DT Rev. 7 (C-4) shows tray support A306 26 for Tray 3T1140. TSO2 does not list this support, but lists a A307 26.
- 2. Several tray supports do not have mark numbers - which provide for the unique identification r,f a support based on a standard support type and the specific location - shown on the support location drawings (EE 34-DX Rev. 8 and EE 34DY Rev.
8 ). Therefore,it is not possible to reconcile these supports with TSO2. Example: for tray 3TX214N, three type 'A10$* supports are shown-TSO2 lists the A105 supports as 47, 53,41.
(typical situation with 34DY).
- 3. F E 20188 adds conduits to tray support A104 however, the drawing was not listed as impacted and no mention of the additional conduit loads (no other conduits are supported from this support) for the tray support was made on any the drawing.
- 4. Trays 3TX703N and 3TX706N are vortical risers located in the Fuel Building. These trays are shown on Support Detail Drawing EE 34 HM, Rev. 3. The supports are direct attachment angles to embedded strut. The tray is installed in acCordance with the detail of the drawing. TSO2 does not list any supports for these l
tray risers.
Review I
Valid inval6d Needed Date in6tietor: Server. T. L.
O O
O 10/'5S7
'/T Lead: Nort. Anthony A O
O O
1o/1597 VT Mgt: Schopfer. Don K O
O O
tor 2a97 IRC Chmn: Singh. Anand K O
O O
in27/97 Date:
IA fallo; Date:
RESOLUTION:
~
Previously identined by NU7 O Yes
- ) No Non D6screpent Condet6on O Yes ' 91 No Review
^** *
^ ' * *
- inttletor: Server. T. L VT Lead: Nort, Anthony A VT Mgr; Schopfer, Don K IRC Ctwnn: Singh, Anand K Date:
Pnnted 10?&97 9.38 M~
Page 1 of 2
. +
Northeast Utilities ICAVP DR N2. DR MP3 4242 Millstone Unit 3 Discrepancy Report m-.....,
Pnnted 10?&97 9 38 49 AM Page 2 of 2
s.
O' Northeast Utilities ICAVP DR No. DR-MP3 4254 Millstone UnN 3 Discrepancy Report Review Group: Accatent Mtepsten DR VAllD Rev6ew Element: Mn6nionance Procedure y
g,%
Diecipline: I & C Design Q y,,
Discrepancy Type: Calculaten (g] 9, Syste,rvProcese: N/A NRC signif6cance level: 4 Date faxed to NU:
Date Published: 10/3097 D6*crepency: Narrow Range Pressurtzer Pressure. Calibration Data Conversion (Discrepancy for Loop RCS*PT455)
D*ecription: The ICAVP reviewed the following documents in order to evaluate the pressurizer pressure function setpoints:
References:
- 1) FSAR Figure 7.21, sheets 6,8,11,18 and 19
- 2) Procedure 3442C10, Pressurtzer Pressure Narrow Range Channel 1 Calioration, Rev.1
- 3) I&C Form 3442C101 Rev.1 Data pages 3, and 8 through 17 of 19
- 4) Technical Specifications Manual. Table 2.21 items 9 and 10 Amendment 114; Table 3.3-4 item 1.d Amendment 60, and item 9.a Amendment 98 in reviewing these documents the ICAVP identifies the following discrepancies:
a) The use of the Engineering Unit Conversion Factor shown in the Reference 3) datn sheets, titled "SETPOINT REFERENCES *, will not convert the calibration data to th3 acceptable setpoint values shown in Reference 4).
SETPOINT
REFERENCE:
TECHNICAt. SPECIFICATIONS (TS) Table 2.21, item 10, (TRIP SETPOINT o2385psla);
1mA=50 PSIA (from Page 8 of Data Sheets).
For example in order to convert the calibration data of 17.664 mA (Data sheet page 8), to a pressure value and compare it with the acceptance criteria conteined in the TS of <=2385 psia the following calculations must be performed:
1mA=50 psi; Pressure Transmitter (PT455) offset =1700 psia (from Page 3 of Data Sheets. Including head correction);
Calibrated Pressure =1700+[(mA 4)x50]=2383.2(psia).
b) The Reference 1) Functional Diagram sheets contain a number of Notes. Some of these include a statement " Supplied by Others'. This does not reflect the MP3 as-built configuration.
Review Valid invalid Needed Date initiator: Balodes. V. E.
O O
O S'2497 VT Lead: Raheia. Raj D D
D D
S2'S7 Printed 10'2&97 9 56 47 ANW" N ' U"" N h bf 2
Northeast Utilities ICAVP OR N2, DR44P3 0254 Millstone Unit 3 Discrepancy Report VT Mgri Schopfer. Don K Q
Q W%7 IRC Chmn: Singh. Anand K G
O O
in27/87 Date:
INVALID:
Dele:
RESOLUTION:
Previously ident6 fled tsy NU7 O Yes iS) No Non D6ecrepent CondMion O Yes fSi No Rev6ew inMietor: Be6 ode. V. E.
VT Lead: Rehop, Raj D VT Mgr: Schopfer. Don K IRC Chmn: Singh Anotd K i
Date:
l SL Comments:
Printed 100%7 9 $6 54 AM Pege 2 of 2
Northeast Utilities ICAVP DR No. DR.MP3 0264 Millstone UnN 3 Discrepancy Report ReviewGroup: AccadertIAlgeten DR VALID Review Eiwnert: Maintenance Procature Diecip46ne: I & C Deedgn Potenud Opermy h l
O vee Discreparecy Type: Calculeton (9) No Syster VProcese: N/A
~
NRc Sierufnconca level: 4 Date faxed to NU:
t,ete Publ6shed: 10 % 97 D6ecrepancy: Containment Pressure. Calibration Data Conversion (Discrepancy for Loop LMS*PT936)
Deecription: The ICAVP reviewed the following documents in order to evaluate the containment pressure Engineered Safety Feature Actuation function setpoints.
I
References:
- 1) FSAR Figure 7.21, sheet 8, Rev.6
- 2) Procedure 3447A01, Rev 4, Contair, ment Pressure HI 1,2,3 Channel Calibration
- 3) I&C Form 3447A01 1, Rev.4, pages 11,15,16, and 17 of 38
- 4) Technical Specifications Manual, Table 3.3-4, items 1.c and 2.c Amendment 60, items 3.b.3 and 4.c Amendment 129, item 7.d Amendment 89 in reviewing these documents the ICAVP identifies the following l
discrepancies:
a) The use of the Engineering Unit Conversion Factor shown in the Reference 3) Data Sheets, titled *SETPOINT REFERENCES *, will not convert the calibration data to the acceptable setpoint value shown in Reference 4).
i SETPOINT
REFERENCE:
TECHNICAL SPECIFICATIONS (TS) Table 3.3-4, item 2c, 3.b.3), and 6.f (TRIP SETPOINT <=8.0 psig, <=8.0 psig, <=8.0 psig. resp.);
1 mA=3.75 PSI (from Page 17 of Data Sheets).
For example in order to convert the calibration data of 10.040 mA (from Page 17 of Data Sheets) to a pressure value.tnd compare it with an acceptance criteria contained in the TS of
<=8.0 psig the following calculations must be Prformed:
1 mA=3.75 PSIA:
Pressure Transmitter (PT936) Calibrated Range: 8.0 to 20,0 mA for 15.0 to 60.0 PSIA (from Page 11 of Data Sheets);
Calibrated Pressure =[(mA-4)X3.75] 14.7 = 7.95 (psig).
b) Reference 1) Functional Diagram contains 18 Notes. Notes 7, 9,10,12,13,15, and 17 include statements that do not reflect the MP3 as-built configuration.
Review Valid invalid Needed Date initiator: Balodis. V. E.
O O
O se2497 Printed 1o/2&9710 o3 40 AM Page 1 of 2 x
Northeast Utilities ICAVP DR N3, DR-MP3 0266 Millstone Unit 3 Discrepancy Report VT Lead: Rahe,e, Raj D Q
67497 VT Mgt: behopfer, Don K Q
Q Q
E75?7 IRC Ctwm: Singh, Anand K Q
1077/97 Date:
INVALID:
Date:
RESOLUTION:
1 Prev 6ovely ident6 fled by NU7 O Yes
(#1 No Non Discrepent Condetion Q Yes (98 No Rev6ew initiator: Denodes, V. E.
VT Lead: Reheja, Raj D
]
VT Mgra Schopfer, Don K IRC Ctwm: Singh, Anand K g
g Date:
i SL Comments:
4 a
J Printed 10?&'9710 03 47 AM Page 2 of 2
O O
Northeast Utilities ICAVP DR No. DR MP3 0240 Millston Unit 3 Discrepancy Report Rev6ew Ornup: system DR VAUD Rev6ew Element: systein Desagn p
Diec6pline: Mechancal Desgn O va Diecrepancy Type: Calcu6ston No systerrVProcese: Rs3 NRC signincance level: 4 Date faked to NU:
Date Published: 10/3097 D6ecr*Pancy: Missing Minimum Wall Calcult' nas Deecript6an: RFl MP3 522 requested all RSS Minimi m Wall calculations.
Response M3 IRF 00505 lodicates that all the RSS calculations are being provided. Minimum wall calculations for sizes 4" and under are not available. Nor are calculations available for the l
following lines:
8*. Line No,46,54 and 55 10' s.ine No. 3,8,9,11,13,14,19,32 through 39 and 62 12'- Line No. 4,6,7,12,16 and 17 The missing calculations cover the minimum recirculation lines, the cross-tie lines, the suction lines from the RWST, the lines from the pump to containment and the suction lines from the sump.
Review Val 6d invalid Needed Date initiator: Langel,D.
O O
O 1* ins 7 VT Lead: Nort, Anthony A O
O O
1511/87 VT Mgt: Schopfer, Don K O
O O
10/12S7 IRC Chmn: singh, Anand K Q
Q Q
1W27/97 Date:
INVALID:
Date:
RESOLUTION:
Prev 6ously identined by NU7 O Yes ' # ' No Non D6screpent Condition O Yes
- 1 No noview initiator: Langel, D.
O O
O VT Lead: Non, Anthony A VT Mgt: Schopter, Don K IRC Chmn: singh, Anand K Date:
SL Comments:
Pnnted 10'2&9710 o4 37 AM Page 1 of 1
s s
Northeast Utilities ICAVP DR No. DR MP3-0291 Milletone unit 3 Discrepancy Report Review Gooup: system DR VALID Review Element: System Desagn p
g Diocl line: Mechamcal Deegn P
g) g D6ecrepancy Type: Componert Data O No system / Process: HVX NRc significance level: 3 Dale faxed to NU:
Date Putdlehed: 1GM97 Diecrepancy: SLCRS Filler Housing Design Pressure De*criftion: During the review of the design pararr,eters for the Supplementary Leak Collection and Release System (SLCRS) filter units (3HVR*FLT3A/38) a discrepancy regarding the design pressure of the filter housings was identified.
FSAR Table 1.61 indicates that the filter units are in compliance with Regu!alory Guide 1.52, ReV. 2, position C.3 9 which requires the filter housings to be designed in accordance with the provisions of ANSI N5091976 Section 5.6.
ANSI N5091976 Section 5.6 states that the housings shall be designed and constnced to meet the structural and pressure loadings of Section 4. Section 4.6 identifies the following three pressure loading conditions: 1) Units and components that must withstand pressure transients,2) Units and components that must withstand fan peak pressure, and 3) Units and components subjected only to rated air flow, in accordance with ANSI N509-1976 Section 4.6.2.2, the SLCRS filter units must withstand a negative intemal pressure equal to er more negative than the peak pressure of fan 3HVR*FN12A/B since there are isolation dampers (3HVR*AOD95A/B) upstream of the SLCRS filter units.
Specification 2170.430-065 states that the filter housings are designed for 15 inches of water gauge (iwg) negative pressure.
The SLCRS exhaust fans (3HVR*FN12A/128) have a rated pressure of 22.2 iwg per Specification 2176.430141. Closure of the fire damper (3HVR*DMPF29,3HVR*DMPF44) downstream of the fan or of the air operated damper (3HVR*AOD95A/958) at the inlet of the filter housing could result an intemal housing pressure of 22.2 iwg which is greater than the.15 iwg design pressure for the housing.
Rev6ew Valid invalid Needed Date Initiator: Stout. M. D.
O O
O
$o/1/97 VT Lead: Nort, Anthony A g
Q Q
10'397 l
VT Mgr; Schopfer. Don K Q
O O
iS'1*S7 l
IRC Chmn: Singh, Anand K Q
Q Q
1077/97 l
l Date:
INVALIO:
Date:
REsOLUTlON:
Previously ident61 ed by Nu7 O Yes
- ' No Non Descrepard Condition O Yes 9' No I
Printed 1D?BS'I to 05 33.\\M Page 1 of 2 ll
9 s
i Northeast Utilities ICAVP DR No. DR.MP3.ctsi Millstone unit a Discrepancy Report n.vw Acceptable Not Acceptatde Needed Date inn 6stor: (none)
VT Leed: Nor1 Anthony A O
O O
VT Mgr: Schopfer, Don K O
O O
IRC Chmn: 66ngh, Anand K O
O O
O O
o,,,,
SL Conwneeds:
'l J
Pnnted 10'2&9710 05 39 AM Pop 2 of 2
s 4
Northeast Utilities ICAVP DR No, DR MP3 03C1 Millstone UnN 3 Discrepancy Report Review Group: Syesem DR VALID Rev6ew Element: system Dewgn Discipl6ne: I & C Design 4
D6ecrepancy Type: Calculation Ow systemfrocess: SWP NRC sienenconce level: 4 Date faxed to NU:
Date Publeshed: 100097 D6*c'*pency: Calculation SP 3SWP 28 data discrepancy.
DesertPtion: Pressure switches 3SWP'PS111 A, B will alarm locally when the pressure of the service water pressure drops below calculated setpoint. This will signal a possibly damaging conditlor. to the emergency d ese! 9enerator.
A review of calculatiors SP 3SWP 28, Revision 1 and CCN nos.
1 & 2, revealed following discrepancies:
Per FSAR table 1.81. NRC Regulatory Guldes, the MP3 is committed to R.G.1.105, Rev.1, dated November 1976. Per Section C, paragraph 1 'The setpoints should be established with sufficient margin between the lechnical specification limits for the process variable and nominal trip setpoint to allow for (a) the inaccuracy of the instrument, (b) uncertainties in the calibration, and (c) the instrument drift that could occur during the interval between calibrations, Procedure NETM-43. Preparation of Category I instrument Setpoint Calculations with respect to the requirements of NRC R.G.1.105, requirements also spell out the methodology for setpoint calculations, instruments identified in the calculation were upgraded to safety related status by revision 1, in November 198'.
4 A review of applicable corrective action database for Millstone 3 has not identified any pendin0 change notices that wi!l update / revise this calculation '.;; the icquirements discussed
- above, Review Val 6d invol6d Needed Date initiator: Hindia. R.
Q Q
O 10997 VT Leed: Nort, /nthony A O
O O
10'17/S7 VT Mge: Schopfer. Don K O
O O
$0?SS7 1RC Chmn: Singh, Anand K O
O O
$0'2757 D.ie:
INVAll0:
Date:
RE.',OLUTiON:
'viously identihed by Nu7 Q Yes JGi No Non Discrepent Condition O Yes
- 9) No Review Acceptable Not Acceptable Needed Date VT Lead: Neft, Anthony A O
O O
vT ugr: schopia, Don K IRC Chmn: Smgh, Anand K Printed 1o'2&9710 06 27 AM Page 1 of 2
4 s
Nonheast Utliities ICAVP CM NA DR MP3 0 01 Millstone Unit 3 Discrepancy Report O
O O
o:
SL Convrents:
i i
l I
i l
l 1
Pmted 100as71o os 33 Au Page 2 of 2
Northeast Utilities ICAVP DR No. DR-MP3-0353 Millstone Unit 3 Discrepancy Report i
Rev6ew Oroup: Conreguraten DR VALlO Rev6,w Elemord: Systern Ongn Discipline: Electrical Desg
Potential Operabil#y leeue Discrepancy Type: Drmn0 O ves systerWProcese: RSS
!G) No NRC sieninconce level: 4 Date faxed to NO:
Date Published: ior3oS7 bcrepeacy: Drawing Disrepancies Ducripl6on: 1. Note 2 of drawing 12179 EE 34AE, ReV. 6, indicates that all trays aro 30 inches wide unless noted otherwise. Trays 3TC0014N,3TC0015N, and 3TX016N are shown on this drawing without a commodity type which would Indicate a different tray size. TSO2 indicates these trays are 18 inches wide. The installed trays are 30 inches.
- 2. The revision block for drawing 12179-EE 34TG, Rev 1, indicates that F E 29282 was incorporated. This CCD was written against another tray drawing for the Containment area but was incorporated on this new drawing created to capture the tray cover data. The data included in the CCD was not incorporated into the drawing as shown in the CCD and no other design changes were referenced nor any explanation of the differences provided.
- 3. Conduit Support Log (CSL)12179 FSK CS 1343, Rev,7, with no outstanding change documents, lists condults 3CX900PA, 3CX900WB2, and 3CX900PC2 as supported by this support.
These conduits are not included in TSO2 as supported by this support. TSO2 lists an additional conduit, 3CX900PC, not shown on the CSL, as supported from this support.
Review Val 6d invasid Needed Date Inittetor: Sarwr, T. L.
O O
O 10/'5S7 VT Lead: Nort, Anthony A g
Q O
1o/1597 VT Mgr: Schopfer, Don K O
O O
10/20S7 IRC Chmn: Singh, Anand K O
O O
tor 27s7 D.i.:
INVALID:
Date:
RESOLUTION:
Prev 6ounty idenUned by Nu7 O Yes ' O ' No Non Descrepent Condat on Q-Yes 8' No Acceptable Not Acceptable
IRC Chmn: Singh, Anand K O
O O
Date:
sL Corrments:
Pnnted 10/2&S7 to 09 03 AM Page 1 of 1
0 Northeast Utilities ICAVP DR No. DR MP3 4364 Ministone unk 3 Discrepancy Report Review Group: Configuraten DR VALID Review Element: Sretern installetion Diecipline: Electncel oeegn PotentW Operebuy haue Discrepancy Type: Dremng O Yes systerr#tocess: RSs
,, g, NRC signenconce level: 4 Dete faxed to NU:
Date Publ6shed: 10%S7 D6.crepency: Support Drawing Disorspancies tm
-: 1. Conduit Support Log (CSL) 12179-FSK CS 4798, Rev. 2, with i
no outstanding change documents, indicates that conduit 3CX9000B4 is supported from support CS-4798. TSO2 also indicates this conduit is supported by the support. The detail shown on the drawing is for a field installed junction box and does not include any attachment of conduit.
- 2. Conduit Support Log (CSL)12179 FSK CS 30$8, Rev. 5, with no outstanding change documents, lists conduit 3CX900PA4 as supported by this support. This conduit is not included in TSO2 as supported by this support. TSO2 lists an additional conduit, 3CX900PA, not shown oti the CSL as supported from this support.
Rev6ew Valed invol6d Needed Dele inntator: Server. T. L.
Q O
10/1597 VT Leed: Nerl. Anthony A Q
Q Q
10/1597 VT Mgr: Schopfer, Don K Q
Q Q
10G097 IRC Chmn: Singh, Anend K O
O O
07^S7 Date:
INVAllo:
Date:
REs0LUTION:
Prev 60uely identined by Nu? () Yes JG) No Non 06ecropont Condet60n
() Yes JOi No Rev6ew in4He% M Acceptab6e Not Acceptable Needed Date VT Leed: Nort, Anthony A VT Mgr: Schopfer. Don K IRC Chmn: 56ngh, Anend K Date:
SL Comnwnts:
Prtnted 10G&S7 to 09 42 AM page 1 of 1 s
AN
Northeest Utilities ICAVP DR No. DR-MP3 4364 Millstone Unk 3 Discrepancy Report Review oropp: Conrguraten MN Moview Element: system Degn D6ecipline: Electncel Deelen Potent 6elOperendesty leeue O yeo Diecrepancy Type: Drewing syss=WProcou: sWP le) No MtC %rdecence levol: 4 Date faxed to NO:
Date Putdished: 1W3097 D6*crepancy: Drawing Discrepancies Dacrip16*n: 1. Drawing EE 37W Rev.13. (L 7) shows embedded conduits running between SWP pump rooms. The drawing indicates that conduit number 2 is spare, however, it is tagged and utilized in the field as 3DC880P02. Conduit number 4 shown as 3WC881N04 on the drawing was found to be plugged in the filed, however the Cable and Raceway Program (TSO2) Indicates cables are routed through this condult. GRITS shows no outstanding CCDs for this drawing and TSO2 does not show work in progress for these conduits.
- 2. Conduit Support Log 12179-FSK CW 172 Rev. 3A, fails to show the attachment of the strut used to clamp conduits to the support.
- 3. Conduit Suppor1 Log 12179-FSK CW-151, Rev.1, correctly indicates spare corKluit 3CX686NF is connected to support CW-151. However, the Cable and Raceway Program (TSO2) no longer lists conduit in the raceway tabulation for the support.
- 4. Conduit Support Log 12179-FSK CW 228, Rev.1, does not specify the type of strut Installed as the conduit attachment.
$. Conduit Support Log 12179-FSK CW 229, Rev.1, does not specify the type of strut installed as the conduit attachment.
- 6. Conduit Support Log 12179-FSK CW 247, Rev. 4, indicates that the supported conduit 3CX886ND2 is % inch diameter. This conduit at the point of attachment is 1 inch which changes to a %
inch after an installed LB fitting. The Cable and Raceway Program (TSO2) indicates this conduit is 1 inch
- 7. Conduit Support Log 12179-FSK CW 252, Rev. 4, does not specify the type of strut installed as the conduit attachment nor the bolts used for plate attachment.
- 8. Conduit Support Logs 12179-FSK CW 716 Rev. 3 and 718 Fav.1, do not specify the length of the strut installed (llem AU) to which the conduit straps, and thereby the conduit, are attached.
- 9. The Cable and Raceway Program indicates cable 3SWPAOC072 is 735 feet in length. The actual field installed length is estimated to be 135 feet. This significant difference would affect voltage drop calculation performed using the TSO2 dala.
Review Pnnted 10C&971010 54 AM Page 1 or 2
Northeast Utilities ICAVP DR No DR4AP3 4354 Millstone Unit 3 Discrepancy Report vesid invoud Neoned osie inittelor: Server, T. L.
O O
O 1W1597 VT Lead: Nort, Anthony A O
O O
1515S7 VT Mgri Schopfer, Don K O
O O
1020S7 l
IRC Chmn: S$ Anand K O
O O
1027/97 Oste:
INVALID:
Dele:
RESOLUll0N:
Previously klontiflod try NU7 Q Yes
't > No Non D6screpent Condet6on Q Yes
'9) No Review inellatori (none)
VT Lead: Nort, Anthony A VT Mgr' Schopfer, Don K IRC Chmn: Singh. Anend K
-o,
SL Conenents:
3 I
PrWed 1Q7&9710.11.01 AM Page 2 of 2 I
8 Northeast LKilities ICAVP DR No. DR MP3 0349 Milletone Unit 3 Discrepancy Report Rev6ew Group: Confqnrotion DR VALIO D6ec'pl6ne: Eleotncal Deegn Potent 6al Operald641y leeue D6ectopency Type: Instenation implementetson O Yee system 9'roceset SWP 4g NRC significance level: 4 Date faxed 40 W:
Date Putd6thed: 10 % 97 Dioc'i ency! Installation not inaccordance witiidesign documents P
Descrtpe6en: The following discrepant condition was identified during walkdowns:
e
- 1. Conduit MX000PB (1' diameter - steel) is supported by support ES 2100 as shown on Conduit Support Log 12179-FSK.
ES 2000 Rev. 2. This Is a direct attachment support type DC to concrete. Per Standard Support Detail Drawing BE 52CA, Rev.
4, the maximum allowable span to the next support is 5 feet.
Contrary to this requirement one of the as installed spans to the next support is 5' B'.
The following material condition items were noted;these are not configuration issues:
1.Several of the lower members of the cable tray supports in Manholes 3EMH 13A and 13B show significant signs of rust due to standing water which has also immersed the lower cable tray as demonstrated by the dis coloration of the cable with in the tray.
- 2. Electrical Installation Specification E 350 Raiv, g. Section 3.1.5.6 indicates that ducts (conduit embedded in ductbanksi shall remain plugged until cable is pulled and spare ducts atis sleeves shall be left plugged, Contrary to the above three conduit sleeves in each manhole 3EMH 13A and 13B, elevations 20' and 21' as shown Drawing EE 32L Rev. 7 (H 10) are not plugged / sealed.
Rev6ew Valed invalid Needed Date initiator: Sarver, T. L.
O O
O 0/17/S7 VT Lead: Nort. Anthony A O
O O
10/175/
VT Mct: Schopfer. Don K Q
Q Q
107097 IRC Crm Singh. Anand K Q
Q Q
1077/97 Deio:
INVALID:
Date:
RESOLUTION:
Prev 6ously identified by Nu7 O Yee
-ei No Non D66cropent Corwitt6on U Yes
~ 97 No Rev6ew Accepteble Not Acceptable Needed Date g
VT Lead: Nort, Anthony A VT Mgt: Schopfer, Don K Pnnted 1G75971011.36 AM Page 1 of 2
)
1 Northeast Utilities ICAVP DR N2, DR4P3 0359 Milistone Unit 3 Discrepancy Report 0
O RC Cterm: $4ngh, Arend K
=
g g
om.:
i 3L Comments:
j l
a 4
4 4
4 9
i I
Y l
Pnnted 1078/971011.44 AM P
2W 2
o Northeast Utilities ICAVP DR No. DR MP3-0603 Millstone unit 3 Discrepancy Report Rev6ew Group: Confguraton DR VALID Rev6ew Element: system instaaeton p g y p gggyg.
D6ecipione: Electncal Dooga O Yee Discrepency Type: Installeton implementaton 4 No systemProcess: sWP
~
NRC significance level: 4 Date faxed to NU:
Date Published: 10/3097
~
Diecrepancy: Supports not in agreement with design drawings.
D**c<iption: The following deviations from design drawings were noted:
- 1. Drawing DWG EE 34KA Rev. 3 for tray support Type C207 calls for Detail H which requires Dusset plate at ceiling anchorage. Support C207172 does not have this detail as an auxiliary beam is installed in its position.
- 2. Drawing EE 34KH Rev. 2 for support type C260 does not show horizontal W37 5/8'L member that is installed between the top and bottom intema! 'X' bracing on support C260-263. Open Change Control Documents for this drawing did not authorized this deviation.
- 3. Three PS 204 memt,ers, which run to support C3t4 02, are installed on the upper 4 ft. section of the south verticalle0 of support C309A 017 (reference drawing EE 34 KP Rev. 4). No design documents can be identified to authorize these members.
Review Valid inval6d Needed Date init6ator: Server. T. L.
Q Q
Q 10/1597 VT Lead: Nort. Anthony A Q
[
]
10/16/97 VT Mgt: Schopfer. Don K O
O O
'or:oS7 IRC Chmn: singh, Anand K O
O O
1o/27/97 Dele:
IN) ALID:
Date:
RESOLUTION:
Prev 6ou6fy identafled by NU7 O Yes f No Non Discrepent Condn6on O Yee ' Gif No Review Acceptable Not Acceptable Needed Date VT Lead: Nerl Anthony A VT Mgt; schopter. Don K IRC Chmn: Singh, Anend K Date:
SL Cortments:
Pnnted 10/2&971014 o4 AM Page 1 of 1
6 Northeast Utilities ICAVP DR No. DR-MP3 0258 Millstorm unit 3 Discrepancy Report Review Group: System DRINVAllD Di.cipiin.: oin.'
Potent 6el Operability issue Om Discrepancy Type: Procedure linplementaten
- 4) No System < Process: QSS NRC signincance level: 4 Date faxed to NU:
Date Put$shed: iQrXV97 Diecrepancy: Failure to follow procedure D*ecript6on: PDCR# MP3 94162 ; Design Engineering Screening Evaluation (DESE), Sheet C1 of 12 The DESE states,in Section B, ALARA Design Review, 'If the answer to any of Questions is 'YES' then a detalled ALARA review checklist must be completed per NEO 5. 27
- The third question is answered yes, with a footnote. The footnote states that a detailed ALARA review is not required, and is intialed RVK,12/13/94. The discrepancy is that the procedure was not followed, and that no justification was provided for bypassing the procedure, in this modification, it is clear to an experienced reviewer that an ALARA DESIGN review was truly not needed, and that the change w,'il actually reduce the dose in later outages. Therefore, the concem is not one of the effect of the design, it is, rather, what appears to be an unsupported capability to bypass a procedure.
Revkm Valid invalid Needed Date initiator: Rich., 3 O
O O
sot 2oter VT Lead: Nort, Anthony A O
O O
tor 27/97 VT Mor: Schopfer, Don K O
O O
. tor 2 ore 7 IRC Chmn: Singh. Anand K O
O O
Date:
10/15/97 INVALID: The ALARA design review form in the Design Control Manual (NUC DCM) permits the ALARA coordinator to make a judgement regarding the need for the detailed ALARA design review. This is apparently the process that was followed in the mod when it was concluded that the detailed review was not required. Therefore, the discrepancy is not valid (because the signature on the footnote indicates that the requirements imposed by the form in NUC DCM were followed.)
Date:
RESOLUTION:
Previously identified by Nur O Yes ie) No Non Descrepent Condition O Yes t9) No Review Initiator: Rch, J. M VT Lead: Nert. Anthony A VT Mgr: Schopfer Don K IRC Chmn: Singh, Anand K Date:
Pnnted to/2tL97 to 07:21 AM Page 1 of 2
h i Northeast Utilities ICAVP DR No. Dft-MP3-0268 Millstone unit 3 Discrepancy Report SL Comments:
Pmted 10,'28,9710 07.26 AM Page 2 of 2
,7 Northeast Utilities ICAVP DR No. DR MP34444 Millstone Unit 3 Discrepancy Report Rev6ew Group: system DR INVAllD Potential Operetnlety lasue Discipline: Mechew Doogn Ow Discrepancy Type: Calculation (9) No System /Procesa: Rss NRC SigrWncance level: 4 Date faxed to NU:
Date Published: 1G%97 D6screpancy: Minimum Wall Calculation Material Specification Deecrtpuon: Minimum wall calculations use the yield strengh of the particular material. Calculations MW(B)-044, Rev. O and MW(B)-045, ReV.
O do not identify a material. There is a reference to IE Bulletin 79 03A which would indicate the material is SA312 ano based on l
the number used in the calculations, the material type would be 304L. The piping design table for the lines on these calculatinns l
Is Cl.153. Class 153 specifies SA312 Type 304L. Therefore, l
there is no affect on the conclusions of the calculations.
Review Val 6d invaled Nooded Date inNietor: Langel,D.
]
Q Q
10fitL97 VT Lead: Nort, Anthony A Q
Q Q
10/27/97 VT Mgt: Schopfer. Don K O
O O
IRC Chmn: singh. Anand K Q
Q Q
Da'*:
10/16/97 INVAllD: Since the yleid strength used in the calculation is conect for the specified pipe class, the condition identified in this DR is an editorial error. Identification of editorial errors is outside the scope of the ICAVP.
Date:
RESOLUTION:
Previously idenuned by NU? O Yes foi No Non D6ecrepent CondMion O Yes
'Ol No Review initiator: (none)
O O
VT Lead: Nort. Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Sngh. Anand K Date:
sL Cortunents:
Printed 10?&971012 34 AM Page 1 of 1 J
I t
,(
Northeest Utilities
't ICAVP DR No. DR MP3-0492 Millstone Unit 3 Discrepancy Report Review Group: Sytem DR INVAUD Review Element: System Oceagn p
Discipline: Mechancel Doogn O Ya Diseropency Type: Calculshon gg SystertWProcese: QSS
~
NRC Signiflcance level: 4 Date faxed to NU:
Dele Published: 1o/3097 Discrepency: Significant Figures in Minimum Wall Calculations Descript6an: Standard practice for well thickness is to use 3 significant figures. The Calculation MW(F) 125, Rev.1 includes a different number of significant figures. The comment does not affect the conclusion of the calculation.
Review Valid
. invalid Neerted Date initiator: Langel, D.
O G
D ior27/97 VT Lead: Nort, Arwhony A O
g Q
1077/97 VT Mgt: Schopfer, Don K O
O O
i IRC Chmn: Singh, Anand K O
O O
Date:
10/27/97 INVAllD: There is no requirement for the number of figures required in calculating the minimum wall thickness for piping. The scr.edule wall piping selec;ed for this application has a greater wall thickness than the calculated wall thickness, Therefore, there is no discrepancy.
Date:
RESOLUTION:
Prov6ously identified by Nu7 O Yee @ No Non Discrepent Condelion U Yee @ No Review initiator: (none)
VT Leed: Nort, Anthony A VT Mgt: Sc%pfer, Don K 1RC Chmn: Singh, Anand K Date:
3L Conmente:
Pnnted 1GOS9710.1310 AM Page 1 of 1
-