Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212P469 + (09:31:17, 4 December 2024)
- ML20212P467 + (09:31:19, 4 December 2024)
- ML20212P466 + (09:31:21, 4 December 2024)
- ML20212P465 + (09:31:23, 4 December 2024)
- ML20212P464 + (09:31:24, 4 December 2024)
- ML20212P463 + (09:31:28, 4 December 2024)
- ML20212P460 + (09:31:30, 4 December 2024)
- AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months + (09:31:32, 4 December 2024)
- ML20212P455 + (09:31:35, 4 December 2024)
- ML20212P454 + (09:31:36, 4 December 2024)
- U-600684, Forwards Response to NRC Questions on FSAR Chapter 8, Electric Power Re Effect of Block Start Voltage on Equipment & motor-operated Valves.Calculations Indicate Sys Adequate Under Listed Conditions + (09:31:38, 4 December 2024)
- ML20212P449 + (09:31:40, 4 December 2024)
- BSEP-86-1199, Responds to Violations Noted in Insp Repts 50-324/86-16 & 50-325/86-15.Corrective Actions:Outstanding Work Requests/ Job Orders from Refueling Outage Reviewed to Ensure Proper Limiting Conditions for Operation + (09:31:43, 4 December 2024)
- 05000369/LER-1987-003-03, :on 870130,containment Air Return Fans Declared Inoperable.Caused by Inadequate Administrative Controls Resulting in Removal of Water Curbs W/O Reinstallation.Curbs Replaced.Procedures Will Be Revised + (09:31:48, 4 December 2024)
- ML20212P444 + (09:31:50, 4 December 2024)
- ML20212P443 + (09:31:52, 4 December 2024)
- ML20212P442 + (09:31:56, 4 December 2024)
- ML20212P440 + (09:31:57, 4 December 2024)
- 05000528/LER-1986-062, :on 870211,discovered That Max Surveillance Interval for Monthly Functional Test of Plant Protection Sys (36ST-9SB02) Exceeded on 860222.Caused by Communication Error.Surveillance Program Enhanced + (09:32:02, 4 December 2024)
- ML20212P435 + (09:32:07, 4 December 2024)
- ML20212P433 + (09:32:09, 4 December 2024)
- ML20212P431 + (09:32:10, 4 December 2024)
- ML20212P430 + (09:32:14, 4 December 2024)
- 05000339/LER-1986-010-03, :on 860804,05 & 11,unidentified RCS Leakage Exceeded Tech Spec 3.4.6.2 Requirement of 1 Gpm.Caused by Leakage at Primary Sys Valves,Reactor Coolant Pump Seals & Sources Listed in Table 1.Equipment Repaired + (09:32:19, 4 December 2024)
- ML20212P425 + (09:32:21, 4 December 2024)
- ML20212P424 + (09:32:23, 4 December 2024)
- ML20212P423 + (09:32:25, 4 December 2024)
- BSEP-87-0019, Monthly Operating Repts for Dec 1986 + (09:32:32, 4 December 2024)
- ML20212P414 + (09:32:38, 4 December 2024)
- ML20212P413 + (09:32:40, 4 December 2024)
- U-600850, Informs of Need to Modify Two Rooms Inside Containment Containing Mixing Compressors for Combustible Gas Control Sys.Rooms Do Not Meet Intended Function of Protecting Contained Equipment from post-accident Environ Conditions + (09:32:41, 4 December 2024)
- 05000335/LER-1987-002-02, :on 870207,reactor Tripped on Low Steam Generator Level During Controlled Shutdown for Scheduled Refueling Outage.Caused by Equipment Failure.Steam Generator Level Indicators Repaired + (09:32:49, 4 December 2024)
- ML20212P404 + (09:32:52, 4 December 2024)
- ML20212P400 + (09:32:57, 4 December 2024)
- ML20212P399 + (09:32:59, 4 December 2024)
- ML20212P397 + (09:33:03, 4 December 2024)
- ML20212P394 + (09:33:06, 4 December 2024)
- ML20212P393 + (09:33:07, 4 December 2024)
- ML20212P392 + (09:33:09, 4 December 2024)
- ML20212P390 + (09:33:11, 4 December 2024)
- ML20212P387 + (09:33:12, 4 December 2024)
- W3P87-0578, Forwards Response to Violation 8633-02 Noted in Insp Rept 50-382/86-33.Corrective Actions:Health Physics Shift Control Technicians Verbally Instructed in Proper Method for Documenting Protective Requirement Mods + (09:33:14, 4 December 2024)
- IR 05000313/1986041 + (09:33:16, 4 December 2024)
- ML20212P382 + (09:33:18, 4 December 2024)
- W3P86-1949, Responds to Violations & Deviation Noted in Insp Rept 50-382/86-13.Corrective Actions:Rev 2 to Drawing SM-896 Closed Out on 860627,questionable Wires Replaced in Valves SI-225B & SI-227B & Rev 3 to Procedure OP-903-001 Approved + (09:33:21, 4 December 2024)
- ML20212P378 + (09:33:23, 4 December 2024)
- 05000529/LER-1986-023-01, :on 861224,reactor Trip Initiated.Caused by Intermittent Ground on 125-volt Dc Bus.Ground Removed & Power Supply Replaced.Further Evaluations to Determine Root Cause of Degraded Voltage Condition Underway + (09:33:30, 4 December 2024)
- ML20212P376 + (09:33:33, 4 December 2024)
- ML20212P375 + (09:33:35, 4 December 2024)
- ML20212P373 + (09:33:37, 4 December 2024)
- IR 05000528/1986015 + (09:33:56, 4 December 2024)