Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212R356 + (08:48:03, 4 December 2024)
- ML20212R352 + (08:48:03, 4 December 2024)
- ML20212R347 + (08:48:04, 4 December 2024)
- ML20212R344 + (08:48:05, 4 December 2024)
- ML20212R341 + (08:48:06, 4 December 2024)
- ML20212R342 + (08:48:06, 4 December 2024)
- ML20212R337 + (08:48:08, 4 December 2024)
- ML20212R340 + (08:48:08, 4 December 2024)
- ML20212R334 + (08:48:09, 4 December 2024)
- ML20212R333 + (08:48:10, 4 December 2024)
- ML20212R330 + (08:48:10, 4 December 2024)
- ML20212R329 + (08:48:11, 4 December 2024)
- 05000387/LER-1986-041, :on 861226,Limiting Condition for Operation 3.0.3 Entered Six Times to Sample Suppression Chamber.Caused by Excessive Leakage from Blower Vents in Containment Radiation Monitoring Sys.Procedures Revised + (08:48:15, 4 December 2024)
- ML20212R319 + (08:48:15, 4 December 2024)
- PLA-2791, Expresses Appreciation for Opportunity to Discuss SALP Rept on 870116.Meeting Viewgraphs & Mgt Development Program Encl + (08:48:16, 4 December 2024)
- ML20212R313 + (08:48:17, 4 December 2024)
- ML20212R309 + (08:48:18, 4 December 2024)
- ML20212R307 + (08:48:19, 4 December 2024)
- ML20212R305 + (08:48:19, 4 December 2024)
- ML20212R303 + (08:48:20, 4 December 2024)
- ML20212R300 + (08:48:21, 4 December 2024)
- 05000443/LER-1987-010, :on 870302,hi-hi Water Level Spike in Steam Generator a Initiated Main Feedwater Isolation.Caused by Opening Sequence of Msivs.Procedural Changes Made + (08:48:23, 4 December 2024)
- ML20212R298 + (08:48:24, 4 December 2024)
- ML20212R294 + (08:48:24, 4 December 2024)
- ML20212R292 + (08:48:25, 4 December 2024)
- ML20212R289 + (08:48:26, 4 December 2024)
- ML20212R285 + (08:48:27, 4 December 2024)
- IR 05000272/1986027 + (08:49:31, 4 December 2024)
- 05000370/LER-1987-005-03, :on 870318,both Channels of Control Rod Indication Sys Became Inoperable During Maint Activity. Cause Attributed to Electronics Failure of Unknown Nature. Addl Info Needed Before Conclusion Reached + (08:49:38, 4 December 2024)
- ML20212R281 + (08:49:38, 4 December 2024)
- ML20212R280 + (08:49:39, 4 December 2024)
- ML20212R276 + (08:49:40, 4 December 2024)
- ML20212R278 + (08:49:40, 4 December 2024)
- ML20212R274 + (08:49:41, 4 December 2024)
- ML20212R272 + (08:49:42, 4 December 2024)
- ML20212R271 + (08:49:42, 4 December 2024)
- 05000267/LER-1987-008, :on 870320,w/plant Shutdown,Unplanned Plant Protective Sys Loop Shutdown Occurred.Similar Event Occurred on 870323,0331 & 0405.Causes for 870320 & 23 Events Indeterminable.Operations Order Will Be Issued + (08:49:44, 4 December 2024)
- ML20212R268 + (08:49:49, 4 December 2024)
- ML20212R266 + (08:49:50, 4 December 2024)
- ML20212R263 + (08:49:51, 4 December 2024)
- ML20212R259 + (08:49:52, 4 December 2024)
- ML20212R258 + (08:49:53, 4 December 2024)
- ML20212R255 + (08:49:55, 4 December 2024)
- ML20212R251 + (08:49:56, 4 December 2024)
- ML20212R250 + (08:49:57, 4 December 2024)
- NRC-87-0033, Forwards Supplemental Response to NRC Ltr Re Insp Rept 50-341/85-03.Corrective Actions:Surveillance Procedures Revised to Remove Conflicting Info Involving Valve Inoperability.Title Pages of All Affected Procedures Encl + (08:49:59, 4 December 2024)
- ML20212R246 + (08:50:01, 4 December 2024)
- 05000456/LER-1986-011-02, :on 861224,containment Ventilation Isolation Signal Received from Train B of Solid State Protection Sys. Caused by Spurious Signal Due to Multiple Work Activities by Contractor Personnel.Ltr to Contractor Issued + (08:50:07, 4 December 2024)
- IR 05000344/1987012 + (08:50:09, 4 December 2024)
- ML20212R240 + (08:50:10, 4 December 2024)
- 05000280/LER-1987-001, :on 861223,pressurizer PORVs Declared Inoperable Due to Excessive Stroke Time.Caused by Insufficient Air Flow Due to Air Line Size.Air Lines Will Be Replaced W/Larger Tubing + (08:50:15, 4 December 2024)