Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6097, Interim Deficiency Rept CP-86-75 Re American Switch Co Solenoid Valves in Piston Air Actuators of Papco Dampers. Initially Reported on 860904.Evaluation Continuing. Next Rept Expected by 870219 + (06:54:19, 4 December 2024)
- ML20214J314 + (06:54:19, 4 December 2024)
- ML20214J312 + (06:54:20, 4 December 2024)
- IR 05000423/1986033 + (06:54:23, 4 December 2024)
- 05000255/LER-1986-037, :on 861022,QA Audit Determined That Compliance W/Tech Specs for high-range Noble Gas Monitor Not Possible Since Monitor Does Not Physically Contain Specified Functions.Tech Specs Will Be Clarified + (06:54:26, 4 December 2024)
- IR 05000333/1987013 + (06:54:28, 4 December 2024)
- ML20214J303 + (06:54:29, 4 December 2024)
- PY-CEI-NRR-0559, Forwards LERs 86-071-00,86-072-00 & 86-073-00 + (06:54:30, 4 December 2024)
- NRC-87-0069, Discusses Util Procedures for Resistance Temp Detectors Channel Calibr,Per Util 861002 & 10 Ltrs.Audit Conducted by Butler of Region III on 870112 Concluded That Current Practices Acceptable Until Completion of NRC Final Position + (06:54:30, 4 December 2024)
- ML20214J296 + (06:54:31, 4 December 2024)
- ML20214J291 + (06:54:32, 4 December 2024)
- TXX-6110, Interim Deficiency Rept CP-86-76 Re Configuration & Dimensions of Gould Battery Racks Deviating from Drawing Requirements.Initially Reported on 861021.Evaluation Continuing.Next Rept Anticipated by 870422 + (06:54:33, 4 December 2024)
- ML20214J287 + (06:54:34, 4 December 2024)
- 05000454/LER-1986-030-03, :on 861023,sampling Period for Inoperable Radiation Monitor Delayed for 12 H.Caused by Personnel Error,Memo Issued Reemphasizing Notification Procedures.W/ + (06:54:35, 4 December 2024)
- AECM-86-0368, Forwards Emergency Preparedness Transition Plan in Support of 860902 Application to Amend License NPF-29 & CPPR-119,for Energy Resources,Inc to Assume Responsibility for Operation & Const of Plant + (06:54:36, 4 December 2024)
- ML20214J285 + (06:54:36, 4 December 2024)
- ML20214J279 + (06:54:37, 4 December 2024)
- ML20214J280 + (06:54:37, 4 December 2024)
- A06508, Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested + (06:54:38, 4 December 2024)
- ML20214J273 + (06:54:39, 4 December 2024)
- ML20214J272 + (06:54:39, 4 December 2024)
- IR 05000213/1987011 + (06:54:40, 4 December 2024)
- ML20214J265 + (06:54:41, 4 December 2024)
- ML20214J261 + (06:54:42, 4 December 2024)
- ML20214J263 + (06:54:42, 4 December 2024)
- ML20214J258 + (06:54:43, 4 December 2024)
- ML20214J257 + (06:54:44, 4 December 2024)
- DCL-86-339, Forwards Rev 15 to Physical Security Plan,Per 10CFR73.55 & 50.54(p).Implementation of Changes Expected by 870131. Encls Withheld (Ref 10CFR73.21) + (06:54:45, 4 December 2024)
- ML20214J253 + (06:54:47, 4 December 2024)
- ML20214J251 + (06:54:48, 4 December 2024)
- 05000354/LER-1986-081, :on 861023,during Manual Hot Quick Start Initiation of Hpci,Response Time Exceeded Acceptance Criteria of 27 S.Caused by Hydraulic Sys Being Out of Balance & Excessive Ramp Time + (06:54:49, 4 December 2024)
- ML20214J248 + (06:54:50, 4 December 2024)
- ML20214J245 + (06:54:51, 4 December 2024)
- ML20214J243 + (06:54:52, 4 December 2024)
- ML20214J242 + (06:54:52, 4 December 2024)
- TXX-6456, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr for Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Next Rept Will Be Submitted by 870721 + (06:54:53, 4 December 2024)
- ML20214J239 + (06:54:53, 4 December 2024)
- ML20214J235 + (06:54:54, 4 December 2024)
- ML20214J233 + (06:54:55, 4 December 2024)
- ML20214J231 + (06:54:55, 4 December 2024)
- ML20214J228 + (06:54:56, 4 December 2024)
- ML20214J224 + (06:54:57, 4 December 2024)
- ML20214J223 + (06:54:57, 4 December 2024)
- ML20214J220 + (06:54:58, 4 December 2024)
- ML20214J212 + (06:54:59, 4 December 2024)
- ML20214J215 + (06:54:59, 4 December 2024)
- ML20214J206 + (06:55:01, 4 December 2024)
- TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424 + (06:55:01, 4 December 2024)
- ML20214J201 + (06:55:02, 4 December 2024)
- 05000269/LER-1986-012, Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120 + (06:55:03, 4 December 2024)
- ML20214J199 + (06:55:03, 4 December 2024)