- 05000483/LER-1987-007, :on 870504,control Room Ventilation Isolation Occurred When Test Probes of Digital Voltmeter Placed Across Incorrect Terminals in Solid State Protection Sys Cabinet. Caused by Personnel Error + (06:08:04, 4 December 2024)
- ML20214P748 + (06:08:05, 4 December 2024)
- TXX-6475, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Future 7000 Series Relays Will Be Purchased with E Prefix.Next Rept Expected by 871009 + (06:08:05, 4 December 2024)
- ML20214P746 + (06:08:06, 4 December 2024)
- TXX-6473, Forwards Revised Response to Violations Noted in Insp Repts 50-445/86-14 & 50-446/86-11.Corrective Actions:Procedures EEI-7,CP-CPM-14.1 & QI-QP-11.3-26 Revised & Applicable Const Personnel Trained in Revised Requirements + (06:08:07, 4 December 2024)
- 1CAN098609, Forwards Proprietary & Nonproprietary, Inadequate Core Cooling Monitoring Sys Final Design Description, Per NUREG-0737,Item II.F.2.Proprietary Rept Withheld (Ref 10CFR2.790) + (06:08:08, 4 December 2024)
- RBG-24819, Special Rept:On 861018,Div II Diesel Generator Experienced Invalid Failure During Surveillance Testing.Caused by Improper Determination of Normal Background Vibration Level During Previous Engine Run.Vibration Switch Readjusted + (06:08:09, 4 December 2024)
- ML20214P739 + (06:08:09, 4 December 2024)
- ML20214P738 + (06:08:11, 4 December 2024)
- ML20214P735 + (06:08:11, 4 December 2024)
- ML20214P734 + (06:08:12, 4 December 2024)
- ML20214P733 + (06:08:13, 4 December 2024)
- ML20214P729 + (06:08:13, 4 December 2024)
- ML20214P728 + (06:08:14, 4 December 2024)
- ML20214P723 + (06:08:17, 4 December 2024)
- TXX-5013, Interim Deficiency Rept CP-86-15 Re Field Flash & K1 Relays Required to Operate During Starting Process of Diesel Generators.Initially Reported on 860314.Evaluation Continuing.Next Rept Will Be Submitted by 860930 + (06:08:18, 4 December 2024)
- ML20214P718 + (06:08:19, 4 December 2024)
- 05000327/LER-1987-023, :on 870430,insp of Ice Condenser Vent Assemblies Not Performed,Per Tech Specs Due to Lack of Guidance in Surveillance Instruction.Instruction Revised to Clarify Insp Requirements + (06:08:21, 4 December 2024)
- ML20214P711 + (06:08:22, 4 December 2024)
- ML20214P710 + (06:08:23, 4 December 2024)
- L-86-476, Revises Response to Finding B.1 Noted in Insp Repts 50-250/86-33 & 50-251/86-33.Corrective Actions:Insp & Checkout of Loop Performed & Procedure ONOP-0208.14 Revised to Clarify Channel Spiking Requirements + (06:08:24, 4 December 2024)
- ML20214P705 + (06:08:24, 4 December 2024)
- 05000482/LER-1986-061, :on 861031,motor Circuit Breaker for Centrifugal Charging Pump a Racked Down,While Charging Pump B Out of Svc.Caused by Personnel Error.Oversight Discussed W/Involved Personnel + (06:08:26, 4 December 2024)
- ML20214P701 + (06:08:29, 4 December 2024)
- RBG-24820, Special Rept:Marker 34 Discovered to Have Settled Total of 1.03 Inches as of Oct 1986 Quarterly Survey,Exceeding Tech Spec Table 3.7.10-1 Limits.Marker Predicted Value Revised. Settlement Incorporated Into Proposed Tech Spec Change + (06:08:30, 4 December 2024)
- 05000320/LER-1986-006, :on 860715,contaminated Camera Tripod Discovered in Dumpster in Unrestricted Area.Caused by Failure of Unknown Personnel to Implement Controls When Transferring Matl.Tripod Decontaminated + (06:08:32, 4 December 2024)
- ML20214P695 + (06:08:33, 4 December 2024)
- ML20214P694 + (06:08:34, 4 December 2024)
- ML20214P692 + (06:08:35, 4 December 2024)
- ML20214P693 + (06:08:35, 4 December 2024)
- ML20214P691 + (06:08:36, 4 December 2024)
- ML20214P687 + (06:08:37, 4 December 2024)
- ML20214P686 + (06:08:37, 4 December 2024)
- 05000327/LER-1987-022, :on 870428,six Valves in Fire Protection Sys Not Cycle Tested,Per Tech Spec Surveillance Requirement. Caused by Inadequate Procedure.Surveillance Instruction Revised to Include Six Valves in Checklist + (06:08:39, 4 December 2024)
- ML20214P678 + (06:08:42, 4 December 2024)
- IR 05000455/1986025 + (06:08:43, 4 December 2024)
- IR 05000455/1986036 + (06:08:45, 4 December 2024)
- ML20214P674 + (06:08:45, 4 December 2024)
- ML20214P673 + (06:08:46, 4 December 2024)
- ML20214P672 + (06:08:47, 4 December 2024)
- ML20214P671 + (06:08:47, 4 December 2024)
- 05000219/LER-1987-019, :on 870330,limiting Safety Sys Setpoint for Total Recirculation Flow Exceeded Tech Specs.Caused by Personnel Error.Surveillance Procedure Revised to Specify Use of More Accurate Flowmeter + (06:08:49, 4 December 2024)
- ML20214P668 + (06:08:50, 4 December 2024)
- ML20214P664 + (06:08:51, 4 December 2024)
- ML20214P665 + (06:08:51, 4 December 2024)
- ML20214P661 + (06:08:53, 4 December 2024)
- ML20214P660 + (06:08:54, 4 December 2024)
- ML20214P659 + (06:08:54, 4 December 2024)
- ML20214P657 + (06:08:55, 4 December 2024)
- ML20214P656 + (06:08:56, 4 December 2024)
- ML20214P655 + (06:08:56, 4 December 2024)