Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214S758 + (05:35:12, 4 December 2024)
- ML20214S756 + (05:35:13, 4 December 2024)
- ML20214S754 + (05:35:14, 4 December 2024)
- ML20214S755 + (05:35:14, 4 December 2024)
- ML20214S753 + (05:35:15, 4 December 2024)
- ST-HL-AE-2216, Forwards,For Ref & Use,Contract DE-CR01-87RW00129 for Disposal of Spent Fuel &/Or High Level Radwaste + (05:35:22, 4 December 2024)
- ML20214S744 + (05:35:23, 4 December 2024)
- ML20214S742 + (05:35:24, 4 December 2024)
- 05000254/LER-1986-007, Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions + (05:35:25, 4 December 2024)
- ML20214S739 + (05:35:25, 4 December 2024)
- B12343, Forwards Rev 2 to Environ Qualification Electrical Equipment Master List.Changes Made Based on Equipment Replacement & Clarification of Equipment/Component Certification Data + (05:35:26, 4 December 2024)
- ML20214S732 + (05:35:27, 4 December 2024)
- ML20214S731 + (05:35:28, 4 December 2024)
- IR 05000354/1987011 + (05:35:30, 4 December 2024)
- IR 05000277/1987012 + (05:35:32, 4 December 2024)
- JAFP-87-0441, Forwards Cycle 8 Startup Test Rept,Per Reg Guide 10.1 & Tech Spec 6.9.A.1 + (05:35:32, 4 December 2024)
- PNO-I-87-047, on 870529,licensee Reported That Gauge Containing 100 Mci Am-241 Lost.Gauge Might Have Been Sent to Scrap Yard.Canberra,Inc Surveyed Scrap Yard & Landfill on 870530-31 + (05:35:33, 4 December 2024)
- ML20214S718 + (05:35:34, 4 December 2024)
- ML20214S719 + (05:35:34, 4 December 2024)
- ML20214S714 + (05:35:35, 4 December 2024)
- ST-HL-AE-2233, Responds to Request for Addl Clarification Re Sqrt Audit Item BOP-1,per 870603 Telcon.Pictorial on Attachment Page 3 of Previous Submittal (ST-HL-AE-2148) Re Seismic Model of Generic Panel Clarified + (05:35:35, 4 December 2024)
- ML20214S712 + (05:35:36, 4 December 2024)
- ML20214S706 + (05:35:37, 4 December 2024)
- ML20214S710 + (05:35:37, 4 December 2024)
- ML20214S703 + (05:35:38, 4 December 2024)
- IR 05000259/1987017 + (05:35:39, 4 December 2024)
- ST-HL-AE-2208, Forwards Revised FSAR Tables 11.5-1, Process & Effluent Radiation Sys & 12.3.4-2, Bldg Ventilation Monitors. Revs Reflect Miscellaneous Setpoint Changes & Revised Gross Failed Fuel Monitor Range + (05:35:46, 4 December 2024)
- ML20214S698 + (05:35:46, 4 December 2024)
- ML20214S695 + (05:35:47, 4 December 2024)
- ML20214S693 + (05:35:48, 4 December 2024)
- 05000374/LER-1987-011-05, :on 870430,RHR Pump Min Flow Bypass Differential Pressure Switch Found Out of Tolerance Due to Setpoint Drift.Flow Switch Replaced.Old Switch Forwarded to Mfg for Disassembly & Insp + (05:35:55, 4 December 2024)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 + (05:35:56, 4 December 2024)
- ML20214S685 + (05:35:57, 4 December 2024)
- ML20214S676 + (05:35:58, 4 December 2024)
- ML20214S681 + (05:35:58, 4 December 2024)
- ML20214S673 + (05:35:59, 4 December 2024)
- ML20214S672 + (05:36:00, 4 December 2024)
- IR 05000382/1987009 + (05:36:01, 4 December 2024)
- ST-HL-AE-2220, Provides Addl Info Re 870515 Request for Schedular Exemption for 10CFR50,Appendix A,Gdc 57 to Obtain Authorization to Defer Completion of Mods to Component Cooling Water Sys Return Lines Until First Scheduled Refueling Outage + (05:36:01, 4 December 2024)
- ML20214S662 + (05:36:02, 4 December 2024)
- ML20214S655 + (05:36:03, 4 December 2024)
- ML20214S652 + (05:36:04, 4 December 2024)
- 05000219/LER-1987-023, :on 870430,while Performing Surveillance Testing of Reactor Protection Motor Generator Sets,Partial Primary Containment Isolation Occurred.Caused by Procedural Inadequacy.Procedures Reviewed & Revised + (05:36:05, 4 December 2024)
- ML20214S647 + (05:36:06, 4 December 2024)
- ML20214S645 + (05:36:07, 4 December 2024)
- ML20214S642 + (05:36:08, 4 December 2024)
- B12542, Proposed Tech Specs,Incorporating long-term Acceptance Criteria for Steam Generator Tubes W/Defects in Rolled Region + (05:36:09, 4 December 2024)
- ML20214S634 + (05:36:10, 4 December 2024)
- ML20214S633 + (05:36:11, 4 December 2024)
- 05000382/LER-1987-012, On 870413,reactor Trip Occurred Due to Control Element Assembly Calculator (Ceac) 2 Mistakenly Removed for Test W/Ceac 1 Out of Svc.Caused by Inadequate Procedures. Procedures Reviewed & Revised + (05:36:12, 4 December 2024)
- ML20214S631 + (05:36:13, 4 December 2024)
- ML20214S628 + (05:36:14, 4 December 2024)