Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214U580 + (05:17:06, 4 December 2024)
- ML20214U579 + (05:17:07, 4 December 2024)
- ML20214U578 + (05:17:07, 4 December 2024)
- 05000280/LER-1986-032, :on 861104,svc Water Flow Lost to Charging Pump Svc Water Subsystem & to Control/Relay Room Chiller Condenser Svc Water Subsystem.Caused by Introduction of Air Into Sys.Normal Line Returned to Svc + (05:17:09, 4 December 2024)
- ML20214U573 + (05:17:10, 4 December 2024)
- ML20214U572 + (05:17:10, 4 December 2024)
- ML20214U567 + (05:17:11, 4 December 2024)
- ML20214U566 + (05:17:12, 4 December 2024)
- ML20214U563 + (05:17:13, 4 December 2024)
- ML20214U559 + (05:17:14, 4 December 2024)
- ML20214U555 + (05:17:14, 4 December 2024)
- ML20214U551 + (05:17:15, 4 December 2024)
- FVY-86-108, Responds to Violations & Deviations Noted in Insp Rept 50-271/86-17.Corrective Actions:Sections of Engineering Manual Will Be Revised to Reflect IE Bulletin 80-11 Concerns & Masonry Wall Design Change Procedures to Be Developed + (05:17:16, 4 December 2024)
- ML20214U550 + (05:17:16, 4 December 2024)
- ML20214U542 + (05:17:17, 4 December 2024)
- ML20214U540 + (05:17:18, 4 December 2024)
- ML20214U536 + (05:17:19, 4 December 2024)
- ML20214U534 + (05:17:20, 4 December 2024)
- ML20214U527 + (05:17:24, 4 December 2024)
- ML20214U523 + (05:17:25, 4 December 2024)
- ML20214U520 + (05:17:26, 4 December 2024)
- ML20214U519 + (05:17:26, 4 December 2024)
- ML20214U515 + (05:17:27, 4 December 2024)
- ML20214U510 + (05:17:28, 4 December 2024)
- ML20214U512 + (05:17:28, 4 December 2024)
- L-86-376, Forwards Page 1 of Semiannual Radiological Effluent Release Rept for Jan-June 1986, Inadvertently Omitted from 860827 Submittal + (05:17:29, 4 December 2024)
- ML20214U503 + (05:17:30, 4 December 2024)
- ML20214U502 + (05:17:31, 4 December 2024)
- ML20214U492 + (05:17:33, 4 December 2024)
- ML20214U490 + (05:17:34, 4 December 2024)
- ML20214U487 + (05:17:35, 4 December 2024)
- ML20214U479 + (05:17:36, 4 December 2024)
- ML20214U476 + (05:17:37, 4 December 2024)
- ML20214U474 + (05:17:38, 4 December 2024)
- ML20214U473 + (05:17:38, 4 December 2024)
- ML20214U467 + (05:17:39, 4 December 2024)
- ML20214U461 + (05:17:40, 4 December 2024)
- ML20214U459 + (05:17:41, 4 December 2024)
- AECM-86-0367, Forwards Rev 1 to Updated FSAR for Grand Gulf Nuclear Station,Unit 1 + (05:17:42, 4 December 2024)
- ML20214U454 + (05:17:42, 4 December 2024)
- ML20214U451 + (05:17:43, 4 December 2024)
- B12468, Application for Amend to License DPR-21,changing Bases Section 3.5E, Isolation Condensor Sys of Tech Specs by Deleting Ref to Current off-normal &/Or Emergency Operating Procedures.Fee Paid + (05:17:44, 4 December 2024)
- ML20214U436 + (05:17:45, 4 December 2024)
- 05000318/LER-1987-004-01, :on 870507,leak Discovered in 0.5 Inch Diameter Inlet Piping to Relief Valve.Analysis Conducted to Determine Cause.Cracked Pipe Spool Replaced & Shutdown Cooling Loop 21 Returned to Svc + (05:17:47, 4 December 2024)
- ML20214U430 + (05:17:48, 4 December 2024)
- ML20214U431 + (05:17:48, 4 December 2024)
- ML20214U429 + (05:17:49, 4 December 2024)
- ML20214U428 + (05:17:51, 4 December 2024)
- 05000461/LER-1987-026, :on 870511,high Pressure Core Spray Automatically Actuated.Caused by Personnel Error.Procedure Revised to Require Instruments to Be Repressurized to Existing Sys Pressure Prior to Valving + (05:17:52, 4 December 2024)
- ML20214U422 + (05:17:53, 4 December 2024)
- ML20214U420 + (05:17:54, 4 December 2024)