Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215H780 + (03:11:54, 4 December 2024)
- ML20215H779 + (03:11:54, 4 December 2024)
- ML20215H775 + (03:11:55, 4 December 2024)
- PNO-III-87-060A, on 870427,reactor Entered 72 H Tech Spec Action Statement.Caused by Inoperable Shutdown Condenser Inlet Valve 1B.Licensee Plans to Reduce Power from 98% on 870429 & Complete Permanent Shutdown on 870430 + (03:11:55, 4 December 2024)
- ML20215H774 + (03:11:56, 4 December 2024)
- ML20215H772 + (03:12:00, 4 December 2024)
- ML20215H769 + (03:12:01, 4 December 2024)
- ML20215H771 + (03:12:01, 4 December 2024)
- 05000339/LER-1987-004-02, :on 870522,steam Generator Gross Activity Surveillance of Tech Spec 3.7.1.4,scheduled for 870520, Discovered Not Performed.Caused by Personnel Error & Inadequate Procedures.Policy Revised + (03:12:04, 4 December 2024)
- ML20215H765 + (03:12:05, 4 December 2024)
- ML20215H763 + (03:12:05, 4 December 2024)
- ML20215H762 + (03:12:06, 4 December 2024)
- ML20215H761 + (03:12:07, 4 December 2024)
- ML20215H760 + (03:12:07, 4 December 2024)
- ML20215H756 + (03:12:08, 4 December 2024)
- ML20215H759 + (03:12:08, 4 December 2024)
- ML20215H754 + (03:12:09, 4 December 2024)
- ML20215H752 + (03:12:09, 4 December 2024)
- ML20215H751 + (03:12:10, 4 December 2024)
- ML20215H750 + (03:12:11, 4 December 2024)
- ML20215H748 + (03:12:11, 4 December 2024)
- ML20215H747 + (03:12:12, 4 December 2024)
- ML20215H746 + (03:12:13, 4 December 2024)
- ML20215H744 + (03:12:13, 4 December 2024)
- ML20215H741 + (03:12:15, 4 December 2024)
- ML20215H739 + (03:12:16, 4 December 2024)
- ML20215H736 + (03:12:17, 4 December 2024)
- ML20215H737 + (03:12:17, 4 December 2024)
- ML20215H735 + (03:12:18, 4 December 2024)
- ML20215H730 + (03:12:23, 4 December 2024)
- 05000312/LER-1986-029-01, Forwards LER 86-029-01.Completion Date for Suppl to LER Delayed Until Aug 1987 Due to Expansion of Root Cause Investigation to Include All Previous Similar Events + (03:12:26, 4 December 2024)
- ML20215H728 + (03:12:26, 4 December 2024)
- ML20215H725 + (03:12:27, 4 December 2024)
- ML20215H727 + (03:12:27, 4 December 2024)
- ML20215H724 + (03:12:28, 4 December 2024)
- ML20215H723 + (03:12:29, 4 December 2024)
- 05000440/LER-1987-022, :on 870329 & 0407,unexpected Autostarts of Diesel Generator Bldg Ventilation Sys Divs 1 & 2 Occurred. Caused by Incorrect Wiring Configuration & Unadjusted Relay Reset Setpoint.Conditions Corrected + (03:12:31, 4 December 2024)
- ML20215H720 + (03:12:31, 4 December 2024)
- ML20215H716 + (03:12:32, 4 December 2024)
- ST-HL-AE-2136, Forwards Revised Pages to Util FSAR Which Reflect Change in Commitment to Reg Guide 8.27 Re Radiation Protection Aspects of General Employee Training Courses + (03:12:33, 4 December 2024)
- TXX-6423, Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates Which Could Compromise Integrity of Adjacent Shear Cones.Initially Reported on 870213.Next Rept Will Be Submitted by 870401 + (03:12:34, 4 December 2024)
- ML20215H714 + (03:12:34, 4 December 2024)
- 05000440/LER-1987-024, :on 870330,reactor Protection Sys Actuation Occurred Due to Upscale Trip of Neutron Monitoring Sys Intermediate Range Monitor.Caused by Electrical Noise While Maint Outage Work in Progress.Temporary Jumpers Installed + (03:12:36, 4 December 2024)
- ML20215H708 + (03:12:37, 4 December 2024)
- ML20215H707 + (03:12:37, 4 December 2024)
- ML20215H705 + (03:12:38, 4 December 2024)
- 05000440/LER-1987-023, :on 870330,manual Reactor Protection Sys Actuation Initiated Due to Decrease in Reactor Vessel Water Level.Caused by Improper Valve Alignment Between Feedwater & Reactor Water Cleanup Sys.Personnel Retrained + (03:12:43, 4 December 2024)
- ML20215H703 + (03:12:44, 4 December 2024)
- W3P86-3372, Requests Extension of Time for Implementation of Deluge Capability for Charcoal Filter Units Due to Difficulties W/Procurement & Delivery of Integral Components + (03:12:44, 4 December 2024)
- ML20215H700 + (03:12:45, 4 December 2024)
- ML20215H698 + (03:12:46, 4 December 2024)