Other: ML20009A197, ML20083C066, ML20215H761, ML20215J264, ML20235U046, ML20235U058, NL-87-1227, Forwards Procedures AP.2.06, Validation of Emergency Operating Procedures & AP.2.07, Verification of Emergency Operating Procedures, for Incorporation Into Procedures Generation Package,Per Generic Ltr 82-33
|
MONTHYEARML19331C9121980-08-11011 August 1980 Notification of 800821 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Abnormal Transients Operating Guidelines Program for B&W Reactors Project stage: Meeting ML16138A4551980-09-30030 September 1980 Summary of 800821 Meeting W/B&W Reactor Owners Group Re Abnormal Transient Operating Guidelines Program Project stage: Meeting ML20009A1971981-06-29029 June 1981 Responds to NUREG-0737 Item 1.C.1,re Abnormal Transient Operator Guidelines,Per NRC 810601 Request.Event Trees Provided Consider Failure of All Relevant Challenged Sys Including Failures Involving Multiple Sys Project stage: Other ML20083C0661983-12-0909 December 1983 Forwards Proposed Comprehensive Plan & Schedule for Addressing Generic Ltr 83-31, Safety Evaluation of Abnormal Transient Operating Guidelines. Submittal Completes Obligations Needed to Close NUREG-0737,Item I.C.1 Project stage: Other ML20135G5861985-09-11011 September 1985 Forward Rev 0 to 74-1152414, B&W Owners Group Emergency Operating Procedures Technical Bases Document, Consolidating Abnormal Transient Guidelines (Atog) & Supplemental Response Re Oconee 3 Final Atog Project stage: Supplement ML20215J2641987-02-0505 February 1987 Procedure AP.2.24, Emergency Operating Procedures Writers Guide Project stage: Other ML20215H7611987-06-16016 June 1987 Advises That Info Provided in Rj Rodriguez Still Valid W/Exception of AP.47, Emergency Operating Procedures (EOP) Writers Guide. AP.2.24, EOP Writers Guide Encl Project stage: Other ML20235U0581987-08-18018 August 1987 Procedure AP.2.07, Verification of Emergency Operating Procedures Project stage: Other ML20235U0461987-08-18018 August 1987 Procedure AP.2.06, Validation of Emergency Operating Procedures Project stage: Other NL-87-1227, Forwards Procedures AP.2.06, Validation of Emergency Operating Procedures & AP.2.07, Verification of Emergency Operating Procedures, for Incorporation Into Procedures Generation Package,Per Generic Ltr 82-331987-10-0202 October 1987 Forwards Procedures AP.2.06, Validation of Emergency Operating Procedures & AP.2.07, Verification of Emergency Operating Procedures, for Incorporation Into Procedures Generation Package,Per Generic Ltr 82-33 Project stage: Other 1985-09-11
[Table View] |
Text
i P E o MUNICIPAL UTILITY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA JUN 161987 GCA 87-213 j
U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.
Associate Director for Projects Philips Bldg.
7920 Norfolk Avenue Bethesda, MD 20014
. DOCKET 50-312 RANCHO SEC0 NUCLEAR GENERATING STATION UNIT #1 PROCEDURES GENERATION PACKAGE
Reference:
Letter. dated January 31, 1984 from R. J. Rodriguez to J. F. Stolz
Dear Mr. Miraglia:
Per a request from the staff, the District has reviewed the original submittal (referenced) and determined that the information provided is still valid, with the exception of the E0P Writers Guide, AP.47. This has been superseded by the issuance of AP.2.24 Attached for your use is a copy of AP.2.24,
" Emergency Operating Procedures Writers Guide."
If you have any questions, please contact John Atwell of nly staff.
Sincerely, bg8pw A G. Carl Andogpini Chief Executive Officer, Nuclear Attachment cc:
G. Kalman, NRC, Bethesda (2)
A. D'Angelo, NRC, Rancho Seco
/
ho F
RANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935
~
4 ATTACHMENT EMERGENCY OPERATING PROCEDURES WRITERS GUIDE 1
-