Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323J047 + (23:41:03, 31 December 2024)
- 05000339/LER-1980-005, Forwards LER 80-005/03L-0 + (23:41:04, 31 December 2024)
- ML19323J044 + (23:41:05, 31 December 2024)
- 05000327/LER-1980-063-03, /03L-0:on 800513,operator Mistakenly Tripped Normal Feeder from 6.9 Kv Unit Board 2B-B W/O Putting Synchroscope Switches to on Position.Loss of Power to 6.9 Kv Shutdown Board 2A-A Resulted.Caused by Operator Error + (23:41:07, 31 December 2024)
- ML19323J041 + (23:41:08, 31 December 2024)
- 05000366/LER-1980-083-03, /03L-0:on 800514,w/reactor in Startup Mode, Personnel Observed That Indicating Lights for 2D RHR Pump Suction Valves Were Extinguished.Valves Were Not Operable from Control Switches.Caused by Broken Limit Switch Rotors + (23:41:09, 31 December 2024)
- 05000327/LER-1980-063, Forwards LER 80-063/03L-0 + (23:41:11, 31 December 2024)
- 05000366/LER-1980-083, Forwards LER 80-083/03L-0 + (23:41:13, 31 December 2024)
- ML19323J035 + (23:41:14, 31 December 2024)
- ML19323J034 + (23:41:15, 31 December 2024)
- 05000321/LER-1980-053-01, /01T-0:on 800524,during Normal Operation, Discovered That Loss of Power to Essential Motor Control Ctr 1B W/Recirculation Discharge Line Break Would Render Both Loops of RHR & Loop a of Core Spray Inoperable + (23:41:18, 31 December 2024)
- 05000321/LER-1980-053, Fowards LER 80-053/01T-0 + (23:41:23, 31 December 2024)
- ML19323J027 + (23:41:24, 31 December 2024)
- ML19323J026 + (23:41:25, 31 December 2024)
- 05000338/LER-1980-045-03, /03L-0:on 800513,deviation of Plus 3% Between Auxiliary Shutdown Panel Indicator LI-1459C & Control Room Indicator LI-1-461 Was Exceeded.Caused by Packing Leak on Isolation Valve 1-RC-129.Valve Repaired + (23:41:33, 31 December 2024)
- ML19323J021 + (23:41:37, 31 December 2024)
- ML19323J019 + (23:41:38, 31 December 2024)
- 05000338/LER-1980-045, Forwards LER 80-045/03L-0 + (23:41:39, 31 December 2024)
- ML19323J016 + (23:41:40, 31 December 2024)
- ML19323J014 + (23:41:43, 31 December 2024)
- ML19323J013 + (23:41:44, 31 December 2024)
- ML19323J011 + (23:41:45, 31 December 2024)
- 05000295/LER-1980-023-01, /01T-0:on 800523,charging Pump 10CFR21 Concern Discovered Through Westinghouse Generic Notification.Caused by Design Flow Insufficient at High Pressure.Standing Order Issued to Open Miniflow Valves When Needed + (23:41:48, 31 December 2024)
- 05000295/LER-1980-023, Forwards LER 80-023/01T-0 + (23:41:50, 31 December 2024)
- ML19323J005 + (23:41:52, 31 December 2024)
- ML19323J004 + (23:41:53, 31 December 2024)
- ML19323J003 + (23:41:54, 31 December 2024)
- ML19323J002 + (23:41:57, 31 December 2024)
- ML19323J000 + (23:41:58, 31 December 2024)
- ML19323H997 + (23:41:59, 31 December 2024)
- ML19323H999 + (23:41:59, 31 December 2024)
- ML19323H996 + (23:42:00, 31 December 2024)
- ML19323H994 + (23:42:01, 31 December 2024)
- ML19323H993 + (23:42:02, 31 December 2024)
- ML19323H991 + (23:42:03, 31 December 2024)
- ML19323H990 + (23:42:04, 31 December 2024)
- ML19323H989 + (23:42:04, 31 December 2024)
- ML19323H988 + (23:42:05, 31 December 2024)
- ML19323H987 + (23:42:06, 31 December 2024)
- ML19323H986 + (23:42:09, 31 December 2024)
- ML19323H984 + (23:42:10, 31 December 2024)
- ML19323H983 + (23:42:11, 31 December 2024)
- ML19323H981 + (23:42:12, 31 December 2024)
- ML19323H982 + (23:42:12, 31 December 2024)
- ML19323H978 + (23:42:13, 31 December 2024)
- ML19323H979 + (23:42:13, 31 December 2024)
- ML19323H977 + (23:42:25, 31 December 2024)
- ML19323H975 + (23:42:27, 31 December 2024)
- ML19323H974 + (23:42:28, 31 December 2024)
- ML19323H973 + (23:42:29, 31 December 2024)
- ML19323H972 + (23:42:30, 31 December 2024)