4 VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-05 FOR THE MONTH OF MAY, 1980 l
l i
8 00617 0 hTT
OPERATNG DATA REPORT
~
DOCKET NO. 50-271 yA7g BUU 6U.
COh!PLETED BY F. C. Beers TELEPHONE A17 '66 0011,X2215
~;~
OPERATING STATUS Notes Vermont Yankee
- 1. Unit Name:
Mav. 1980
- 2. Reporting Period:
1593
- 3. Licensed Thennst Power (5 twt):
540
- 4. Nsmep!ste Rating (Gross 31We):
514 (open) 504 (closed )
S. Design E!:ctrical Ratinj (Net 5!We):
535'
- 6. 31sximum Dependsbie Capacity (Gross MWe):
50 4
- 7. 51sximum Dependsble Capscity (Net SIWE):
- 8. If Changes Occur in Capseity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
' 9. Power LevelTo Which Restricted.lf Any(Net 31We):
- 10. Reasons For Restrictions.If Any:
This hionth
.Yr to.Dste
' Cumulative 744 3.647
- 11. Hours in Reporting Period 744 3.501.43 54.659.82
- 12. Number Of Hours Reactor Was Critical 00 0.0 0.0
~ 13. Reactor Reserve Shutdown Hours 744.00 3,458.60 52,786.38 14, Hours Gener: tor On.! 'ne nn nn nn
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therms! Energy Genersted (MWH) 1 171 100 nn 9 119.447.nn 76.964 n60.00
- 17. Gross Electriesl Energy Cenerated stWH) tom An1 no.
1, nom 11A nn 9A 7o9 ana.nn 18.' Net Electrics! Energy Generated (31WH)
'374.298.00 1.744.461.00 23.512.826.00 100.00 94.83 78.27
- 19. Unit Service Factor 100.00 94.83 78.27
- 20. Unit _Avsilsbility Factor 99.82 94.01 69.17
- 21. Unit Capacity Factor (Using StDC Net) 97.88 93.06 67.83
- 22. Unit Capacity Factor (Using DER Net) 0.0
.77 6.16
- 23. Unit Forced Outage Rste
- 24. Shutdowns Scheduled Over Next 6 51onths (Type. Date. sad Duration of Esch):
Refueling outage scheduled to begin on Sept. 26, 1980 and will last for approximately eight weeks.
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
Forecss:
Achieved
- 26. Units in Test Status (Prior to Commercial Opersti(nu.
INITIAL CRITICALITY INITIAL ELECTRICITY CO315tERCIAL OPERATION-
- (of77) l
,.l.--:----,,
.n.-
-,_.,n. - -, -. - -, - -
- ~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee 800612 DATE COMPLETED BY F.
- c. Beers 617-366-9011 X2215 TELEPHONE MoyTH Mav. 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 524 37 478 2
523 18 495 3
523 19 492 4
519 20 493 523 21 497 523 6
24 494 23 492 7
521 8
524 24 482 9
524 25 496 26
'498
~
10 522 33 511 27 498-12 518 28 499 13 517 29 497
~
14 514 30 495 15 504 33 482 16
&9i INSTRUCTIONS On this formst. list the sverage dsily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawstt.
e
i UNITSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.
50-271 UNIT NAnlE Vermont Yankee DATE 800612 REPORT A10NTil May. 1980 C0&frLETED IlY F_
C.
Beers TELEril0NE 617-366-9011 X2215
's e. 5 E
e c.
N..
Date E.
$,0
~d s N Cause & corrective
-o n
.c a a:
Evens 4
n.4 Act,onin i
[g
[3 E 5'
jdiy Report
- N0 Pacvent itecurrence c
O l
l 80-12 800511 S
0 11 4-N/A RA 00NROD Main Turbine and Control Rod (Power Surveillance.
Reduc-tion) 80-13 800516 S
0 H
4~
N/A MB XXXXX Power reduced to investigate A0G (Power processing. problem.
Reduc-
]
tion) 4 N
1
-l I
2 3
4 F: Fint cd Iteason:
Method:
Exhibit G Insieuctions S: Sthednied A. Equipment Failure (Explain)
- 1. Manual for Picparailun of Data ll Maintenance or Test
- 2. Manual Serain.
Ent y Slicens for I.icensee C-Itefueling J. Automatic Scrain.
Evens IteporI (Llilt) File (NURf.G-i l
D Itegulatoiy itestriction 4 Other(Explain) 0161) l E Opciator Tsaininga License Examinailon i
F. Aitminiss eative 5
G 0.ciational I.isur (limplain)
Exhibit I Same Sousee 3
(9/77)
Il Olhca (Expl.iin) e
s DOCKET NO.
50-271 UNIT Vermont Yankee DATE 800612 C014PLETED BY F. C. Beers TELEPil0NE 617-366-9011 X2215 SAFETY RELATED MAI?(TENANCE MAY,1980 NATURE OF LER Olt Otfl' AGE HALFUNCTION EQUIPilENT HAINTENANCE HUfIBER CAUSli IlliSULT C0llRECTIVil ACT!ON "A" Service Water Pump Corrective N/A Loose Packing Cland Leakage Adjusted Packing P-71-A MR 80,-478 HPIC Condensate Corrective N/A Loose Packing Cland Leakage Adjusted Packing Pump P87-1-A MR 80-502 e
0 l
i i
l 9
~
g7..
e DOCKET NO.
50-271 UNIT Vermont Yankee
- DATE 800612 COMPLETED BY
- p. c. neers TELEPHONE 617-366-9011 X2215 REPORT MON May, 1980 StBBIARY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 98.98% of rated thermal power for the month.
Gross electrical generation was 395,401 MWH -or 98.4% of design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
5/1/80 At the beginning of the reporting period the plant was at 99.8% of rated thermal power.
5/11/80 At 0100 hrs. power was reduced for surveillance testing.
1 5/15/80 At 1140 hrs. the plant changed to the closed cycle. mode of circulating water cooling.
5/16/80 At 1505 hrs. a power reduction was initiated to inves-tigate A0G processing problems.
5/31/80 At the end of the reporting period the plant was at 99.8% of rated thermal power.
l l
w