.g AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-010 t)UiT Dresden I DATE June 2,1980 COMPLETED 8Y S. A. Cieszkiewicz TELEPHONE (815) 942-2920, ext. 489 MONTH MAY, 19 80 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MUe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 o
20 0
f 5
0 21 0
6 0
22 o
7 0
23 0
8 0
24 0
9 0
25 o
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 o
30 o
15 0
31 o
16 0
006170YIb 8
~1 OPERATING DATA RE? ORT DOCKET NO. 050-010 DATE June 2. 1980 COMPLETED BY S. Cieszkiewicz 5.
TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.
Unit Name: Dresden I 2.
Reporting Period: May, 1980 3
Licensed Thermal Power (MWt): 700 4.
Nameplate Rating (Gross MWe): 209 5
Design Electrical Rating (Net MWe): 200 6.
Maximum Dependable Capacity (Gross MWe): ?ns 7
Maximum Dependable Capacity (Net MWe):
19 7 8.
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
NA 9,
Power Level to Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, if Any:
NA l
l This Month Yr-to-Date Cumulative.
11.
Hours in Reporting Period 744 3.647 176,447 12.
Number of Hours Reactor Was Critical 0
0 113.153.75 13 Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 0
0 111,196.15 15 Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 0 0
56,014,747.15 17.
Gross Electrical Energy Generated (MWH) 0 0
16,799,254.19 18.
Net Electrical Energy Generated (MWH)
-1,394.4
-4,709.7 15,805,116.2 2 19 Unit Service Factor 0
0 63 20.
Unit Availability Factor 0
0 63 21.
Unit Capacity Factor (Using MDC Net) 0 0
45 22.
Unit Capacity Factor (Using DER Net) 0 0
45 j
23 Unit Forced-Outage Rate 0
0 11 24.
Shutdowns. Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA 25 If Shut Down At End Of Report Period, Estimated Date of Startup: NA
utst.l;t i Iser. 050-010 UNIT SiluTDOWHS AND PO!/ER REDUCT10lls UillT flAllE Dresden I DATE June 2.
1980 C0ftPLETED BY S. A. Cieszkiewicz
~
REPORT HONTil MAY, 1960
- e q
660 E
en n
0E v.E N Licensee r t,
.gn
~~
g e
Cause & Corrective e
o No.
Date E
NS E
2 U cE Event
%3 3
Action to
]s5 el Uj Report #
N" Prevent Recurrence
^
8 781031 S
744 C
3 Refuel.and chemical cleaning outage.
i e
4.
\\
i i
~
1 g
.,Q -
1 V-
'l
\\
8 e
j 2
F:
Forced Reason:
G-Operational Error Is-otlier (Explain)
' St Scheduled A-Equipment Failure (Explaln) '
il-Other(Explain)
B-Halntenance of Test la Exhibit G-Instructions.for C-Refueling 3 Hethod:
Preparation of Data D-Regulatory Restriction 1 -Itanua l Entry Sheets fr-Licensee t-Operator.Tralning s License Examina i
2-Ilanual Scram Event Report (
Jrile(NUREG -
F-Admlhlstrative 3-Aut'oinatle Scram 0161)
( p
\\
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE MAY, 1980 5-1 to 5-31 Unit one was shutdown for the entire month, continuing preparation for chemical cicaning and refueling.