Monthly Operating Rept for May 1980
ML19323J002
Person / Time
Site: Dresden 
Issue date: 06/02/1980
From: Cieszkiewicz S
COMMONWEALTH EDISON CO.
To:
Shared Package
ML19323J001 List:
References
NUDOCS 8006170452
Download: ML19323J002 (4)


Text

_ - _ - _ _ -.

^. /^{ '

.g AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-010 t)UiT Dresden I DATE June 2,1980 COMPLETED 8Y S. A. Cieszkiewicz TELEPHONE (815) 942-2920, ext. 489 MONTH MAY, 19 80 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MUe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 o

20 0

f 5

0 21 0

6 0

22 o

7 0

23 0

8 0

24 0

9 0

25 o

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 o

30 o

15 0

31 o

16 0

006170YIb 8

~1 OPERATING DATA RE? ORT DOCKET NO. 050-010 DATE June 2. 1980 COMPLETED BY S. Cieszkiewicz 5.

TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.

Unit Name: Dresden I 2.

Reporting Period: May, 1980 3

Licensed Thermal Power (MWt): 700 4.

Nameplate Rating (Gross MWe): 209 5

Design Electrical Rating (Net MWe): 200 6.

Maximum Dependable Capacity (Gross MWe): ?ns 7

Maximum Dependable Capacity (Net MWe):

19 7 8.

If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:

NA 9,

Power Level to Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, if Any:

NA l

l This Month Yr-to-Date Cumulative.

11.

Hours in Reporting Period 744 3.647 176,447 12.

Number of Hours Reactor Was Critical 0

0 113.153.75 13 Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 0

0 111,196.15 15 Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 0 0

56,014,747.15 17.

Gross Electrical Energy Generated (MWH) 0 0

16,799,254.19 18.

Net Electrical Energy Generated (MWH)

-1,394.4

-4,709.7 15,805,116.2 2 19 Unit Service Factor 0

0 63 20.

Unit Availability Factor 0

0 63 21.

Unit Capacity Factor (Using MDC Net) 0 0

45 22.

Unit Capacity Factor (Using DER Net) 0 0

45 j

23 Unit Forced-Outage Rate 0

0 11 24.

Shutdowns. Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA 25 If Shut Down At End Of Report Period, Estimated Date of Startup: NA

utst.l;t i Iser. 050-010 UNIT SiluTDOWHS AND PO!/ER REDUCT10lls UillT flAllE Dresden I DATE June 2.

1980 C0ftPLETED BY S. A. Cieszkiewicz

~

REPORT HONTil MAY, 1960

  • e q

660 E

en n

0E v.E N Licensee r t,

.gn

~~

g e

Cause & Corrective e

o No.

Date E

NS E

2 U cE Event

%3 3

Action to

]s5 el Uj Report #

N" Prevent Recurrence

^

8 781031 S

744 C

3 Refuel.and chemical cleaning outage.

i e

4.

\\

i i

~

1 g

.,Q -

1 V-

'l

\\

8 e

j 2

F:

Forced Reason:

G-Operational Error Is-otlier (Explain)

' St Scheduled A-Equipment Failure (Explaln) '

il-Other(Explain)

B-Halntenance of Test la Exhibit G-Instructions.for C-Refueling 3 Hethod:

Preparation of Data D-Regulatory Restriction 1 -Itanua l Entry Sheets fr-Licensee t-Operator.Tralning s License Examina i

2-Ilanual Scram Event Report (

Jrile(NUREG -

F-Admlhlstrative 3-Aut'oinatle Scram 0161)

( p

\\

SUMMARY

OF OPERATING EXPERIENCE UNIT ONE MAY, 1980 5-1 to 5-31 Unit one was shutdown for the entire month, continuing preparation for chemical cicaning and refueling.