ML19323J003
| ML19323J003 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/02/1980 |
| From: | Cieszkiewicz S COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML19323J001 | List: |
| References | |
| NUDOCS 8006170457 | |
| Download: ML19323J003 (6) | |
Text
_
-c, -y -;
. -(,,
l
%/
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-237 UlllT Dresden II DATE June 2, 1980 COMPLETED 8Y S. A. Cieszkiewicz TELEPHONE (815) 942-2920, ext. 489 MONTH MAY, 1980 DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) l 1
720 17 0 714 18 17 3
703 19 436 4
623 20 637 5
711 21 626 6
707 22 304 7-
-70 7 23 572 8
707 24 664 9
70 3 25 603
~
10 695 26 681 11 691 27_
692 12 284 28 679 13 0
29 672 14 0
30 669 15-0' 31.
670 16-0
- 8006:17Off7
OPERATING DATA REPORT DOCKET NO. 050-237 OATE June 2.
1980 COMPLETED BY S. Cieszkiewicz_,
TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.
. Unit Name: Dresden II 2.
Reporting Period: May, 1980 3
Licensed Thermal Power (MWt): 2.527 4.
Nameplate Rating (Gross MWe):
828 5
Design Electrical Rating (Net NWe): 794 6.
Maximum Dependable Capacity (Gross MWe): 812 7.
Maximum Dependable Capacity (Net MWe): 772 8.
If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:
NA 9
Power Level to Which Restricted, If Any (Net MWe): NA 10.
Reasons For Restrictions, if Any: NA This Month Yr-to-Date Cumulative 11.
Hours in Reporting Period 744 3,647 88,103 12.
Number of Hours Reactor Was Critical 599.35 3,487.03 68,223.47 13 Reactor Reserve Shutdown Hours 0
0 0
14.-
Hours Generator On-Line 578.58 3,456.6 64,719.13 15 Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,287,238 8,113,608 134,839,223 17 Gross Electrical Energy Generated (MWH) 401,639 2.582.138 41.588.757 j
18.
Net Electrical Energy Generated (MWH) 378,731 2,452,499.4 39,340,610.617 19 Unit Service Factor 78 95 73 20.
Unit Availability Factor 78 95 73 21.
Uni t Capaci ty Factor (Using MOC Net) 66 87 58 22.
Unit Capacity. Factor (Using DER Net) 64 85 56 23 Unit Forced Outage Rate 3
1 13 24.
Shutdowns' Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA-25.
If Shut Down At End Of Report Period, Estimated Date of Startup: NA
UtH.I.L i 114. 050-237 UNIT SIIUTD0V115 AND POVER REDUCT10lls Utili flNIE Dreedin II DATE Jun* 2.
1980 00ftPLETED nY S. A. Cieszkiewice TELEPil0llE (815) 942-2920 REPORT N0HTil RW, 1980 q
% m8 E
en n
e E
v.5 %
Licensee 7e E"e Cause & Corrective
~
o No.
Date E
No E
2US Event
%I 0.3 Action to j5 E
ej Report #
A" j"
Prevent Recurrence O
3 ^
800512 F
10.0 G
3 Rx scrammed on MSL 111 Rad (spurious signal) 4 800512 S
144.6 A
Maintenance outage - replaced "B" recirc.
~
t pomp seals s
'5
.80'0522' F
10.8 G
3 Rx scrammed on Rx low level (instrument r'
rack jarred) s 1
q e
\\
\\
l 1
s Ft Forced Reason:
G-Operational Error fa-other (Explain)
SI Scheduled A-Equipment Failure (Explain) '
Il-Other (Explain)
B-Itaintenance of Test is Exhibit G-Instructions.for C-Refueling D-Regulatory ltestriction 3 liet hod:
preparation of Data 1 -itanua l Entry Sheets fo* licensee E-Operator. Training & License Examina 1
2-Ilonudi Scrnm Event Report (
Fi l e (fiUREG-.
F-Administrative 3-Aut'omotic Scram 0161)
(
i D.
~ -.
DRESDEtt UtilT 2
~
SAFETY RELATED 11AINTEllAllCE - MAY, 1980 NATURE OF LER OR OUTAGE IIALFullCT10ft CORRECTIVI-Acil0N EQUIPl1ENT liAINTEllAtlCE
- IlultBER CAUSE RESULT NA -
NA Lubricated shaf t & stroked A0 Velve 1601-62 Preventive WR #6350 Outage #2-2 valve.
NA NA Changed wirinF-HPCI Valve Preventive WR #6168 Outage #2-2 2301-35 & 36 NA NA Ad' justed lever..
HPCI Turbine Preventive WR #6219 Outage #2-2 Turning Gear i
NA NA Replaced pots.
2"A" 125V Preventive WR #6424 Outage #2-2 Battery Charger NA NA Replaced locking screw Icolation Con-Preventive WR #6135 Outage #2-2 threads.
drnser Steam Linn Flow Switch NA NA Replaced relay.
Main Steam Line Preventive WR #6392 Outage #2-3 Iligh Radiation LER #80-14/03L-0 Monitor "C" 1
l
4 N
O n
I o
T i
C t
A c
"E e
p V
sn I
T i
C E
d R
e R
m O
r C
o fre P
TL U
A S
N E
R l
t 0
l T
C N
0 U
8 F
9 L
1 AH Y
E
\\
S E
U A
3 A
N
/
C 2
E T
C l
I A
l NU N
E N
T E
H D
l S
A E
H R
E D
D G
E A
T T
A UR L
OE E
B R
RM OU Y
N T
R E
E F
L A
S 6
0 4
6 E
FC R
Ol W
lA EN e
RE v
UT i
Tl t
l Al n
NA e
M ver P
\\
ro ta T
r N
e E
n H
e P
G 8
0 l
0 e
E s
e i
D
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO MAY, 1980 5-1 to 5-12 Unit Two started the month operating at a power level of 720 MWe.
On May 12, at 1011, a spurious signal developed on the main steam high radiation monitors, resulting in a Group I isolation and subsequent reactor scram.
5-12 to 5-18 Unit Two commenced its scheduled main-tenance outage at 2011 on May 12, 1980 to replace "B" recire. pump seals.
5 to 5-22 The Unit was placed back on line at 2047 l
on May 18 and reached a power level of 630 MWe when the inadvertent jarring of an instrument rack by Mechanical Main-4 l
tenance resulted in the Unit scramming on reactor low level at 1137 on May 22.
1 5-22 to 5-31 The Unit was again placed on line at 2226 and operated the remainder of the month at an average power level of 621 MRe, with a capacity factor of 64% for the entire month.