Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1980-056-03, /03L-0:on 800701,average Power Range Monitors (APRM) B & F Determined Inoperative Due to Lack of Eleven Low Power Range Monitor (LPRM) Inputs Per Monitor.Caused by LPRM Connectors That Feed Into APRM Being Pulled Loose + (10:16:41, 31 December 2024)
- ML19330A955 + (10:16:42, 31 December 2024)
- 05000325/LER-1980-059-01, /01T-0:on 800710,util Informed by GE That Process Computer Was Not Using Correct Fuel Lengths When Calculating Max Total Peaking Factor.Cause Not Stated.Procedures Revised to Correct Tpf Ref Value + (10:16:44, 31 December 2024)
- 05000327/LER-1980-101-03, /03L-0:on 800622,steam Generator Level Indicator 1-L1-3-51 Was Reading 10% Higher than Other Two Indicators. Caused by Defective Transmitter.Defective Transmitter Was Replaced + (10:16:46, 31 December 2024)
- 05000325/LER-1980-056, Forwards LER 80-056/03L-0 + (10:16:48, 31 December 2024)
- 05000270/LER-1980-006, Forwards LER 80-006/03L-0 + (10:16:50, 31 December 2024)
- 05000325/LER-1980-059, Forwards LER 80-059/01T-0 + (10:16:52, 31 December 2024)
- 05000327/LER-1980-101, Forwards LER 80-101/03L-0 + (10:16:54, 31 December 2024)
- 05000327/LER-1980-100-03, /03L-0:on 800623,containment Isolation & Purge Exhaust Valves FCV-30-37 & FCV-30-40 Found to Have Excessive Leakage.Caused by Debris Under Seating Surface. Debris Was Blown Out & Valves Restested + (10:16:56, 31 December 2024)
- 05000320/LER-1980-026-03, /03L-0:on 800618,during Recovery Mode,Unit 2 Fire Pump Removed from Svc.Unit 1 Pump Discovered Unaligned to Fire Suppression Header.Caused by Personnel Error.Procedures Revised to Reflect Permanent Valve Lineup Change + (10:16:58, 31 December 2024)
- 05000320/LER-1980-026, Forwards LER 80-026/03L-0 + (10:17:00, 31 December 2024)
- 05000327/LER-1980-100, Forwards LER 80-100/03L-0 + (10:17:02, 31 December 2024)
- ML19330A939 + (10:17:03, 31 December 2024)
- ML19330A938 + (10:17:03, 31 December 2024)
- ML19330A937 + (10:17:04, 31 December 2024)
- 05000327/LER-1980-102-03, /03L-0:on 800622,while in Mode 3,operator Observed 1-LI-3-110,steam Generator 4 Narrow Range Level, Reading High.Cause Not Stated.Transmitter Sense Lines Refilled & Transmitter Calibr Checked + (10:17:06, 31 December 2024)
- AECM-80-162, Deficiency Status Rept 1 Re Damaged Stator Coil for Standby Diesel Generator.Deficiency Investigation Incomplete. Reportability Determination & Final Rept Will Be Submitted by 801217 + (10:17:07, 31 December 2024)
- ML19330A934 + (10:17:07, 31 December 2024)
- 05000327/LER-1980-102, Forwards LER 80-102/03L-0 + (10:17:13, 31 December 2024)
- ML19330A930 + (10:17:16, 31 December 2024)
- ML19330A929 + (10:17:17, 31 December 2024)
- ML19330A926 + (10:17:18, 31 December 2024)
- ML19330A927 + (10:17:18, 31 December 2024)
- ML19330A925 + (10:17:19, 31 December 2024)
- ML19330A923 + (10:17:20, 31 December 2024)
- ML19330A921 + (10:17:21, 31 December 2024)
- 05000327/LER-1980-108-03, /03L-0:on 800624,during Normal Operations,Fuse in Switching Bridge Circuit Failed on Vital Inverter 2-I Which Rendered 120 Volt Ac Vital Instrument Power Board 2-I Inoperable.Cause Unknown.Fuse Replaced + (10:17:22, 31 December 2024)
- ML19330A919 + (10:17:24, 31 December 2024)
- 05000327/LER-1980-108, Forwards LER 80-108/03L-0 + (10:17:25, 31 December 2024)
- ML19330A916 + (10:17:26, 31 December 2024)
- ML19330A915 + (10:17:27, 31 December 2024)
- ML19330A914 + (10:17:28, 31 December 2024)
- ML19330A913 + (10:17:29, 31 December 2024)
- ML19330A912 + (10:17:30, 31 December 2024)
- ML19330A911 + (10:17:31, 31 December 2024)
- 05000259/LER-1980-052-03, /03L-0:on 800628,during Normal operation,4kV SD Bd B Tripped on Degraded Voltage,Initiating Auto Start of Diesel Generator B.Diesel Generator Tripped Again on Degraded Voltage.Caused by Improper Switch Alignment + (10:17:32, 31 December 2024)
- ML19330A909 + (10:17:34, 31 December 2024)
- 05000259/LER-1980-052, Forwards LER 80-052/03L-0 + (10:17:38, 31 December 2024)
- ML19330A906 + (10:17:39, 31 December 2024)
- ML19330A905 + (10:17:40, 31 December 2024)
- ML19330A904 + (10:17:41, 31 December 2024)
- ML19330A902 + (10:17:42, 31 December 2024)
- ML19330A903 + (10:17:42, 31 December 2024)
- ML19330A901 + (10:17:43, 31 December 2024)
- ML19330A900 + (10:17:44, 31 December 2024)
- 05000327/LER-1980-111-03, /03L-0:on 800626,during Normal operation,1-FCV-62- 136 (B Train to Suction of Charging Pump from RWST) Would Not Open from Main Control Room.Caused by Valve Operator Torque Spring Being Out of Adjustment.Spring Readjusted + (10:17:45, 31 December 2024)
- AECM-80-163, Provides Status of Potentially Reportable Deficiency Re Loss of Offsite Power Accident & Effects on Rod Position Sys & Neutron Monitoring Sys.Deficiency Still Under Investigation.Final Rept Will Be Provided by 801230 + (10:17:46, 31 December 2024)
- ML19330A895 + (10:17:48, 31 December 2024)
- 05000327/LER-1980-111, Forwards LER 80-111/03L-0 + (10:17:49, 31 December 2024)
- ML19330A891 + (10:17:51, 31 December 2024)
- ML19330A892 + (10:17:51, 31 December 2024)