Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19259C071 + (20:42:28, 3 January 2025)
- ML19259C069 + (20:42:30, 3 January 2025)
- 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing + (20:42:54, 3 January 2025)
- 05000293/LER-1979-018-01, /01T-1: on 790519,recirculation Pump Started W/Delta Temp Between Loops Greater than 50 F & Reactor Coolant Temp Greater than 212 F.Caused by Failure to Follow Station Operating Procedures & Temp Monitors + (20:43:08, 3 January 2025)
- 05000293/LER-1979-018, Forwards LER 79-018/01T-1 + (20:43:12, 3 January 2025)
- ML19259C064 + (20:43:16, 3 January 2025)
- TXX-2996, Forwards Affidavit of Svc for Amend 6 to FSAR + (20:43:17, 3 January 2025)
- ML19259C062 + (20:43:24, 3 January 2025)
- ML19259C061 + (20:43:26, 3 January 2025)
- ML19259C060 + (20:43:29, 3 January 2025)
- ML19259C059 + (20:43:30, 3 January 2025)
- ML19259C057 + (20:43:31, 3 January 2025)
- ML19259C056 + (20:43:33, 3 January 2025)
- ML19259C055 + (20:43:34, 3 January 2025)
- ML19259C054 + (20:43:42, 3 January 2025)
- ML19259C053 + (20:43:44, 3 January 2025)
- ML19259C052 + (20:43:45, 3 January 2025)
- ML19259C051 + (20:43:48, 3 January 2025)
- ML19259C050 + (20:43:49, 3 January 2025)
- ML19259C049 + (20:43:51, 3 January 2025)
- ML19259C048 + (20:43:52, 3 January 2025)
- ML19259C047 + (20:43:56, 3 January 2025)
- ML19259C046 + (20:43:58, 3 January 2025)
- ML19259C045 + (20:44:00, 3 January 2025)
- ML19259C044 + (20:44:01, 3 January 2025)
- ML19259C042 + (20:44:03, 3 January 2025)
- IR 05000309/1979002 + (20:44:05, 3 January 2025)
- ML19259C040 + (20:44:09, 3 January 2025)
- ML19259C039 + (20:44:11, 3 January 2025)
- ML19259C038 + (20:44:13, 3 January 2025)
- ML19259C037 + (20:44:15, 3 January 2025)
- ML19259C035 + (20:44:16, 3 January 2025)
- ML19259C034 + (20:44:18, 3 January 2025)
- ML19259C033 + (20:44:20, 3 January 2025)
- ML19259C032 + (20:44:21, 3 January 2025)
- ML19259C030 + (20:44:23, 3 January 2025)
- 05000277/LER-1979-020-03, /03L-0 on 790503:solution Temp in Standby Liquid Control Sys Found to Be 2 F Less than Tech Spec Requirement for Existing Boron Concentration.Caused by Incorrect Acceptable Temp Controller Setpoint Range + (20:44:29, 3 January 2025)
- ML19259C015 + (20:44:31, 3 January 2025)
- 05000277/LER-1979-022-03, /03L-0 on 790513:fire Hose Nozzles Were Missing from Two Hose Stations in Turbine Bldg.Cause Not Noted. Nozzles Replaced & Wrench Tightened to Inhibit Removal + (20:44:37, 3 January 2025)
- ML19259C013 + (20:44:42, 3 January 2025)
- 05000277/LER-1979-019-03, /03L-0 on 790501:during Surveillance Testing of Normally Open Primary Containment Isolation Valves,Four Oxygen Analyzer Sys Isolation Valves Failed to Close.Caused by Binding of Pistons in Valve Bodies.Valve Parts Rebuilt + (20:45:20, 3 January 2025)
- ML19259C011 + (20:45:23, 3 January 2025)
- ML19259C010 + (20:45:25, 3 January 2025)
- ML19259C008 + (20:45:28, 3 January 2025)
- ML19259C007 + (20:45:38, 3 January 2025)
- ML19259C005 + (20:45:39, 3 January 2025)
- ML19259C004 + (20:45:46, 3 January 2025)
- ML19259C003 + (20:45:49, 3 January 2025)
- ML19259C002 + (20:45:51, 3 January 2025)
- ML19259B979 + (20:45:53, 3 January 2025)
- ML19259B964 + (20:47:10, 3 January 2025)