Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000309/LER-1979-013, Forwards LER 79-013/03L-0 + (20:33:35, 3 January 2025)
- 05000267/LER-1979-015, Forwards LER 79-015/03L-0 + (20:33:41, 3 January 2025)
- 05000267/LER-1979-016-01, /01T-0 on 790521:punch Gap of Pcrv Rupture Disc M-11702 Found Out of Tolerance W/Vendor Specs.Caused by Undocumented Change of Punch Gap Specs.Tolerances Returned to Original Specs + (20:33:52, 3 January 2025)
- 05000302/LER-1979-050-03, /03L-0 on 790510:count-rate Amplifier & Rate of Change Amplifier for Nuclear Source Range Instrument NI-2 Found Inoperable.Caused by Amplifiers Being Out of Tolerance Due to Instrument Drift.Amplifiers Recalbr & Returned to + (20:34:31, 3 January 2025)
- 05000267/LER-1979-016, Forwards LER 79-016/01T-0 + (20:35:06, 3 January 2025)
- ML19259C139 + (20:35:10, 3 January 2025)
- 05000336/LER-1979-012-01, /01T-0 on 790522:during Rise to 30% Power,Two of Four Linear Power Range Channels Found to Be Inoperable. Open Connections Found Between Detector Cables & Field Wiring.Caused by Connector Pins Pushed Into Connector + (20:35:46, 3 January 2025)
- 05000302/LER-1979-050, Forwards LER 79-050/03L-0 + (20:36:26, 3 January 2025)
- ML19259C135 + (20:36:31, 3 January 2025)
- ML19259C134 + (20:36:32, 3 January 2025)
- ML19259C133 + (20:36:33, 3 January 2025)
- 05000336/LER-1979-012, Forwards LER 79-012/01T-0 + (20:37:05, 3 January 2025)
- ML19259C130 + (20:37:10, 3 January 2025)
- ML19259C128 + (20:37:11, 3 January 2025)
- 05000324/LER-1979-034-03, /03L-0 on 790510:while Performing PT 20.3,primary Containment Isolation Valve Local Leak Rate Test Containment Isolation Valves Would Not Seat & Hold Pressure.Caused by Valve Bushing Wear.Valves Dissassembled & Bushings Repl + (20:37:50, 3 January 2025)
- ML19259C126 + (20:37:54, 3 January 2025)
- ML19259C125 + (20:37:56, 3 January 2025)
- 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded + (20:38:27, 3 January 2025)
- 05000324/LER-1979-034, Forwards LER 79-034/03L-0 + (20:38:47, 3 January 2025)
- ML19259C120 + (20:38:50, 3 January 2025)
- ML19259C119 + (20:38:51, 3 January 2025)
- 05000306/LER-1979-016-03, /03L-0 on 790509:during Audit of Surveillance Program,Found That Reactor Vessel Injection Isolation Valve Test Sp 2159 Had Not Been Done.Caused by Failure to Enter Test on Computer Surveillance Schedule + (20:39:14, 3 January 2025)
- ML19259C117 + (20:39:16, 3 January 2025)
- ML19259C116 + (20:39:17, 3 January 2025)
- ML19259C114 + (20:39:21, 3 January 2025)
- 05000306/LER-1979-016, Forwards LER 79-016/03L-0 + (20:40:03, 3 January 2025)
- 05000250/LER-1979-016-03, /03L-0 on 790429:high Level Alarm Annunciated. Caused by Instrument Drift of Tech Spec Min & High Level Alarms & Digital Level Indicator Transducer.Instruments Recalibr + (20:40:12, 3 January 2025)
- 05000245/LER-1979-013-03, /03L-0 on 790508:oxygen Pressure 603.5 Check for Source Range Monitors Not Completed for 24-h Period. Surveillance Overlooked.Checklist Added to Indicate Requirement of Procedure + (20:40:17, 3 January 2025)
- ML19259C109 + (20:40:20, 3 January 2025)
- 05000245/LER-1979-013, Forwards LER 79-013/03L-0 + (20:40:23, 3 January 2025)
- ML19259C106 + (20:40:26, 3 January 2025)
- 05000250/LER-1979-016, Forwards LER 79-016/03L-0 + (20:40:29, 3 January 2025)
- ML19259C103 + (20:40:31, 3 January 2025)
- 05000250/LER-1979-015-03, /03L-0 on 790426:B Emergency Diesel Generator Failed Loading Acceptance Criteria.Caused by Cracked half-inch Nipple to Fuel Pump Which Resulted in Partial Fuel Starvation.Nipple Replaced & Old Nipple Reanalyzed + (20:40:34, 3 January 2025)
- ML19259C100 + (20:40:43, 3 January 2025)
- ML19259C099 + (20:40:47, 3 January 2025)
- 05000250/LER-1979-015, Forwards LER 79-015/03L-0 + (20:41:29, 3 January 2025)
- ML19259C096 + (20:41:33, 3 January 2025)
- ML19259C095 + (20:41:34, 3 January 2025)
- ML19259C093 + (20:41:35, 3 January 2025)
- 05000250/LER-1979-014-03, /03L-0 on 790424:ready to Start Light on B Emergency Diesel Generator Engine Control Panel Failed. Caused by Vibration of Lamp Socket.Tests Under Way to Determine If Neon Unit Would Be Better Suited + (20:41:46, 3 January 2025)
- ML19259C090 + (20:41:49, 3 January 2025)
- ML19259C088 + (20:41:51, 3 January 2025)
- ML19259C087 + (20:41:53, 3 January 2025)
- ML19259C086 + (20:41:55, 3 January 2025)
- 05000250/LER-1979-014, Forwards LER 79-014/03L-0 + (20:41:57, 3 January 2025)
- ML19259C083 + (20:41:59, 3 January 2025)
- ML19259C082 + (20:42:01, 3 January 2025)
- ML19259C080 + (20:42:02, 3 January 2025)
- ML19259C079 + (20:42:03, 3 January 2025)
- ML19259C078 + (20:42:04, 3 January 2025)