Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217K477 + (13:16:55, 3 December 2024)
- ML20217K476 + (13:16:57, 3 December 2024)
- ML20217K473 + (13:16:58, 3 December 2024)
- ML20217K472 + (13:16:59, 3 December 2024)
- NSD-NRC-97-5259, Forwards Proprietary & non-proprietary Presentation Matls Used During 970701 Meeting at NRC Ofcs in Which 2-D Conduction & Use in Conjunction W/Wgothic Code Is Discussed. Proprietary Portion of Document Was Sent to Westinghouse + (13:17:00, 3 December 2024)
- ML20217K470 + (13:17:00, 3 December 2024)
- B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With + (13:17:03, 3 December 2024)
- ML20217K463 + (13:17:05, 3 December 2024)
- ML20217K462 + (13:17:06, 3 December 2024)
- 05000285/LER-1998-002, :on 980226,TS Violation Was Noted Due to Exceeding Qualified Life for Plant Components.Caused by Lack of Depth Analysis When Original Calculation Was Performed. a Panel Was Repaired & Returned to Service + (13:17:08, 3 December 2024)
- ML20217K460 + (13:17:09, 3 December 2024)
- ML20217K459 + (13:17:09, 3 December 2024)
- ML20217K457 + (13:17:10, 3 December 2024)
- ML20217K456 + (13:17:11, 3 December 2024)
- BECO-LTR-97-103, Informs of Discrepancy in 710825 SER for Pilgrim Station OL & Plans to Remove Operational Restriction Upon Resolution of Issue + (13:17:12, 3 December 2024)
- ML20217K453 + (13:17:12, 3 December 2024)
- ML20217K450 + (13:17:14, 3 December 2024)
- ML20217K451 + (13:17:14, 3 December 2024)
- ML20217K449 + (13:17:15, 3 December 2024)
- ML20217K447 + (13:17:16, 3 December 2024)
- ML20217K448 + (13:17:16, 3 December 2024)
- ML20217K445 + (13:17:17, 3 December 2024)
- ML20217K446 + (13:17:17, 3 December 2024)
- ML20217K442 + (13:17:18, 3 December 2024)
- ML20217K443 + (13:17:18, 3 December 2024)
- ML20217K440 + (13:17:19, 3 December 2024)
- ML20217K439 + (13:17:20, 3 December 2024)
- NRC-97-0077, Forwards Copy of Application for Coverage of Storm Water Discharges from Construction Activity Under Rule 323.2190 of Mi Administrative Code.Permit Required for Repaving Existing Roadways & Parking Areas at Plant + (13:17:24, 3 December 2024)
- ML20217K435 + (13:17:25, 3 December 2024)
- ML20217K430 + (13:17:29, 3 December 2024)
- ML20217K429 + (13:17:29, 3 December 2024)
- ML20217K427 + (13:17:30, 3 December 2024)
- ML20217K428 + (13:17:30, 3 December 2024)
- ML20217K426 + (13:17:31, 3 December 2024)
- ML20217K420 + (13:17:32, 3 December 2024)
- ML20217K421 + (13:17:32, 3 December 2024)
- ML20217K419 + (13:17:33, 3 December 2024)
- ML20217K416 + (13:17:33, 3 December 2024)
- ML20217K414 + (13:17:34, 3 December 2024)
- ML20217K415 + (13:17:34, 3 December 2024)
- ML20217K411 + (13:17:35, 3 December 2024)
- ML20217K408 + (13:17:36, 3 December 2024)
- ML20217K407 + (13:17:37, 3 December 2024)
- ML20217K406 + (13:17:38, 3 December 2024)
- ML20217K405 + (13:17:38, 3 December 2024)
- ML20217K402 + (13:17:39, 3 December 2024)
- ML20217K404 + (13:17:39, 3 December 2024)
- ML20217K401 + (13:17:40, 3 December 2024)
- VPN-068-97, NPDES Noncompliance Notification:On 970906,pH Lower Limit of 6.0 at Discharge & Dilution Structure Was Exceeded.Caused by Workers Rinsing Sodium Bisulfite Barrels Into Outfall.Wrote Procedure to Require Barrel Rinsing Into Floor Drain Sys + (13:17:41, 3 December 2024)
- BECO-LTR-97-106, Forwards Rept of Changes,Tests & Experiments for Period 960101-970421.Second Ltr to Be Submitted by 971107, Containing Changes Not Readily Summarized for Appropriate Inclusion in Rept Due to Administrative Oversight + (13:17:43, 3 December 2024)
- ML20217K398 + (13:17:43, 3 December 2024)