Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000458/LER-1987-018, :on 870901,discovered That Two Chemical Properties of Diesel Fuel Oil Shipment to Plant Did Not Meet Acceptable Criteria,Per Tech Specs.Fuel Oil Analysis Entered Into Surveillance Test Procedure Program + (10:11:04, 3 December 2024)
- ML20235J865 + (10:11:04, 3 December 2024)
- ML20235J864 + (10:11:05, 3 December 2024)
- ML20235J863 + (10:11:06, 3 December 2024)
- ML20235J862 + (10:11:07, 3 December 2024)
- ML20235J859 + (10:11:08, 3 December 2024)
- ML20235J854 + (10:11:08, 3 December 2024)
- ML20235J852 + (10:11:09, 3 December 2024)
- ML20235J853 + (10:11:09, 3 December 2024)
- ML20235J850 + (10:11:10, 3 December 2024)
- ML20235J849 + (10:11:11, 3 December 2024)
- ML20235J848 + (10:11:12, 3 December 2024)
- ML20235J847 + (10:11:12, 3 December 2024)
- ML20235J845 + (10:11:13, 3 December 2024)
- ML20235J844 + (10:11:14, 3 December 2024)
- ML20235J842 + (10:11:14, 3 December 2024)
- 3F0987-19, Responds to Violations Noted in Insp Rept 50-302/87-19. Corrective Actions:Calibr of Reactor Protection Sys Revised to Incorporate Setpoints of 50 & 60 Psig for Main Turbine Control & Main Feedwater Control Oil Pressure,Respectively + (10:11:15, 3 December 2024)
- ML20235J838 + (10:11:15, 3 December 2024)
- ML20235J836 + (10:11:16, 3 December 2024)
- ML20235J835 + (10:11:17, 3 December 2024)
- ML20235J834 + (10:11:17, 3 December 2024)
- ST-HL-AE-2369, Second Interim Deficiency & Part 21 Rept Re Cooling of Unit 1 High Voltage Cubicle Panels for Standby Diesel Generators.Initially Reported on 870729.Util Completed Design Mod to Provide Addl Cooling.Next Rept by 871130 + (10:11:18, 3 December 2024)
- ML20235J828 + (10:11:19, 3 December 2024)
- ML20235J824 + (10:11:20, 3 December 2024)
- ML20235J825 + (10:11:20, 3 December 2024)
- ML20235J822 + (10:11:21, 3 December 2024)
- ML20235J821 + (10:11:22, 3 December 2024)
- ML20235J819 + (10:11:22, 3 December 2024)
- ML20235J816 + (10:11:23, 3 December 2024)
- ML20235J817 + (10:11:23, 3 December 2024)
- ML20235J814 + (10:11:24, 3 December 2024)
- ML20235J810 + (10:11:25, 3 December 2024)
- ML20235J807 + (10:11:25, 3 December 2024)
- ML20235J804 + (10:11:26, 3 December 2024)
- ML20235J803 + (10:11:27, 3 December 2024)
- ML20235J800 + (10:11:28, 3 December 2024)
- 05000333/LER-1987-009, :on 870611,automatic Initiation of Emergency Bus Degraded Voltage Protection Sys Occurred.Caused by Personnel Error.Steps Taken to Increase Operator Awareness of Degraded Voltage Sys Setpoints + (10:11:29, 3 December 2024)
- 05000254/LER-1987-011-07, :on 870612,embedment Plate W/Rhr Sys Pipe Support Attachments Loaded Beyond FSAR Design Limits.Caused by Improper Anchor Strap Spacing Due to Misinterpretation of Design Drawings During Fabrication + (10:11:56, 3 December 2024)
- ML20235J795 + (10:11:57, 3 December 2024)
- ML20235J793 + (10:11:57, 3 December 2024)
- 05000344/LER-1987-013, :on 870512,safety Injection Accumulator Fill Line a Ruptured.Caused by backflow-induced Vibration in Diaphragm Valve A.Fill Line & Diaphragm Valve Replaced. Operating Procedures Revised + (10:11:59, 3 December 2024)
- ML20235J790 + (10:11:59, 3 December 2024)
- ML20235J788 + (10:12:00, 3 December 2024)
- ML20235J786 + (10:12:00, 3 December 2024)
- ML20235J783 + (10:12:01, 3 December 2024)
- ML20235J784 + (10:12:01, 3 December 2024)
- ML20235J782 + (10:12:02, 3 December 2024)
- ML20235J780 + (10:12:03, 3 December 2024)
- ML20235J781 + (10:12:03, 3 December 2024)
- ML20235J778 + (10:12:04, 3 December 2024)
- ML20235J777 + (10:12:04, 3 December 2024)