- 05000277/LER-1987-019-01, :on 870904,shutdowm Cooling Isolation & RHR Pump Trip Occurred Whem RHR a Logic Temporarily de- Energized.Caused by Loose Connection at Fuse Terminal.Lead at Fuse Tightened & Isolation Signal Reset + (09:19:03, 3 December 2024)
- ML20235T167 + (09:19:04, 3 December 2024)
- 05000413/LER-1987-022, :on 870610,Type B Leak Rate Tests of Conax Electrical Penetration Assemblies Not Performed Per Tech Specs.Caused by Defective Procedure.Test Conducted & Results Acceptable.Procedure Will Be Rewritten + (09:19:05, 3 December 2024)
- ML20235T164 + (09:19:06, 3 December 2024)
- ML20235T160 + (09:19:07, 3 December 2024)
- ML20235T161 + (09:19:07, 3 December 2024)
- ML20235T155 + (09:19:08, 3 December 2024)
- TXX-6566, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 870411. Field Weld Analysis Completed & Currently Under Engineering Evaluation.Next Rept Will Be Submitted by 870930 + (09:19:08, 3 December 2024)
- 05000382/LER-1989-003, :on 890204,operators Inadvertently Allowed LPSI Pump B to Start During Testing.Caused by Personnel Error.Personnel Responsible Counseled to Be More Cautious & Thorough Approach When Following Procedures + (09:19:10, 3 December 2024)
- ML20235T151 + (09:19:10, 3 December 2024)
- ML20235T139 + (09:19:12, 3 December 2024)
- ML20235T142 + (09:19:12, 3 December 2024)
- ML20235T136 + (09:19:13, 3 December 2024)
- ML20235T133 + (09:19:14, 3 December 2024)
- 05000271/LER-1988-015, :on 881214,discovered That Penetration of Reactor Bldg West Wall Vital Fire Barrier Was Not Fire Rated Assembly.Inadequate Analysis Cause of Event.Continuous Fire Watch Immediately Established + (09:19:15, 3 December 2024)
- ML20235T124 + (09:19:16, 3 December 2024)
- ML20235T120 + (09:19:17, 3 December 2024)
- ML20235T123 + (09:19:17, 3 December 2024)
- IR 05000412/1987046 + (09:19:18, 3 December 2024)
- ML20235T118 + (09:19:19, 3 December 2024)
- ML20235T115 + (09:19:20, 3 December 2024)
- ML20235T116 + (09:19:20, 3 December 2024)
- ML20235T110 + (09:19:21, 3 December 2024)
- ML20235T108 + (09:19:22, 3 December 2024)
- 05000278/LER-1987-007-02, :on 870829,HPCI Rendered Inoperable Due to Loss of Instrument Power.Caused by Deteriorated Relay Coil.Relay Replaced & Added to Preventive Maint Program to Be Replaced on 6-yr Interval + (09:19:24, 3 December 2024)
- 05000304/LER-1989-003-01, :on 890131,operator Received Rod Urgent Failure Alarms While Attempting to Withdraw Control Rod Bank C. Caused by Both Cognitive & Procedural Personnel Error.Card Replaced & Unit Brought Critical + (09:19:26, 3 December 2024)
- ML20235T097 + (09:19:27, 3 December 2024)
- ML20235T092 + (09:19:28, 3 December 2024)
- ML20235T091 + (09:19:28, 3 December 2024)
- 05000370/LER-1987-007-04, :on 870609,during Insp,Inoperable Auxiliary Bldg Fire Barrier Discovered.Caused by Const/Installation Deficiency Due to Wall Section Constructed W/O Proper Joint Treatment.Wall Section Repaired + (09:19:30, 3 December 2024)
- ML20235T085 + (09:19:31, 3 December 2024)
- IR 05000344/1989003 + (09:19:32, 3 December 2024)
- ML20235T075 + (09:19:34, 3 December 2024)
- TXX-6811, Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys.Initially Reported on 870602.Valves Needed to Complete Installation Scheduled to Be Delivered in Oct 1987.Next Rept Expected by 880113 + (09:19:34, 3 December 2024)
- ML20235T069 + (09:19:35, 3 December 2024)
- ML20235T070 + (09:19:35, 3 December 2024)
- ML20235T068 + (09:19:36, 3 December 2024)
- ML20235T063 + (09:19:37, 3 December 2024)
- ML20235T064 + (09:19:37, 3 December 2024)
- ML20235T059 + (09:19:38, 3 December 2024)
- ML20235T050 + (09:19:46, 3 December 2024)
- IR 05000425/1989009 + (09:19:47, 3 December 2024)
- 05000364/LER-1987-002-01, :on 870903,determined That Train a & B Svc Water Battery Changer Room Coolers Water Supplies Crossed. Caused by Design Error.Design Change Will Be Implemented & Completed During Refueling Outage in Oct 1987 + (09:19:49, 3 December 2024)
- ML20235T041 + (09:19:50, 3 December 2024)
- ML20235T046 + (09:19:50, 3 December 2024)
- ML20235T039 + (09:19:51, 3 December 2024)
- ML20235T034 + (09:19:52, 3 December 2024)
- ML20235T030 + (09:19:53, 3 December 2024)
- 05000352/LER-1987-045, :on 870830,standby Gas Treatment Sys Initiated. Caused by Polyphase Fault to Ground on Unit 2 Load Ctr Transformer,Producing Low Voltage Condition on Unit 1 Instrument Panel.Transformer Returned to Mfg + (09:19:54, 3 December 2024)