Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000482/1992030 + (21:51:27, 25 May 2025)
- 05000278/LER-1979-021-03, /03X-1:on 790630,during Surveillance Testing,Main Steam Sample Line Inboard Isolation Valve Failed to Close. Probably Caused by Valve Packing Binding or Solenoid Valve Sticking While Valve Was at High Temp + (21:51:41, 25 May 2025)
- 05000315/LER-1982-003-04, /04X-1:on 820115,unplanned Gas Release Detected by Elevated Vent Stack Gaseous Monitor Reading.Cause Undetermined.Procedure for Helium Gas Test Changed to Allow One Portion of Waste Gas to Be Tested + (21:52:06, 25 May 2025)
- ML20125C227 + (21:53:47, 25 May 2025)
- IR 05000352/1992081 + (21:54:19, 25 May 2025)
- TAC:11094 + (21:55:23, 25 May 2025)
- IR 05000211/2003010 + (21:57:20, 25 May 2025)
- IR 05000263/1976005 + (21:58:29, 25 May 2025)
- IR 05000320/1979010 + (21:58:34, 25 May 2025)
- 05000317/LER-1979-061-01, /01X-0:on 791024,air Start Sys Hangers Failed to Meet Seismic Requirements Per IE Bulletin 79-14. Re-evaluation of Air Line for Seismic Support Requirements Underway + (21:58:45, 25 May 2025)
- 05000318/LER-1979-039-01, /01X-0:on 791024,air Start Sys Hangers Were Not Built to Meet Seismic Requirements.Cause Not Stated.Air Line Is Being re-evaluated Re Support Requirements for Seismic Qualification + (21:58:50, 25 May 2025)
- IR 05000369/1979020 + (21:59:23, 25 May 2025)
- 05000368/LER-1979-058-03, /03L-0 on 790724:as Result of Investigation Per IE Bulletin 79-02,seven Restraints Identified as Having Safety Factor Greater than Two.Method of Obtaining Bolt Loads Revised + (22:00:52, 25 May 2025)
- 05000324/LER-1979-057-03, /03L-0 on 790717:safety Relief Valve Lifted & Reset at 970 Lb for No Apparent Cause.Valve Solenoid & Operator Replaced.Supplemental Rept Will Be Issued When Results Received + (22:00:54, 25 May 2025)
- 05000324/LER-1979-057, Forwards LER 79-057/03L-0 + (22:00:58, 25 May 2025)
- ML20125A904 + (22:01:03, 25 May 2025)
- ML20125A741 + (22:01:46, 25 May 2025)
- Regulatory Guide 1.187 + (22:01:48, 25 May 2025)
- TAC:M80698 + (22:02:57, 25 May 2025)
- NRC-2020-0002, NRC-2020-000207, Request for the Analysis of the Three Mile Island - Unit 2 Accident, NSAC-80-1, Prepared by the Nuclear Safety Analysis Center, Revised March 1980 (Narrowed Scope) + (22:03:47, 25 May 2025)
- IR 05000424/2019012 + (22:04:08, 25 May 2025)
- ML20121A115 + (22:05:43, 25 May 2025)
- GO2-19-076, Submittal of 2019 Annual Environmental Operating Report + (22:05:49, 25 May 2025)
- ML20119A539 + (22:07:17, 25 May 2025)
- SECY-20-0018, Letter to the Honorable Nancy Pelosi, Speaker of the House, Et Al., from Chairman Svinicki, Provides the NRCs Report to Congress on Abnormal Occurrences: Fiscal Year 2019 + (22:07:35, 25 May 2025)
- EPID:L-2019-LLR-0086 + (22:07:39, 25 May 2025)
- 05000333/LER-1992-035, :on 920825,circuit Breaker Supplying Power to Load Ctr step-down Transformer Tripped,Resulting in ESF Actuation & Loss of Effluent Monitoring.Caused by Failure of Transformer T-13.Transformer Replaced W/Spare + (22:10:11, 25 May 2025)
- TAC:M56110 + (22:11:02, 25 May 2025)
- 05000336/LER-1992-015-01, :on 920821,determined That SPEC 200 Cabinets Mfg by Foxboro Co May Not Be Seismically Qualified as Result of Missing Bumpers.Caused by Lack of Vendor Instruction.Seismic Bumpers Ordered + (22:11:10, 25 May 2025)
- TAC:M65955 + (22:11:12, 25 May 2025)
- 05000331/LER-1992-013, :on 920817,automatic Reactor Scram Initiated Due to Perceived High Average power-range Neutron Flux Level.Caused by Noise Signal Which Affected Recirculation Flow Signals.Circuit Inductors Installed + (22:11:21, 25 May 2025)
- TAC:M80424 + (22:11:38, 25 May 2025)
- L-91-268, Advises That Util,In Cooperation W/State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Emergency Plan on 911204.Exercise Will Involve Participation by Local & State Emergency Response Personnel + (22:12:09, 25 May 2025)
- ML20117P943 + (22:12:19, 25 May 2025)
- TAC:64607 + (22:12:30, 25 May 2025)
- ML20117P431 + (22:12:53, 25 May 2025)
- ML20117P429 + (22:12:55, 25 May 2025)
- ML20117P408 + (22:12:57, 25 May 2025)
- ML20117P127 + (22:13:15, 25 May 2025)
- ML20117N069 + (22:14:23, 25 May 2025)
- ML20117N039 + (22:14:27, 25 May 2025)
- ML20117M999 + (22:14:34, 25 May 2025)
- 05000368/LER-1995-001, Provides Comments on Preliminary Accident Sequence Analysis Re LER 95-001-00 + (22:15:28, 25 May 2025)
- B130180, Surveillance Specimen Program Evaluation for River Bend Station + (22:18:21, 25 May 2025)
- ML20117G758 + (22:20:58, 25 May 2025)
- 05000302/LER-1996-012, :on 960411,declared Old Battery Chargers Outside Facility Design Basis & Inoperable.Caused by Failure of Mfg to Translate Util Requirements Into Mfg Test Program. Four Old Battery Chargers Replaced + (22:22:08, 25 May 2025)
- ML20117F397 + (22:22:36, 25 May 2025)
- ML20117F369 + (22:22:39, 25 May 2025)
- ML20117F029 + (22:23:04, 25 May 2025)
- 05000336/LER-1994-027-01, :on 940903,channel B Linear Range Ni Drawer Opened & Technicians Found Connector J6 Disconnected from Jack.Caused by Personnel Error.Reconnected HV Connector J6 & Ensured Proper Operation of Channel B + (22:23:25, 25 May 2025)
- ML20117D266 + (22:24:41, 25 May 2025)