- 05000254/LER-1998-021, :on 980918,weekly Position Verification of RB to Suppression Chamber Cv Vacuum Breakers Was Misinterpreted & Not Perfromed.Caused by Inadequate Development of Specification.Implemented Procedure Changes + (15:56:08, 24 May 2025)
- IR 05000361/1988013 + (15:56:29, 24 May 2025)
- ML20154N895 + (15:56:36, 24 May 2025)
- ML20154N799 + (15:57:01, 24 May 2025)
- 05000498/LER-1998-006, :on 980928,failure to Fully Meet TS SR 4.0.5 for Containment Isolation Check Valves Was Noted.Caused by Inadequate Change Mgt.Entered Into TS 3.6.3 & Tested Four Valves in Unit 2 + (15:57:03, 24 May 2025)
- 05000498/LER-1998-008, :on 980909,TS 3.0.3 Was Entered Due to Inoperable Rod Control Demand Step Counters.Caused by Inadequate Communication Between CR Staff & Maint Personnel.Detailed Discussions of Lessons Learned Held + (15:57:11, 24 May 2025)
- TAC:63043 + (15:58:11, 24 May 2025)
- ML20154N512 + (15:58:20, 24 May 2025)
- ML20154N455 + (15:58:34, 24 May 2025)
- ML20154N453 + (15:58:35, 24 May 2025)
- ML20154N437 + (15:58:39, 24 May 2025)
- ML20154N420 + (15:58:43, 24 May 2025)
- TAC:62264 + (15:59:08, 24 May 2025)
- IR 05000029/1988099 + (15:59:21, 24 May 2025)
- ML20154N252 + (15:59:44, 24 May 2025)
- ML20154N180 + (16:00:11, 24 May 2025)
- ML20154N145 + (16:00:20, 24 May 2025)
- ML20154N025 + (16:00:57, 24 May 2025)
- ML20154M923 + (16:01:30, 24 May 2025)
- ML20154M880 + (16:01:42, 24 May 2025)
- TAC:00022 + (16:03:06, 24 May 2025)
- ML20154M564 + (16:03:17, 24 May 2025)
- ML20154M547 + (16:03:24, 24 May 2025)
- L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO + (16:03:59, 24 May 2025)
- 05000413/LER-1998-015-01, Forwards LER 98-015-01, TS Required Shutdown & Operation Prohibited by TS Associated with Ice Condenser. Rev 0 to Ler,Dtd 980902,contained Abstract Since Event Investigation Had Not Been Completed.Rev 1 Contains All 10CFR50. + (16:04:10, 24 May 2025)
- ML20154M370 + (16:04:21, 24 May 2025)
- ML20154M364 + (16:04:23, 24 May 2025)
- ML20154M243 + (16:05:45, 24 May 2025)
- 05000423/LER-1998-038, :on 980915,manual Reactor Trip Was Initiated When Condensate Pump Discharge Conductivity Exceeded Limits Allowed by Ts.Caused by Failure of Implementing Procedure to Fully Address All Design Conditions.Revised Procedures + (16:06:03, 24 May 2025)
- ML20154M160 + (16:07:23, 24 May 2025)
- ML20154M087 + (16:07:47, 24 May 2025)
- ML20154M025 + (16:08:07, 24 May 2025)
- 05000423/LER-1998-037, :on 980910 & 18,both SE Trains Were Declared Inoperable Due to Failure of Cvs Associated with Injection of Sodium Hypochorite.Caused by Inadequate Work Practice. Sodium Hypochlorite Injection Point Was Isolated + (16:08:24, 24 May 2025)
- IR 05000315/1997017 + (16:08:32, 24 May 2025)
- 05000424/LER-1998-001-02, Forwards LER 98-001-02 Re Discovery of Concrete Degradation in DG Exhaust Stacks.Completion Date for Implementation of New Design Is Being Changed from 981015 to 1115 Due to Design & Installation Problems + (16:08:45, 24 May 2025)
- 05000498/LER-1998-007, :on 980915,failure to Perform Quarterly Surveillance of Td Afp.Caused by Inadequate on-shift Surveillance Test Preparation.Checklist Was Developed for Surveillance Preparation,Performance & Review Requirements + (16:08:53, 24 May 2025)
- ML20154L797 + (16:09:09, 24 May 2025)
- ML20154L755 + (16:09:26, 24 May 2025)
- ML20154L705 + (16:09:44, 24 May 2025)
- 05000266/LER-1998-026, :on 980914,determined That Operation of Potential Dilution in Progress Alarm Was Not Controlled IAW Ts.Caused by Failure to Address Plant Heatup Procedures. Revised Procedure OP-1A, Cold Shutdown to Hot Shutdown + (16:11:02, 24 May 2025)
- ML20154L422 + (16:11:30, 24 May 2025)
- ML20154L410 + (16:11:33, 24 May 2025)
- ML20154L406 + (16:11:36, 24 May 2025)
- ML20154L395 + (16:11:39, 24 May 2025)
- L-98-198, Requests Withdrawal of LARs 242 & 113 Which Were Submitted on 970310,to Allow Use of Framatome SG Sleeving Methodology on Permanent Basis + (16:11:49, 24 May 2025)
- TAC:MA3711 + (16:12:15, 24 May 2025)
- ML20154L232 + (16:12:29, 24 May 2025)
- ML20154L175 + (16:13:01, 24 May 2025)
- ML20154L161 + (16:13:05, 24 May 2025)
- 05000361/LER-1998-018, :on 980909,ECCS Was Inoperable Due to Inadequate Surveillance Test.Cause Was Not Determined Due to Length of Time.Ts SR 3.0.3,required Surveillance Tests Were Successfully Completed + (16:13:06, 24 May 2025)
- IR 05000298/1988200 + (16:13:52, 24 May 2025)