Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J669 + (11:40:18, 24 May 2025)
- ML20196J637 + (11:40:27, 24 May 2025)
- TAC:M93467 + (11:40:51, 24 May 2025)
- TAC:MA0578 + (11:40:53, 24 May 2025)
- TAC:62259 + (11:41:04, 24 May 2025)
- 05000423/LER-1997-037, :on 970516,discovered That RHR Sys Testing During Transition to Mode 4 Incorrectly Used RHR One Hour out-of-service Allowance.Caused by Improper Interpretation Contained in Ts.Submitted TS Change Request + (11:42:15, 24 May 2025)
- ML20196J190 + (11:42:38, 24 May 2025)
- ML20196J163 + (11:42:46, 24 May 2025)
- ML20196J145 + (11:43:57, 24 May 2025)
- ML20196J120 + (11:44:02, 24 May 2025)
- 05000382/LER-1998-019, :on 980920,failure of Containment Isolation Valves to Close During Testing Was Noted.Caused by Solenoid Failures.Solenoids Were Replaced & Valves Were Retested Successfully + (11:44:09, 24 May 2025)
- ML20196J067 + (11:44:19, 24 May 2025)
- TAC:MA4004 + (11:44:26, 24 May 2025)
- 05000254/LER-1998-025, :on 981102,HPCIS Pci Check Valve Failed.Caused by Corrosion in Valve Body.Revised Check Valve Insp Procedures to Add Corrosion Repair Criteria + (11:44:45, 24 May 2025)
- 05000289/LER-1997-007, :on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced + (11:46:03, 24 May 2025)
- TAC:62801 + (11:47:25, 24 May 2025)
- ML20196H588 + (11:47:30, 24 May 2025)
- ML20196H517 + (11:47:51, 24 May 2025)
- ML20196H501 + (11:47:54, 24 May 2025)
- TAC:M99019 + (11:48:11, 24 May 2025)
- ML20196H413 + (11:48:15, 24 May 2025)
- TAC:10754 + (11:48:19, 24 May 2025)
- 05000333/LER-1999-003-01, Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER + (11:48:26, 24 May 2025)
- ML20196H295 + (11:48:49, 24 May 2025)
- 05000245/LER-1997-013, :on 970217,discovered That Weight of Lower Mast Sections of Refueling Platform Fuel Grapple Were Not Added to Fuel Assembly Weight.Caused by Failure to Maintain Design Basis.Performed New Impact Load Analysis.With + (11:49:08, 24 May 2025)
- ML20196H117 + (11:49:38, 24 May 2025)
- ML20196G924 + (11:50:29, 24 May 2025)
- ML20196G912 + (11:50:35, 24 May 2025)
- TAC:M94651 + (11:50:36, 24 May 2025)
- TAC:53693 + (11:50:39, 24 May 2025)
- 05000265/LER-1997-001-01, :on 970227,initiation of High Pressure Coolant Injection Occurred Due to Deficient Procedures.Will Revise Surveillance Procedures,Will Review Prerequisites of All Im Procedures & Will Communicate Mgt Expectations to Personne + (11:51:03, 24 May 2025)
- ML20196G721 + (11:51:38, 24 May 2025)
- 05000382/LER-1997-011, :on 970321,containment Spray Water Was Less than Required by TS Due to Instrument Uncertainty.Indicated Water Level in CS Riser B Was Raised to 191 Feet + (11:51:45, 24 May 2025)
- 05000498/LER-1999-005, :on 990519,auxiliary FW Train D Was Noted Inoperable for Greater than 72 H TS Limit.Caused by Less than Adequate Work Instructions.Revised Associated Procedures + (11:51:52, 24 May 2025)
- 05000336/LER-1999-009, :on 990525,manual RT Due to Steam Leak in Turbine Bldg Was Noted.Caused by Inadequate Controls.Refined Controls for Adjusting FW Heater String Controls + (11:51:56, 24 May 2025)
- ML20196G516 + (11:52:40, 24 May 2025)
- ML20196G491 + (11:52:49, 24 May 2025)
- NUREG-1338, Responds to Ltr to Wd Travers, Re Small,Modular, pebble-bed Reactor Design.Some Background Info & Guidance on Licensing gas-cooled Reactor Designs Can Be Found in NRC Staff repts;NUREG-1226,NUREG-1338 & NUREG-1512 + (11:53:14, 24 May 2025)
- ML20196G402 + (11:53:24, 24 May 2025)
- TAC:MA0555 + (11:54:28, 24 May 2025)
- IR 05000220/1999004 + (11:55:50, 24 May 2025)
- TAC:M93436 + (11:56:38, 24 May 2025)
- TAC:MA1845 + (11:57:00, 24 May 2025)
- 05000289/LER-1999-006, :on 990525,inability of Pressurizer Support Bolts to Meet FSAR Requirements,Was Determined.Cause Not Identified.Performed Operability Review & Determined That Pressurizer Would Remain Operable Under Design Conditions + (11:57:02, 24 May 2025)
- TAC:MA5059 + (11:57:37, 24 May 2025)
- L-99-080, Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.709 + (11:58:02, 24 May 2025)
- ML20196F606 + (11:58:22, 24 May 2025)
- ML20196F546 + (11:58:39, 24 May 2025)
- 05000412/LER-1988-002, :on 880127,reactor Tripped & Control Room Emergency Bottled Air Pressurization Sys Actuation Occurred. Caused by Reactor Coolant Pump 21A Trip on Undervoltage Due to Loss of Bus 2A.Transmitter Calibr + (12:00:35, 24 May 2025)
- 05000317/LER-1988-010, :on 880628,containment Personnel Air Lock Interlock Discovered Inoperable During Performance of Surveillance Test Procedure.Caused by Improper Use of Procedure W/Lack of Clarity.Training Provided + (12:01:13, 24 May 2025)