Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000382/1997026 + (07:43:51, 24 May 2025)
- IR 05000424/1985060 + (07:43:59, 24 May 2025)
- TAC:MA3672 + (07:44:00, 24 May 2025)
- 05000373/LER-1997-039, :on 971024,unanalyzed Condition While Removing Ms SRV Was Noted.Caused by Inadequate Procedural Guidance. Analyzed Tailpipe Restraints Including Seismic Loads + (07:44:16, 24 May 2025)
- 05000313/LER-1998-005-03, :on 981225,two Manual RTs & Manual Actuations of EFWS Due to Reduced CW Flow to Mc.Caused by Large Intrusions of Fish Exceeding Removal Capability of Traveling Screen.Increased Fish Removal Capability.With + (07:44:22, 24 May 2025)
- ML20199L128 + (07:47:27, 24 May 2025)
- ML20199L115 + (07:47:33, 24 May 2025)
- AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid + (07:47:38, 24 May 2025)
- B12020, Summary of Results of Haddam Neck Probabilistic Safety Study + (07:47:48, 24 May 2025)
- ML20199L020 + (07:48:05, 24 May 2025)
- IR 05000271/1986008 + (07:48:31, 24 May 2025)
- IR 05000321/1986002 + (07:48:44, 24 May 2025)
- 05000423/LER-1997-009-01, Forwards LER 97-009-01,documenting Condition Originally Determined Reportable at Unit 3 on 970123.Util Commitments in Response to Event Contained within Attachment 1 to Ltr + (07:49:12, 24 May 2025)
- PY-CEI-NRR-2338, Responds to NRC Re Violations Noted in Insp Rept 50-440/97-07 on 970503-0623.Corrective Actions:Supervisor Stopped Job & Documented Error W/Potential Issue Form + (07:49:18, 24 May 2025)
- 05000302/LER-1998-001, :on 980104,SSCs Were Not Protected from Dynamic Effects of Loca.Caused by Failure to Fully Satisfy Design Criteria as Described in FSAR for Dynamic Effects of LOCA Inside Containment.Completed Jco for Targets + (07:49:30, 24 May 2025)
- IR 05000327/1997013 + (07:49:34, 24 May 2025)
- IR 05000382/1997027 + (07:49:45, 24 May 2025)
- ML20199K791 + (07:49:59, 24 May 2025)
- 05000255/LER-1998-011, :on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Were Noted.Caused by Inadequate Design Change Process.Exemption from 10CFR50,App R Was Pursued + (07:50:01, 24 May 2025)
- ML20199K718 + (07:50:22, 24 May 2025)
- 05000260/LER-1986-008-02, :on 860606,secondary Containment Isolation & Initiation of Control Emergency Ventilation Sys Occurred When Isolation Sys Power Fuse Blew.Caused by Exposed Wire on Junction Box.Fuse & Wire Repaired + (07:51:06, 24 May 2025)
- ML20199K578 + (07:51:19, 24 May 2025)
- 05000498/LER-1997-009-02, Forwards LER 97-009-02 Re MSSV Setpoints Found Outside Required Tolerances.Commitments Made in Original Licensee Event Rept Revised as Indicated in Corrective Action Section of Attachment to Ltr + (07:51:20, 24 May 2025)
- 05000423/LER-1986-038, :on 860605,penetration Through Main Steam Valve Bldg Supplementary Leak Collection & Release Sys Pressure Boundary Found Open to Atmosphere.Caused by Removal of Seal for Cable in Nov 1985.Penetration Sealed + (07:51:22, 24 May 2025)
- ML20199K468 + (07:51:59, 24 May 2025)
- ML20199K341 + (07:52:37, 24 May 2025)
- IR 05000482/1997019 + (07:52:48, 24 May 2025)
- 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted + (07:53:00, 24 May 2025)
- 05000304/LER-1997-006-07, :on 971028,informed of Potential to Exceed 10CFR50.46 ECCS Acceptance Criteria.Caused by Fuel Clad Gap re-opening & 17% Maximum Cladding Oxidation Limit.Performed Conservative Corrosion Calculations + (07:53:06, 24 May 2025)
- IR 05000461/1997011 + (07:53:32, 24 May 2025)
- ML20199K175 + (07:53:39, 24 May 2025)
- IR 05000295/1997012 + (07:53:46, 24 May 2025)
- ML20199K133 + (07:53:54, 24 May 2025)
- IR 05000373/1997003 + (07:53:56, 24 May 2025)
- ML20199K115 + (07:54:00, 24 May 2025)
- ML20199K057 + (07:54:13, 24 May 2025)
- 05000316/LER-1986-019, :on 860605,during Mode 5,fire Insp Missed on Inoperable Fire Door 470.Caused by Personnel Error.Action Initiated to Restore Identification Numbers to Appropriate Plant Door & Personnel Counseled + (07:54:23, 24 May 2025)
- 05000266/LER-1997-040-01, Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,Encl + (07:54:35, 24 May 2025)
- ML20199J997 + (07:54:39, 24 May 2025)
- ML20199J962 + (07:54:47, 24 May 2025)
- NUREG-0979, Forwards Sser 5,(NUREG-0979).W/o Encl + (07:56:07, 24 May 2025)
- 05000482/LER-1986-073, :on 860102,leak Rate Testing of Containment H Purge Sys Was Not Performed IAW All Requirements of TS 3.6.1.7.Cause Identified as Mindset.Revised Procedure & SAR Changes + (07:56:28, 24 May 2025)
- 05000483/LER-1986-019, :on 860606,during Mode 1,reactor Trip Occurred on Low Pressurizer Pressure.Caused by Technician Deviation from Calibr Procedure.Progressive Discipline Administered. Guidelines Given to Technicians + (07:56:38, 24 May 2025)
- 05000334/LER-1998-029, :on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With + (07:56:40, 24 May 2025)
- ML20199J687 + (07:56:42, 24 May 2025)
- 05000416/LER-1986-020, :on 860603,discovered That Nonqualified Relay Could Cause Loss of Standby Gas Treatment Sys Safety Function During Accidents.Caused by Approved Design.Circuit Design Will Be Modified to Bypass Fan Contact + (07:56:48, 24 May 2025)
- ML20199J559 + (07:57:17, 24 May 2025)
- IR 05000298/1986012 + (07:57:23, 24 May 2025)
- 05000282/LER-1997-013, :on 971018,inoperability of AFW & Entry Into TS 3.0.C Was Noted Due to AFW Manual Start During Planned & Orderly Shutdown.Lar Will Be Prepared + (07:57:42, 24 May 2025)
- ML20199J446 + (07:57:50, 24 May 2025)
- ML20199J432 + (07:57:54, 24 May 2025)