Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000369/1988024 + (04:11:27, 24 May 2025)
- TXX-8871, Summarizes Relatively More Detailed Descriptions of Amend 74 to Fsar.Page by Page Detailed Description of Changes Encl + (04:11:40, 24 May 2025)
- IR 05000298/1998022 + (04:13:14, 24 May 2025)
- ML20204H988 + (04:13:22, 24 May 2025)
- ML20204H973 + (04:13:27, 24 May 2025)
- IR 05000458/1986013 + (04:13:30, 24 May 2025)
- ML20204H958 + (04:13:31, 24 May 2025)
- ML20204H945 + (04:13:34, 24 May 2025)
- ML20204H910 + (04:13:46, 24 May 2025)
- ML20204H907 + (04:13:48, 24 May 2025)
- ML20204H897 + (04:13:51, 24 May 2025)
- 05000293/LER-1987-004, :on 870218,dry Chemical Fire Suppression Sys of Piping Trench Below Emergency Diesel Generator Discovered Inoperable.Caused by Personnel Error.Work Prioritization Identification Requirements Reviewed + (04:13:58, 24 May 2025)
- ML20204H883 + (04:14:00, 24 May 2025)
- 05000387/LER-1983-087-03, /03X-1:on 830527,containment a H2/O2 Analyzers Found to Have Erratic Readings.Caused by Degradation of Pressure Control Valve & Sample Pump.Failed Components Replaced + (04:14:04, 24 May 2025)
- ML20204H867 + (04:14:08, 24 May 2025)
- ML20204H858 + (04:14:11, 24 May 2025)
- ML20204H856 + (04:14:13, 24 May 2025)
- ML20204H845 + (04:14:16, 24 May 2025)
- L-99-047, Provides 10CFR50.46 Rept of Changes or Errors in ECCS Evaluation Models.Current Schedule for Completion of re- Analyses for Both Large & Small Break LOCA Is June 2000 for Unit 2 & June 2001 for Unit 2 + (04:14:21, 24 May 2025)
- ML20204H800 + (04:14:31, 24 May 2025)
- ML20204H789 + (04:14:35, 24 May 2025)
- TAC:MA3520 + (04:15:22, 24 May 2025)
- ML20204H590 + (04:15:32, 24 May 2025)
- ML20204H516 + (04:15:54, 24 May 2025)
- IR 05000298/1986011 + (04:15:57, 24 May 2025)
- ML20204H494 + (04:16:00, 24 May 2025)
- ML20204H487 + (04:16:03, 24 May 2025)
- ML20204H486 + (04:16:05, 24 May 2025)
- ML20204H483 + (04:16:06, 24 May 2025)
- ML20204H481 + (04:16:07, 24 May 2025)
- ML20204H475 + (04:16:10, 24 May 2025)
- ML20204H470 + (04:16:13, 24 May 2025)
- ML20204H453 + (04:16:18, 24 May 2025)
- 05000277/LER-1986-016-01, :on 860709,HPCI Sys Declared Inoperable Due to Turbine Control Valve Not Opening Beyond 75%.Caused by Ground in EG-M Control Box.Box Replaced & Sys Returned to Svc + (04:16:43, 24 May 2025)
- ML20204H371 + (04:17:11, 24 May 2025)
- TAC:43042 + (04:17:12, 24 May 2025)
- IR 05000425/1988019 + (04:17:18, 24 May 2025)
- ML20204H311 + (04:17:25, 24 May 2025)
- IR 05000369/1988012 + (04:17:32, 24 May 2025)
- ML20204H255 + (04:17:39, 24 May 2025)
- ML20204H218 + (04:17:48, 24 May 2025)
- SNRC-1091, Responds to NRC Re Violations Noted in Insp Rept 50-322/84-31.Corrective Actions:Startup Test Procedures 14 & 15 Revised to Agree W/Sections 14.1.4.8.12 & 14.1.4.8.13 of Fsar,Rev 33,Sept 1984 + (04:18:10, 24 May 2025)
- 05000219/LER-1984-021, :on 840825,bolted Fault Occurred When Control Switch Closed Causing Trip of Pump & Flash Which Caused Sufficient Ground Current Flow to Trip Main 4160-volt Bus Breaker 1C.Caused by Personnel Error + (04:18:18, 24 May 2025)
- ML20204H108 + (04:18:28, 24 May 2025)
- ML20204H100 + (04:18:30, 24 May 2025)
- 05000361/LER-1984-056, :on 841002,failure of Vital Inverter 2Y002 Resulted in de-energization of Channel B 120-volt Ac Vital Bus.Caused by Diode Short in Power Supply.Power Supply Replaced & Tested + (04:18:34, 24 May 2025)
- 05000482/LER-1998-004-01, Forwards LER 98-004-01 Re Condition That Resulted in Nuclear Power Plant Being in Condition,Outside Design Basis of Plant.Attachment to Ltr Identifies Actions Committed to by Util in Encl LER + (04:19:28, 24 May 2025)
- TAC:MA1736 + (04:19:35, 24 May 2025)
- ML20204G958 + (04:19:38, 24 May 2025)
- TAC:55488 + (04:19:41, 24 May 2025)
- ML20204G904 + (04:19:52, 24 May 2025)