_

' M Mitig k

UNITED STATES g

Ij NUCLEAR REGULATORY COMMISSION

%, wgv[/

t WASHINGTON, D.C. 20d66-0001 ms 1

PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 218 License No. DPR-70 1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Public Service Electric & Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlant;c City Electric Company (the licensees) dated September 25,1996, as supplemented on October 29,1997, March 16,1998, and February 8,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter ';

D.

The issuance of this amendment will not be inimical to the common defense and security or to th9 health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Pa.151 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as irdicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility i

Operating License No. DPR-70 is hereby amended to read as follows:

9903290081 990323 PDR ADOCK 05000272 P

PDR 1

2-(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 218, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance to be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION h.

y=

Elinor G. Adensam, Director Projset Directorate 1-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Atachment: Changes to the Technical Specifications Date of issuance: &ch 23,1999 e

.-.n-,,

n

l

)

ATTACHMENT TO LICENSE AMENDMENT NO. 218 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:

Remove Paaes insert Paoes 3/4 8-3 3/4 8-3 3/4 8-4 3/4 8-4 3/4 8-5 3/4 8-5 3/4 8-5a 3/4 8-Sa B 3/4 8-1 B 3/4 8-1 i

1 l

t

.. _.=

~ ~. - _ _ _ _..

1 1

ELECTRICAL POWER SYSTEMS SURVEILIANCE REQUIREMENTS 4.8.1.1.1 Two physically independent A.C. circuits between the offsite transmission network and the onsite Class 1E distribution system (vital bus system) shall be:

a.

Determined OPERABLE at least once per 7 days by verifying correct breake alignments, power availability, and b.

Demonstrated OPERABLE at least once per le months during shutdown by transferring (manually and automatically) vital bus supply from one 13/4 kv transformer to the other 13/4 kv transformer.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in its day tank.

2.

Verifying the diesel generator starts from standby conditions

  • and achieves 2 3910 volts and 2 58.8 Hz in S 13 seconds, and subsequently achieves steady state voltage of 2 3910 and $ 4400 volts and frequency of 60 i 1.2 Hz.

Subsequently, verifying the generator is synchronized with voltage maintained 2 3910 and S 4580 volts, gradually loaded to 2500-2600 kw**,

and operates at a load of 2500-2600 kw for greater than or equal to 60 minutes.

3.

Verifying the diesel generator is aligned to provide standby power to the associated vital bus.

b.

At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to one hour by checking for and removing accumulated water from the day tanks, I

c.

At least once per 6 months by verifying the diesel generator starts from standby conditions

  • and achieves 2 3910 volts and 2 58.8 Hz in $ 13 seconds, and subsequently achieves steady state voltage of 2 3910 and S 4400 volts and frequency of 60 i 1.2 Hz.

The generator shall be synchronized to its emergency bus with voltage maintained 2 3910 and i 4580 volts, loaded to 2500-2600** kw in less than or equal to 60 seconds, and operate at a load of 2500-2600 kw for at least 60 minutes.

This test, if it'is performed so it coincides with the testing required by Surveillance Requirement 4.8.1.1.2.a.2, may also serve to concurrently meet those requirements.

2 J

SALEN - UNIT 1 3/4 8-3 Amendment No. 218

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS - (Continued) d.

At least once per 18 months during shutdown by:

1.

DELETED 2.

Verifying that-, on rejection of a load greater than or equal to 820 kw, the voltage and frequency are restored to 2 3910 and $ 4400 volts and 60 i 1.2 Hz within 4 seconds, and subsequently achieves a steady state frequency of 2 58.8 and $ 60.5 Hz.

3.

Simulating a loss of offsite power by itself, and:

a)

Verifying de-senergiaation of the vital bus and load shedding from the vital bus, b)

Verifying the diesel starts on the auto-start signal *,

energizes the vital bus with permaner.tly connected loads within 13 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization of these loads, the steady state voltage and frequency of the vital bus shall be maintained at 2 3910 and $ 4400 volts and 2 58.8 and $ 60.5 Hz during this test.

4.

Verifying that on an ESF actuation test signal without loss of offsite power the diesel generator starts on the auto-start signal and operates on standby for greater than or equal to 5 minutes *.

The diesel generator shall achieve 2 3910 volts and 2 58.8 Hz in

$ 13 seconds, and subsequently achieves steady state voltage of 2 3910 and $ 4400 volts and frequency of 2 58.8 and $ 60.5 Hz.

5.

Not Used.

6.

Simulating a loss of offsite power in conjunction with an ESF actuation test signal, and:

a)

Verifying'de-energization of the vital bus and load shedding from the vital bus.

b)

Verifying the dieswl starts on the auto-start signal *,

energizes the vital bus with permanently connected loads within 13 seconds, energises the auto-connected emergency (accident) loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After energisation of these loads, the steady state voltage and frequency of the vital bus shall be maintained at 2 3910 and $ 4400 volts and 2 58.8 and $ 60.5 Hz during this test.

SALEM - UNIT 1 3/4 8-4 Amendment No.210

. ~.

i s

l ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

=

c)

Verifying that all nonessential automatic diesel generator trips (i.e., other than engine overrpeed, lube oil pressure low, 4 KV bus differential and generator differential), are automatically bypassed upon loss of voltage on the vital bus concurrent with a safety injection actuation signal.

7.

Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to 2760-2860 kw.**

During the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to 2500-2600 kw**.

The steady state voltage and frequency shall be maintained at 2 3910 and l

$ 4580 volts and 60 i 1.2 Hz during this test.

j 8.

Verifying that the auto-connected loads to each diesel generator do not exceed the two hour rating of 2860 kw.

9.

Verifying that with the diesel generator operating in a test mode (connected to its bus), a simulated safety injection signal overrides the test mode by (1) returning the diesel generator to standby operation and (2) automatically energizing the emergency loads with offsite power.

e.

At least once per ten years or after any modifications which could affect diesel generator interdependence by starting all diesel generators simultaneously *, during shutdown, and verifying that all diesel generators accelerate to at least 58.8 Hz in less than or equal to 13 seconds.

f.

At least once per 18 months, the following test shall be performed within 5 minutes of diesel shutdown after the diesel has operated for at least two hours at 2500-2600 kw**:

Verifying the diesel generator starts and achieves 2 3910 volts and 2 58.0 Hz in s 13 seconds, and subsequently achieves steady state voltage of 2 M'.0 and 5 4400 volts and frequency of 60 i 1.2 Hz.

4.8.1.1.3 The diesel fuel oil storage and transfer system shall be demonstrated OPERABLE:

a.

At least once per 31 days by:

1.

Verifying the level in each of the above required fuel storage tanks.

2.

Verifying that both fuel transfer pumps can be started and transfer fuel from the fuel storage tanks to the day tanks.

SALEM - UNIT 1 3/4 8-5 Amendment No. 2IO

= -. -... - -..

_ _ _, -., -,. ~ ~ ~...

ELECTRICAI, PCMER SYSTEMS SURVEILIANCE REQUIREMENTS (Continued) b.

At least once per 92 days by verifying that a sample of diesel fuel from each of the above required fuel storage tanks is within the acceptable limits specified in Table 1 of ASTM D975-77 when checked for viscosity, water and sediment.

4.8.1.1.4 Reports - NOT USED l

l l

l l

i I

l l

Surveillance testing may be conducted in accordance with the manufacturer's recommendations regarding engine prelube, warm-up and f

loading (unless loading times are specified in the individual Surveillance Requirements).

)

This band is meant as guidance to preclude routine exceedances of the c'.iesel generator manufacturer's design ratines. Loads in excess of this band for special testing or momentary variations due to changing bus loads shall not invalidate the test.

SALEM - UNIT 1 3/4 8-Sa Amandaent No. 2I8 l

l l

. - - - - -.. - _ _ - ~ _ _. -

w-.=,,. -. - ~ ~ - -

l l

I 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.B.2 A.C.

SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C pc,wer sources and associated distribution systems during operation ensures that sufficient power will be i

available to supply the safety related equipment required for 1) the safe shutdown of the facility, and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident

]

analyses and are based upon maintaining at least two independent sets of onsite A.C. and D.C. power sources and associated distribution systems

)

OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systtas during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is availablir or monitoring and maintaining the unit status.

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are based upon. the recommendations of Regulatory Guide 1.9,

" Selection of Diesel Generator Set Capacity for Standby Power Supplies,"

March 10, 1971, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977. Regulatory Guide 1.108 criteria for determining and reporting valid tests and failures, and accelerated diesel generator testing, have been superseded by implementation of the Maintenance Rule for the diesel generators per 10CFR50.65.

In adda'. ion to the Surveillance Requirements of 4.8.1.1.2, diesel preventative maintenance is performed in accordance with procedures based on manufacturer's recommendations with consideration given to operating experience.

The minimum voltage and frequency stated in the Surveillance Requirements (SR) are those necessary to ensure the Emergency Diesel Generator (EDG) can accept Design Basis Accident (DBA) loading while maintaining acceptable voltage and frequency levels. Stable operation at the nominal voltage and frequency values is also essential'in esteb11shing EDG OPERABILITY, but a time constraint is not imposed. The lack of a time constraint is based on the fact that a typical EDG will experience a period of voltage and frequency oscillations prior to reaching steady state operation if these oscillations l

are not dampened out by load application.

In lieu of a time constraint in the SR, controls will be provided to monitor and trend the actual time to reach

- stable operation within the band as a means of ensuring there is no voltage regulator or governor degradation that could cause an EDG to become inoperable.

B 3/4 8-1 Amendment No. M SALEM - UNIT 1 t

. ~.,.

..i

.. ~..,

,y-,

_-m

_m.___

__.._7._..

t 3/4.8 ELECTRICAL POWER SYSTEMS BASES (Continued)

' Standby condition" for the purpose of defining the condition of the engine immediately prior to starting for surveillance requirements requires that the lube oil temperature be between 100 *F and 170 'F.

The minimum lube oil temperature for an OPERABLE diesel. is 100 "F.

The thirteen second time requirement for the Emergency Diesel Generator to reach rated voltage and frequency was originally based on a Westinghouse j

asst.mption of fifteen seconds that included the delay time between the

{

occurrence of the incident and the application of electrical power to the j

first sequenced safeguards pump (BURL-3011, dated November 13, 1974) and included an instrument response time of two seconds (BURI.-1531, dated July 27, 1970). The times specified in UFSAR Section 15.4 bound the thirteen seconda specified in the TS.

I The narrower band for frequency specified for testing performed in steady

' state isochronous operation will ensure the EDG will not be run in an overloaded condition (steady state) during accident conditions. Steady state is assumed to be achieved after one minute of operation in the isochronous

]

mode with all required loads sequenced on the bus.

e,

~

The narrower band for steady state voltage is specified for operation when the EDG is not synchronized to the grid to ensure the voltage regulator will protect driven equipment from over-voltages during accident conditions.

Procedural controls will ensure that equipment voltages are maintained within acceptable limits during testing when paralleled to the grid.

1 The wider band for frequency is appropriate for testing done with the governor i

- in the droop mode. Likewise the wider band for voltage is appropriate when paralleled to the grid.

All voltages and frequencies specified in SR 4.8.1.1.2 are representative of i

the analytical values and do not account for postulated instrument inaccuracy.

j Instrument inaccuracies for EDG voltage and frequency are administratively j

controlled.

l Preventive maintenance includes those activities (including pre-test inspections, measurements, adjustments and preparations) performed to maintain an otherwise CPERABLE EDG in an OPERABLE status. Corrective maintenance includes those activities required to correct a condition that would cause the EDG to be inoperable.

S surveillance requirement 4.8.1.2 is modified by a Note. The reason for the Note is to preclude requiring the OPERABLE DG(s) from being paralleled with the offsite power network or otherwise rendered inoperable during performance i

of the surveillance requirement, and to preclude de-energizing a required ESF j

bus or disconnecting a required offsite circuit during performance of j

surveillance requirements. With limited AC sources available, a single event could compromise both the required circuit and the DG.

It is the intent that l

SALEM - UNIT 1 8 3/4 8-la Amendment No. 218 i

  • p ert g k

UNITED STATES g

s j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30686 0001

\\...../

PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC C!TY ELECTRIC COMPANY DOCKET NO. 50 311 SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 200 License No. DPR-75 1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Public Service Electric & Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated September 25,1996, as supplemented on October 29,1997, March 16,1998, and February 8,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissien's regulations and all applicable requirements have been satisfied.

2.

Accordin0ly, tho license is amended by changes to the Technical Specifications as indicated in the attachment to this fcense amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:

- (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 200, ere hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Spscifications.

3.

This license amendment is effective as of its date of issuance to be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION tw E-Elinor G. Adensam, Director Project Directorate 1-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Techr.: cal Specifications Date of issuance: March 23,1999

ATTACHMENT TO LICENSE AMENDMENT NO. 200 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:

Remove Paaes jn.s,ert Paaes n

W4 &3 N4 &3 3/4 8-4 3/4 8-4 3/4 8-5 3/4 8-5 3/4 8-6 3/4 8-6 B 3/4 8-1 B 3/4 8-1 i

i ELECTRICAL POWER SYSTEMS SURVEILIANCE REQUIREMENTS 4.8.1.1.1 Two physically independent A.C. circuits between the offsite transmission network and the onsite Class 1E distribution system (vital bus system) shall be:

a.

Determined OPERABLE at least once per 7 days by verifying correct breaker alignments, power availability, and b.

Demonstrated OPERABLE at least once per 18 months during ahutdown by transferring (manually and automatically) vital bus supply from one 13/4 kv transformer to the other 13/4 kv transformer.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLEt a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in its day tank.

2.

Veritying the diesel generator starts from standby conditions

  • and achieves 2 3910 volts and 2 58.8 Hz in $ 13 seconds, and subsequently achieves steady state voltage of 2 3910 and $ 4400 volts and frequency of 60 i 1,2 Hz.

Subsequently, verifying the generator.is synchronized with voltage maintained 2 3910 and $ 4500 volts, gradually loaded to 2500-2600 kw**,

and operates at a load of 2500-2600 kw for greater than or

]

equal to 60 minutes.

3.

Verifying the diesel generator is aligned to provide standby power to the associated vital bus.

b.

At least once per 31 days and after each e 'eration of the diesel where the period of operation was greater than s wrual to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by checking o

for and removing accumulated water from the day tanks.

c.

At least once per 6 months by verifying the diesel generator starts from standby conditions

  • and achieves 2 3910 volts and 2 58.8 Hz in $ 13 seconds, and subsequently achieves steady state voltage of 2 3910 and S 4400 volts and frequency of 60 i 1.2 Hz.

l The generator shall be synchronized to its emergency bus with voltage maintained 2 3910 and $ 4580 volts, loaded to 2500-2600** kw in less than or equal to 60 seconds, and operate at a load of 2500-2600 kw for at leas'. 60 minutes.

This test, if it is performed so it coincides with the testing required I

by Surveillance Requirement 4.8.1.1.2.a.2, may also serve to concurrently meet those requirements.

A l

SALEM - UNIT 2 3/4 8-3 Amendment No. E 4

e

_. _.- _ _ _ _. ~... _ _.. _. _.. _ _ _... _ _ _ _ _.. _ _.. _. - _ _ _ _,

...mm._

l 4

l l

ELECTRICAL POWER SYSTEMS SURVEILIANCE REQUIREMENTS (Continued) l t

d.

At least once per 18 months during shutdown by:

1.

DELETED 2.

Verifying that, on rejection of a load greater than or equal to 820 kw, the voltage and frequency are restored to 2 3910 and $ 4400 volts and 60 i 1.2 Hz within 4 seconds, and subsequently achieves a steady state frequency of 2 58.8 and $ 60.5 Hz.

3.

Simulating a loss of offsite poier by itself, and:

a)

Verifying de-energization of the vital bus and load shedding from the vital bus, b)

Verifying the diesel starts on the auto-start signal *,

energizes the vital bus with permanently connected loads within 13 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization of these loads, the steady state voltage and frequency of the vital bus shell be maintained at 2 3910 and $ 4400 volts and 2 58.8 and $ 60.5 Hz during this test.

4.

Verifying that on an ESF actuation test signal without loss of offsite power the diesel generator starts on the auto-start signal and operates on standby for greater than or equal to 5 minutes *,

The diesel generator shall achieve 2 3910 volts and 2 58.8 Hz in i 13 seconds, and subsequently achieves steady state voltage of 2 3910 and $ 4400 volts and frequency of 2 "9.6 and $ 60.5 Hz.

5.

Deleted 6.

Simulating a loss of offsite power in conjunction with an ESF actuation test signal, and a)

Verifying de-energization of the vital buh.ud load shedding from the vital bus.

b)

Verifying the diesel starts on the auto-start signal *,

energizes the vital bus with permanently connected loads within i

13 seconds, energizes the auto-connected emergency (accident) loads through the load sequencer and operates for greater than or squal to 5 minutes while its generator is loaded with the emergency loads. After energization of these loads, the steady state voltage and frequency of the vital bus shall be l-maintained at 2 3910 and $ 4400 volts and 2 58.8 and $ 60.5 Hz

{

during this test.

1 SALEN - UNIT 2 3/4 8-4 Aaenuent No.200

.- m.-

._....___ ~.. _. _ -

- -. - -.. -. _... - ~.. -,

ELECTRICAL POWER SYST2HS SURVT,II. LANCE REQUIREMENTS (Continued)

==

c)

Verifying that all nonessential automatic diesel generator trips (i.e., other than engine overspeed, lube oil pressure low, 4 KV Bus differential and generator differential). are automatically bypassed upon loss of voltage on the vital bus concurrent with a safety injection actuation signal.

7.

Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to 2760-2860 kw**.

During the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to 2500-2600 kw**.

The steady state voltage and frequency shall be maintained at 2 3910 and s 4580 volts and 60 i 1.2 Hz during this test.

8.

Verifying that the auto-connected loads to each diesel generator do not exceed the two hour rating of 2860 kw.

9.

Verifying that with the diesel generator operating in a test mode (connected to its bus), a simulated safety injection signal overrides the test mode by (1) returning the diesel generator to standby operation and (2) automatically energizing the emergency loads with offsite power.

e.

At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting all diesel generators simultaneously *, during shutdown, and verifying that all diesel generators accelerate to at least 58.8 Hz in less than or equal to 13 l

seconds.

f.

At least once per 18 months, the following test shall be performed within 5 minutes of diesel shutdown after the diesel has operated for at least two hours at 2500-2600 kw":

Verifying the diesel generator starts and achieves 2 3910 volts and 3

i 2 58.8 Hz in $ 13 seconds, and subsequently achieves steady state voltage of 2 3'.10 and $ 4400 volts and frequency of 60 i 1.2 Hz.

4.8.1.1.3 The diesel fuel oil storage and transfer system shall be demonstrated OPERABLE:

a.

At 16ast once per 31 days by:

3.

. Verifying the level in u.ch of the above required fuel storage tanks.

2.

Verifying that both fuel transfer pumps can be started and transfer fuel from the fuel storage tanks to the day tanks.

3 3

1 SALEM - UNIT 2 3/4 8-5 Amendment No. 200 t

i

. - - - _.. ~

..~..

e.

..~ _

.. ~. - -

. - -. - -.... ~..

I I

l-e e

ELECTRICAL POWER SYSTEMS SURVEII.IANCE REQUIREMENTS (Continued) b.

At least once per 92 days by verifying that a sample of diesel fuel l

from each of the above required fuel storage tanks is within the l

acceptable limits specified in Table 1 of ASTM D975-77 when checked l

for viscosity, water and sediment.

l l

4.8.1.1.4 Reports - NOT USED l

i i

l l

l 4

l Surveillance testing may be ecaducted in accordance with the annufacturer's recommendations regarding engine preluba, wars-up and loading - (unless loading times are specified in the individual Surveillance Requirements).

t This band is meant'as guidance to preclude routine exceedances of the l

diesel generator manufacturer's design ratings. Loads in excess of this hand for special testing or momentary variations due to changing bus loads shall not invalidate the test.

i l

SALEN - UNIT 2~

3/4 8-6 Amendment No. 200 y

-.y-y e

--i

  • e - -,

,-gug.e.

g,e c-,

y-n--

-sy+--<

. -, - - - - -. -. _.. - ~

. - -.. -. ~.

.... - -.. - -. -. ~. -. -.. - -.. ~ - - - -

ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2 A.C.

SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility, and

2) the mitigation and control of accident conditions within the facility. The c.inimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power ocurces provide restriction upon continued facility operation commensurate with the level of degradation..The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least two independent sets of onsite A.C. and D.C. power sources and casociated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and casociated distribution systems during shutdot:n and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2). sufficient instrumentation and control capability is available for Eonitoring and maintaining the unit status.

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel g:nerators are based upon the recommendations of Regulatory Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977. Regulatory Guide 1.100 criteria for determining and reporting valid tests and failures, and eccelerated diesel generator testing, have been superseded by implementation of the Maintenance Rule for the diesel generators per 10CFR50.65.

In addition to the Surveillance Requirements of 4.8 1.1.2, diesel preventative maintenance is performed in accordance with procedures based on manufacturer's recommendations with consideration given to operating experience.

The minimum voltage and frequency stated in the Surveillance Requirements (SR) j are those necessary to ensure the Emergency Diesel Generator (EDG) can p.ccept Design

- % sis Accident (DBA) loading while maintaining acceptable voltage and frequency levels. Stable operation at the nominal voltage and frequency values is also l

cssential in' establishing EDG OPERABILITY, but a time constraint is not imposed.

l The lack of a time constraint is based on the fact that a typical EDG will l

cxperience a period of voltage ano frequency oscillations prior to reaching steady state operation if these oscillations are not dampened out by load application.

In lieu of a time constraint in the SR, controls will be provided to monitor and trend the actual time to reach stable operation within the band as a means of ensuring there is no voltage regulator or governor degradation that could cause an EDG to j-become inoperable.

F i

i l

SALEM - UNIT 2 B 3/4 8-1 Amendment No. N T

m.._

.. _ _ _ _. _ _ _. -. _ _.. ~ _... _.. _.... _ _. _ _ _ _.. ~. _.. _ _ _ _.. _. - _ _ _. _ _. -

t 3/4.9 ELECTRICAL POWER SYSTEMS BASES (Continued)

' Standby condition" for the purpose of defining the condition of the engine immediately prior to starting for surveillance requirements requires that the lube cil temperature be between 100 'F and 170 'F.

The minimum lube oil temperature for an OPERABLE diesel is 100 'F.

The thirteen second time requirement for the Emergency Diesel Generator to reach r:ted voltage and frequency was originally based on a Westinghouse assumption of fifteen seconds that included the delay time between the occurrence of the incident and the application of electrical power to the first sequenced safeguards pump (IURL-3011, dated November 13, 1974) and included an instrument response time of two ccconds (BURL-1531, dated July 27, 1970). The times specified in UFSAR Section 15.4 bound the thirteen seconds specified in the TS.

l The narrower band for frequency specified for testing performed in steady state icochronous operation will ensure the EDG will not be run in an overloaded condition (steady state) during accident conditions. Steady state is assumed to be achieved efter one minute of operation in the isochronous mode with all required loads requenced on the bus, i

The narrower band for steady state voltage is specified for operation when the EDG is not synchronized to the grid to ensure the voltage regulator will protect driven equipment from over-voltages during accident conditions. Procedural controls will cnsure that equipment voltages are maintained within acceptable limits during t: sting when paralleled to the grid.

The wider band for frequency is appropriate for testing done with the governor in the droop mode.

Likewise the wider band for voltage is appropriate when paralleled i

to the grid.

All voltages and frequencies specified in SR 4.8.1.1.2 are representative of the analytical values and do not account for postulated instrument inaccuracy.

Instrument inaccuracies for EDG voltage and frequency are administratively centrolled.

Preventive maintenance includes those activi'.ies (including pre-test inspections, measurements, ad-)ustments and preparations) performed to maintain an otherwise

- OPERABLE EDG in an OPERABLE status. Corrective maintenance includes those cctivities required to correct a condition that would cause the EDG to be i

inoperable.

Surveillance requirement 4.8.1.2 is modified by a Note.

The reason for the Note is j

to preclude requiring tho' OPERABLE DG(s) from being paralleled with the offsite power network or otherwise rendered inoperable during performance of the curveillance requirecint, and to preclude de-energizing a required ESF bus or l

disconnecting a required offsite circuit during performance of surveillance requirements. With limited AC sources available, a single event could compromise i

both the required circuit and the DC.

It is the intent that i

SALEN - UNIT 2 B 3/4 8-la Amendment No. M