Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19340E267 + (22:54:10, 24 December 2024)
- ML19340E265 + (22:54:11, 24 December 2024)
- 05000312/LER-1980-048-03, /03L-0:on 801201,while Reviewing Inservice Insp Program & Surveillance Procedures,Two Remotely Operated Reactor Bldg Isolation Valves Discovered Not Tested as Required by Tech Specs.Caused by Deletion of Quarterly Test + (22:54:13, 24 December 2024)
- 05000312/LER-1980-048, Forwards LER 80-048/03L-0 + (22:54:14, 24 December 2024)
- ML19340E261 + (22:54:16, 24 December 2024)
- 05000285/LER-1980-031-03, /03L-0:on 801207,during Normal Operation,Leak Developed in Weld Connecting Demineralized Water Flush Line to Discharge Manifold of Charging Pump.Caused by Probable Piping Vibration.Crack Repaired & Pump Returned to Svc + (22:54:17, 24 December 2024)
- ML19340E258 + (22:54:19, 24 December 2024)
- 05000285/LER-1980-031, Forwards LER 80-031/03L-0 + (22:54:20, 24 December 2024)
- ML19340E254 + (22:54:24, 24 December 2024)
- ML19340E251 + (22:54:31, 24 December 2024)
- 05000346/LER-1980-088-03, /03L-0:on 801205,while Troubleshooting for Ground Problems in Safety Features Actuation Sys Channel 3 Cabinet, Station Experienced Channel 1/3 Simultaneous Actuation of Levels 1,2,3 & 5.Caused by Component failure.PS-07 Repl + (22:54:32, 24 December 2024)
- ML19340E248 + (22:54:34, 24 December 2024)
- ML19340E246 + (22:54:35, 24 December 2024)
- 05000346/LER-1980-088, Forwards LER 80-088/03L-0 + (22:54:36, 24 December 2024)
- ML19340E242 + (22:54:37, 24 December 2024)
- ML19340E243 + (22:54:37, 24 December 2024)
- IR 05000461/1980021 + (22:54:38, 24 December 2024)
- ML19340E237 + (22:54:40, 24 December 2024)
- ML19340E236 + (22:54:41, 24 December 2024)
- ML19340E235 + (22:54:42, 24 December 2024)
- 05000346/LER-1980-087-03, /03L-0:on 801206,while Troubleshooting,Control Room Operator Could Not Stroke Valve CV5006.Valve Declared Inoperable.Cause Unknown.Corrective Action Will Be Conducted Under Maint Work Order IC-814-80 During Next Outage + (22:54:43, 24 December 2024)
- ML19340E233 + (22:54:45, 24 December 2024)
- ML19340E232 + (22:54:46, 24 December 2024)
- 05000346/LER-1980-087, Forwards LER 80-087/03L-0 + (22:54:47, 24 December 2024)
- 05000346/LER-1980-089-03, /03L-0:on 801203,following Reactor Trip,Rcs Sample Revealed Dose Equivalent I-131 Level Was Greater than Tech Specs.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored to Ensure That Gas Decayed to Below Limits + (22:54:49, 24 December 2024)
- ML19340E227 + (22:54:51, 24 December 2024)
- 05000346/LER-1980-089, Forwards LER 80-089/03L-0 + (22:54:52, 24 December 2024)
- ML19340E224 + (22:54:54, 24 December 2024)
- 05000346/LER-1980-086-03, /03L-0:on 801203,while Performing ST 5030.12, Alligator Clip Slipped Off Terminal Studs 3 & 4 Causing Short Circuit.Caused by Design Error.St 5030.12 Modified & F101 Fuse Replaced + (22:54:55, 24 December 2024)
- 05000155/LER-1980-048-01, /01T-0:on 801219,150 Splices & Five Terminal Block Defects Were Found.Caused by Installation of Faulty Equipment in Original Const.Splices & Blocks Repaired or Replaced + (22:54:57, 24 December 2024)
- 05000366/LER-1980-121-03, /03L-0:on 801211,all Points of 1T47-RG11,drywell Temp Recorder,Were Reading Higher than Redundant Recorder 1T47-R612.Caused by Faulty Slide Wire Contacts & Printhead Mechanism.New Parts Installed + (22:54:58, 24 December 2024)
- 05000155/LER-1980-048, Forwards LER 80-048/01T-0 + (22:55:00, 24 December 2024)
- 05000346/LER-1980-086, Forwards LER 80-086/03L-0 + (22:55:02, 24 December 2024)
- ML19340E215 + (22:55:06, 24 December 2024)
- 05000321/LER-1980-119-03, /03L-0:on 801212,routine Channel Check Showed Fission Product Monitors 1D11-K631,particulate Count & 1D11-K633,noble Gas Count,Were Out of Calibr.Caused by Discriminator Setpoint Drift.Setpoint Adjusted + (22:55:08, 24 December 2024)
- ML19340E213 + (22:55:09, 24 December 2024)
- ML19340E212 + (22:55:10, 24 December 2024)
- 05000366/LER-1980-121, Forwards LER 80-121/03L-0 + (22:55:11, 24 December 2024)
- ML19340E209 + (22:55:13, 24 December 2024)
- 05000321/LER-1980-119, Forwards LER 80-119/03L-0 + (22:55:14, 24 December 2024)
- ML19340E206 + (22:55:15, 24 December 2024)
- ML19340E205 + (22:55:16, 24 December 2024)
- 05000155/LER-1980-040-03, /03L-0:on 801202,diesel Fire Pump Unit Did Not Produce Full Discharge Pressure Output Until After Starting Time Acceptance Criteria.Cause Undetermined.Engine Jacket Heater Thermostat Control Setting Increased + (22:55:17, 24 December 2024)
- ML19340E203 + (22:55:18, 24 December 2024)
- ML19340E201 + (22:55:19, 24 December 2024)
- ML19340E200 + (22:55:20, 24 December 2024)
- 05000155/LER-1980-040, Forwards LER 80-040/03L-0 + (22:55:21, 24 December 2024)
- ML19340E196 + (22:55:22, 24 December 2024)
- ML19340E195 + (22:55:23, 24 December 2024)
- ML19340E194 + (22:55:24, 24 December 2024)
- ML19340E192 + (22:55:25, 24 December 2024)