ML19340E201

From kanterella
Jump to navigation Jump to search
Forwards Phase 2 Submittal Responding to Item 26 of IE Bulletin 80-11, Masonry Wall Design
ML19340E201
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/17/1980
From: Hukill H
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19340E202 List:
References
IEB-80-11, TLL-584, NUDOCS 8101060632
Download: ML19340E201 (1)


Text

I s

Y%

I Metropolitan Edison Company Post Office Box 480 gj Middletown, Pennsylvania 17057 717 944 4041 Writer's Direct Dial Number November 17, 1980 TLL 584 Office of Inspection & Enforcement Aten:

B. H. Grier, Director Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa.

19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 IE Bulletin 80-11 Enclosed is our phase 2 submittal concerning masonry wall design. This report responds to item 2b of IE Bulletin 80-11.

Sincerely, I

s os 1

D.

ukill Director, TMI-1 l

HDH:DCM:hh Enclosure cc:

J. T. Collins (w/o att)

B. J. Snyder (w/o att)

R. W. Reid (w/o att)

D. Dilanni (w/o att)

H. Silver (w/o att) l l

l l

l 1811 01 06 Ob%

Q Metropottan Ed: son Company is a Memeer of the General Pubhc Utities System

f 'f O

1y xNN%/#//

!//(d NV

IMAGE EVALUATION 9

TEST TARGET (MT-3) l

\\

J f

1.0 lL2 EM fM i

p" E pHpEi li 2

[36 1.1 1

m i

1.8 l

1.25 1.4 1.6 l

j 6"

4

&l 4%#

sf>;x4%

b4

y' o 7/

e<> eus

<p<>

i L

4 lo

,a;q},>

L:% zg

/////

,f%

'#G)j>

%;.y

]

TiiST TARGET (MT-3)

J i

i 1

l.0 g: a s a g E 3 g "n cm

{

l,l

e2 gg l

ll l.8 j

1.25 1.4 1.6 4

6" i

i l

.kr +/////

<> sp 1

i

>,,D//

3v

.