Text
I p eac, 9
'o UNITED STATES 4
8" ; #(
7, NUCLEAR REGULATORY COMMISSION 2
1 REGION ill
~
k of 7se noossveLT noao e
gv
,o otsm ettyN. Luwois sois7 November 7, 1980 Those on Attached Address Listing:
This IE Information Notice No. 80-40 is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions. If you have questions regarding this matter, please contact this office.
Sincerely, L ).
t James G. Keppler v Director
Enclosure:
IE Information Notice No. 80-40 t
i cc w/ enc 1:
Mr. D. W. Kane, Sargent & Lundy Mr. Gary N. Wright, Chief Division of Nuclear Safety Reproduction Unit NRC 20b I
I I
810106n 633 R
I RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRL'CTION PERMIT HOLDERS (BWR's and PWR's)
Docket No. 50-331 k)
Iowa Electric Light and Power Company
[J
~
ATTN:
Mr. Duane Arnold
~
President U -l F{.^h" IE Towers 23 E3 P. O. Box 351 Cedar Rapids, IA 52406 g
~5 n3 G
ns cc w/enel:
)
D. Mineck, Chief Engineer Central Files Director, NRR/DPM Director, NRR/ DOR AE0D Resident Inspector, RIII PDR Local PDR NSIC TIC Docket No. 50-367 Northern Indiana Public Service Company ATTN:
Mr. Eugene M. Shorb Senior Vice President 5265 Hohman Avenue Hammond, IN 46325
_[ enc 1:
cc m tral Files Director, NRR/DPM Director, NRR/ DOR PDR l
TIC l
Mr. Dean Hansell, Office of Assistant Attorney General l
I i
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's end PWR's)
Docket No. 50-263 Docket No. 50-282 Docket No. 50-306 Northern States Power Company ATTN:
Mr. Dennis E. Gilberts Vice President Power Production and System Operation 414 Nicollet Mall Minneapolis, MN 55401 cc w/ encl:
Mr. W. A. Shamla, Resident Inspectors, RIII Plant Manager PDR Mr. F. P. Tierney, Jr.,
Local PDR Plant Manager NSIC Central Files TIC Director, NRR/DPM John W. Ferman, Ph.D.,
Director, NRR/ DOR Nuclear Engineer, MPCA AEOD Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:
Mr. S. W. Shields Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 cc w/ enc 1:
Mr. Steve J. Brewer, Nuclear TIC Safety and Licensing Supervisor LeBoeuf, Lamb, Leiby & MacRae Central Files Mr. Dave Martin, Office of the Director, NRR/DPM Attorney General Director, NRR/ DOR Mr. John R. Galloway, Staff PDR Director, Environment, Energy Local PDR and Natural Resources Subcommittee NSIC i
l
\\
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDER (BWR's cnd PWR's)
Docket No. 50-346 Toledo Edison Company ATTN:
Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 cc w/ enc 1:
Mr. T. Murray, Station Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:
Mr. John K. Bryan Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 cc w/ encl:
Mr. W. H. Weber, Manager, Nuclear Construction Central Files l
Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. X. Drey l
Mr. Ronald Fluegge, Utility l
Divisio3, Missouri Public Service Commission i
RIII'o CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's cnd PWR'o)
Docket No. 50-266 s
Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 cc w/ enc 1:
Mr. G. A. Reed, Plant Local PDR Manager NSIC Central Files TIC Director, NRR/DPM Sandra A. Bast, Lakeshore Director, NRR/ DOR Citizens for Safe Energy Timochy Colburn, ORB /NRR Mr. John J. Duffy, Chief AEOD Boiler Inspector Resident Inspector, RIII Mr. Peter Anderson, Wisconsin's PDR Environmental Decade Docket No. 50-305 Wisconsin Public Service Corporation i
ATTN:
Mr. E. R. Mathews Vice President Power Supply and Engineering P. O. Box 1200 Green Bay, WI 54305 cc w/ encl:
l D. C. Hintz, Plant AEOD Superintendent Resident Inspector, RIII Mr. W. Sayles, Chief PDR Engineer Local PDR Central Files NSIC Director, NRR/DPM TIC Director, NRR/ DOR Mr. John J. Duffy, Chief Boiler Inspector l
RIII'S CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CpNSTRCCTION PERMIT HOLDERS (BWR's and PWR's)
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 3 roadway New York, NY 10004 cc w/ encl:
Mr. D. V. Shaller, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII i
PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Corporation i
l 6
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's cnd PWR'c)
Docket Nos. 50-10, 50-237, 50-249; i
50-254, 50-265; 50-295, 50-304; 50-373, 50-374; 50-454, 50-455; 50-456 and 50-457 Commonwealth Edison Company ATTN:
Mr. Cordell Reed, Vice President Post Office Box 767 Chicago, IL 60690 cc w/ enc 1:
Mr. J. S. Able, Director Mr. Gunner Sorensen, Site of Nuclear Licensing Project Superintendent Mr. D. J. Scott, Station Mr. R. Cosaro, Project Superintendent Superintendent Mr. N. Kalivianakis, Mr. J. F. Gudac, Station Station Superintendent Superintendent Mr. X. Graesser, Station Central Files Superintendent Director, NRR/DPM Mr. L. J. Burke, Site Director, NRR/ DOR Construction Superintendent AEOD Mr. T. E. Quaka, Quality Resident Inspectors, RIII Assurance Supervisor PDR Mr. R. H. Holyoak, Station Local PDR Superintendent NSIC Mr. B. B. Stephenson, TIC Project Manager Mr. Dean Hansell, Office of Mr. V. I. Schlosser, Assistant Attorney General Project Manager Myron M. Cherry, Chicago Mr. R. E. Querio, Station Superintendent Docket No. 50-358 Cincinnati Gas and Electric Company ATTN:
Mr. Earl A. Borgmann Senior Vice President Engineering Services and Electric Production 139 East 4th Street Cincinnati, OH 45201 cc w/ encl:
Mr. J. R. Schott, Plant Local PDR Superintendent NSIC Central Files TIC Director, NRR/DPM Harold W. Kohn, Poser Director, NRR/ DOR Siting Commission AEOD Citizens Against a Radioactive Resident Inspector, RIII Environment PDR Helen W. Evans, State of Ohio
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (B'JR' c cnd P'JR'c)
Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN:
Mr. Dalwyn R. Davidson Vice President - Engineering P. O. Box 5000.
Cleveland, OH 44101 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen Evans, State of Ohio t
Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 cc w/ enc 1:
Mr. D. P. Hoffman, Nuclear Resident Inspectors, RIII Licensing Administrator PDR Mr. C. J. Hartman, Local PDR Plant Superintendent NSIC Mr. R. W. Montross, Manager TIC Central Files Ronald Callen,Ilichigan Director, NRR/DPM Public Service Commission Director, NRR/ DOR Myron M. Cherry, Chicago AEOD
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PETiMIT HOLDERS (BWR'c cnd PliR's)
Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook Vice President Midland Project 1945 West Parnail Road Jackson, MI 49201 cc w/ enc 1:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago Docket No. 50-409 Dairyland Power Cooperative ATTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 cc w/ enc 1:
Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mr. John Duffy, Chief Beiler Inspector 1
p W
,-p.**
,,M
, gen ~*
g.
w a--e mew--m v
m--
w y-gr w
--89*
- e=
M
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's end PWR's)
Docket Jc. 50-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 4&226 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney Docket No. 50-461 Docket No. 50-462 Illinois Power Company ATTN:
Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General Mr. Gary N. Wright, Chief Division of Nuclear Safety r
.,=. -
w r
9
i
~ % " h SSINS No.:
l D
6835 Jo
.=
_ e9/nl b Accession No.:
UNITED STATES 8008220269 NUCLEAR REGULATORY COMMISSION IN 80 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 November 7, 1980 IE Information Notice No.: 80-40:
EXCESSIVE NIR0 GEN SUPPLY PRESSURE ACTUATES SAFETY-RELIEF VALVE OPERATION TO CAUSE REACTOR DEPRESSURIZATION Description of Circumstances:
On October 7 and 31, 1980, the reactor coolant system was spuriously depres-surized at Boston Edison Company's Pilgrim Nuclear Power Station Unit No. 1.
The Pilgrim Station Unit 1 uses a GE BWR. The depressurizations resulted when excessive pressure in the nitrogen supply system caused the "A" Target Rock (TR) safety relief valve to open and remain open until the excessive supply pressure could be isolated, pneumatic operator pressure vented and the main steam system depressurized sufficiently to allow the main disk to reseat.
These two events involved a failure in the pressure regulation of the supply nitrogen and not a failure of the TR safety-relief valve to function as designed.
The safety-relief valves at Pilgrim are designed to be supplied, with other drywell instrumentation, from either the compressed air system or containment atmosphere control system (CACS).
The CACS uses nitrogen for containment inerting. The supply for the safety relief valves is provided from the CACS through an ambient air vaporizer and then through one of two parallel pressure regulators or a parallel bypass line.
Shortly before the time of each event a new supply of liquid nitrogen had been added to the storage tanks. At the time of the events the two pressure regulators were in service with the bypass closed. Nitrogen pressure supplying the valves increased to 160 - 165 psi.
This may have been caused by liquid nitrogen reaching the pressure regulators or by a failure in a pressure regulator.
The result was excessive pressure which was sufficient to leak through the solenoid actuator and initiate the pneumatic operator of the safety relief valve.
The design normal operating pressure of the compressed air or nitrogen systems supplying the safety-relief valves is90-110 psi.
At a pressure of 145 psi the solenoid valve may begin to leak since excessive pressure acts to unseat the disk.
The supply pressure must then decrease to 135 psi or less for the solenoid disk to restst.
In addition, the design of the safety relief valve is such that as the main steam pressure increases, less instrument pressure is necessary to initiate the pneumatic operator. Approximately 3 to 5 psi at the pneumatic operator is sufficient to initiate the safety-relief valve opening.
Such a pressure begins to build with leakage through the solenoid actuator and was reached in the "A" valve at 160 psi supply pressure.
According to information from GE and TRC, approximately 180 psi pressure is necessary for all of the safety-relief valves to open as result of supply overpressure.
It would appear that under such conditions of overpressure that safety-relief valve openings would be sequential rather than simultaneous.
The particular solenoid actuator valves used with these two-stage safetyrelief valves are manufactured by TRC.
Their design is such that excessive control pressure tends to unseat the solenoid valve disk.
The three-stage TR safety-relief valves use either AVC0 (Automatic Valve Company) or ASCO (Automatic Switch Company) solenoid valves according to information from GE.
The AVCo solenoid
1N 80-40 November 7, 1980 Page 2 of 2 valve has been tested to 300 psi and found not to leak and the ASCo solenoid valve tends to seat with increasing supply pressure.
Therefore, the NRC believes that the tendency for solenoid leakage and hence safety-relief valve crening is confi.ned to the two stage safety-relief valve installations.
~iais information is provided as a notification of a possibly significant matter which is still under review by the NRC staff.
It is anticipated that the results of continuing NRC review will culminate in issuance of an IE Bulletin which will recommend or require specific licensee action.
In the interim, we expect that recipients will review the information for possible i
applicability to their facilities, particularly those with installations of the TR two-stage safety-relief valves.
If you have questions regarding this matter,.please contact the Director of the appropriate NRC Regional Office.
W
.n,
+
IN 80-40 November 7, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No.
Subject Issue Issued to 80-39 Nalfunctions Of Solenoid 10/31/80 All light water reactor Valves Manufactured By facilities holding Valcor Engineering Corporation power reactor OLs or cps 80-38 Cracking In Charging Pump 10/30/80 All PWR facilities Casing Cladding with an OL or CP 80-37 Containment cooler leaks 10/24/80 All nuclear power and reactor cavity facilities holding flooding at Indian Point power reactor OLs Unit 2 or cps 80-36 Failure of Steam 10/10/80 All nuclear power Generator Support Bolting reactor facilities holding power reactor OLs or cps 80-35 Leaking and dislodged 10/10/80 All categories G and Iodine-124 implant seeds G1 medical licensees 80-34 Boron dilution of reactor 9/26/80 All pressurized water coolant during steam reactor facilities generator decontamination holding power reactor OLs 80-33 Determination of teletherapy 9/15/80 All teletherapy timer accuracy (G3) licensees 80-32 Clarification of certain 8/12/80 All NRC and agreement requirements for Exclu-state licensees sive-use shipments of radioactive materials 80-31 Maloperation of Gould-8/27/80 All light water reactor Brown Boveri Type 480 facilities holding OLs volt type K-6005 and or cps K-DON 6005 circuit breakers
- Operating Licenses or Construction Permits 1
N
.. ~..
.-