Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341C662 + (21:39:00, 24 December 2024)
- B10168, Forwards Semi-Annual Radioactive Effluents Release Rept, Jul-Dec 1980 Per Format of Reg Guide 1.21 & Requirements of Reg Guide 10.1 + (21:39:01, 24 December 2024)
- ML19341C659 + (21:39:03, 24 December 2024)
- ML19341C658 + (21:39:03, 24 December 2024)
- BSEP-81-0417, Ro:On 810223,analysis Indicated That Ten Supports on Control Rod Driveline Vent Line Would Fail in as-built Condition During Designed Seismic Event.On 810220 RCIC Tripped W/O Receiving Permission + (21:39:04, 24 December 2024)
- ML19341C656 + (21:39:07, 24 December 2024)
- ML19341C654 + (21:39:08, 24 December 2024)
- ML19341C655 + (21:39:08, 24 December 2024)
- ML19341C653 + (21:39:10, 24 December 2024)
- 05000321/LER-1981-010-01, /01T-0:on 810211,AE Reported That Diesel Generator 1A,1C,2A,2B & 1B Outlet Svc Water Piping & Associated Seismic Supports Exceeded Tech Spec.Caused by Design Omission.Design Mods Made + (21:39:11, 24 December 2024)
- ML19341C651 + (21:39:12, 24 December 2024)
- ML19341C650 + (21:39:14, 24 December 2024)
- ML19341C649 + (21:39:15, 24 December 2024)
- ML19341C647 + (21:39:16, 24 December 2024)
- 05000321/LER-1981-010, Forwards LER 81-010/01T-0 + (21:39:17, 24 December 2024)
- ML19341C643 + (21:39:19, 24 December 2024)
- ML19341C644 + (21:39:19, 24 December 2024)
- ML19341C642 + (21:39:20, 24 December 2024)
- TAC:44830 + (21:39:21, 24 December 2024)
- ML19341C640 + (21:39:21, 24 December 2024)
- ML19341C639 + (21:39:22, 24 December 2024)
- ML19341C636 + (21:39:23, 24 December 2024)
- ML19341C638 + (21:39:23, 24 December 2024)
- 05000271/LER-1981-006-03, /03L-0:on 810127,ATWS/recirculation Pump Trip High Pressure Trip Points from PT-2-3-56Bm,56Cm & 56Dm Tripped Above Tech Spec Level During Surveillance Testing Per Operation Procedure 4342.Caused by Instrument Drift + (21:39:24, 24 December 2024)
- IR 05000320/1980015 + (21:39:27, 24 December 2024)
- PNO-II-81-018, on 810224,notification Received Re Indefinite Const Delay on Facilities.Work on Unit 1 Will Be Reduced & Const on Unit 2 Will Be Stopped.Caused by Financial Problems + (21:39:30, 24 December 2024)
- ML19341C632 + (21:39:32, 24 December 2024)
- 05000271/LER-1981-006, Forwards LER 81-006/03L-0 + (21:39:33, 24 December 2024)
- ML19341C628 + (21:39:39, 24 December 2024)
- ML19341C627 + (21:39:41, 24 December 2024)
- 05000346/LER-1981-009-03, /03L-0:on 810128,diesel Generator 1-2 Could Not Be Started W/Left Side Set of Air Start Motors During Diesel Generator Surveillance Test 5081.01.Caused by Failure of One Air Start Motor Due to Broken Solenoid Drive Shaft + (21:39:42, 24 December 2024)
- ML19341C624 + (21:39:43, 24 December 2024)
- ML19341C623 + (21:39:43, 24 December 2024)
- ML19341C621 + (21:39:44, 24 December 2024)
- ML19341C620 + (21:39:45, 24 December 2024)
- ML19341C619 + (21:39:46, 24 December 2024)
- 05000346/LER-1981-009, Forwards LER 81-009/03L-0 + (21:39:47, 24 December 2024)
- ML19341C616 + (21:39:49, 24 December 2024)
- ML19341C615 + (21:39:50, 24 December 2024)
- 05000346/LER-1981-008-03, /03L-0:on 810127,345 Kv Switchyard Bus K Tripped & Locked out,de-energizing Startup Transformer 02.Caused by Action from Directional Ground Current Relay & Charred Phase Lightning Arrestor C on Startup Transformer + (21:39:51, 24 December 2024)
- ML19341C613 + (21:39:52, 24 December 2024)
- ML19341C611 + (21:39:53, 24 December 2024)
- ML19341C610 + (21:39:54, 24 December 2024)
- ML19341C608 + (21:39:54, 24 December 2024)
- 05000346/LER-1981-008, Forwards LER 81-008/03L-0 + (21:39:56, 24 December 2024)
- ML19341C605 + (21:39:57, 24 December 2024)
- ML19341C603 + (21:39:58, 24 December 2024)
- ML19341C604 + (21:39:58, 24 December 2024)
- ML19341C602 + (21:39:59, 24 December 2024)
- 05000312/LER-1981-003-03, /03L-0:on 810203,during Reactor Bldg Spray Sys Loop B Sfas Test,Reactor Bldg Spray Pump B Started Late. Caused by Incorrect Setting on Model 62B Agastat Timer. Timer Reset + (21:40:01, 24 December 2024)
- ML19341C600 + (21:40:02, 24 December 2024)