_.-
-
-
.-
, .
- . - . -
_
- .
.
--
..
'
t.
'.
g
$2 8tEC
0
%
UNITED STATES
c
t
NUCLEAR REGULATORY COMMisslON
5 *g ,% (f S
.,
.1
REGION l
., h
p
g-
631 PARK AVENUE
W
,;.
f
nisc OF PR US$1 A, PENNSYL.VANI A 19406
,
- '
DEC 171980
.
'M
Docket No. 50-320
e
' r ,{ p. N.(N.
. h y;c
.
J!
5
S
,
'
N I.R
LU
C
..
_
Metropolitan Edison Company
f
g h* 0M @
ATTN: Mr. R. C. Arnold
, ,icit
-
-
'
".'To M 5504
[f
.
Senior Vice President
b
100 Interpace Parkway
Parsippany, New Jersey 07054
4
p
i
Gentlemen:
Subject:
Inspection 50-320/80-15
This refers to the routine inspection conducted by Mr. R. Conte of this
]
office on September 1 - October 18, 1980, of activities authorized by
,
NRC License No. DPR-73 and to the discussions of our findings held by
i
Mr. Conte with Mr. J. Chwastyk at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel,
measurements made by the inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any infonnation that you (or
l!
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which
'
contains a statement of reasons which addresses with specificity the
items which will be considered by the Comission as listed in subpara-
graph (b) (4) of Section 2.790. The information sought to be withheld
shall be incorporated as far as possible into a separate part of the
af fidavi t.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
l
81080 3 0 M
l
9
. - -
.
-
.
-
.
. .- -
.-
.
. . _ - -
,
'.
Metropolitan Edison Company
2
No reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
,
,..
,
/
/l
W
a
,'c , : . ,( ," - Awl.. .
, v
.
- , . <
,
,
Boyce H. Grier
'
Di rector
Enclosure:
1.
Office of Inspection and Enforcement Inspection Report
Number 50-320/80-15
cc w/ encl:
J. G. Herbein, Director - Nuclear Assurance
G. K. Hovey, Director, Unit 2
e
J. J. Barton, Manager Site Operations, Unit 2
B. Elam, Manager, Plant Engineering, Unit 2
R. F. Wilson, Director - Technical Functions, TMI-2
L. W. Harding, Supervisor of Licensing
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
R. W. Conrad
J. B. Lieberman, Esquire
G. F. Trowbridge, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
(Without Report)