Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347D284 + (10:52:20, 24 December 2024)
- ML19347D282 + (10:52:21, 24 December 2024)
- ML19347D281 + (10:52:22, 24 December 2024)
- ML19347D279 + (10:52:23, 24 December 2024)
- ML19347D278 + (10:52:24, 24 December 2024)
- ML19347D276 + (10:52:25, 24 December 2024)
- ML19347D277 + (10:52:25, 24 December 2024)
- ML19347D275 + (10:52:26, 24 December 2024)
- ML19347D274 + (10:52:27, 24 December 2024)
- ML19347D273 + (10:52:28, 24 December 2024)
- ML19347D272 + (10:52:29, 24 December 2024)
- ML19347D271 + (10:52:29, 24 December 2024)
- ML19347D270 + (10:52:30, 24 December 2024)
- ML19347D269 + (10:52:31, 24 December 2024)
- ML19347D268 + (10:52:31, 24 December 2024)
- ML19347D266 + (10:52:32, 24 December 2024)
- 05000325/LER-1981-019-03, /03L-0:on 810204,isolation Valves to Primary Containment post-accident Radiation monitor,1-CAC-AI-1262, Found Open W/Monitor Photohelic Unit Removed.Caused by Inadequate Maint Procedures.Supplemental Rept to Be Issued + (10:52:34, 24 December 2024)
- ML19347D264 + (10:52:35, 24 December 2024)
- 05000324/LER-1981-025-01, /01T-0:on 810223,per IE Bulletin 79-07 Analysis, 10 Pipe Supports on Control Rod Driveline Vent Line Piping Found Susceptible to Failure in Seismic Event.Caused by as-built Condition.Beams & Plates Added to Supports + (10:52:37, 24 December 2024)
- ML19347D261 + (10:52:38, 24 December 2024)
- IR 05000274/2019201 + (10:53:01, 24 December 2024)
- 05000325/LER-1981-019, Forwards LER 81-019/03L-0 + (10:53:03, 24 December 2024)
- ML19347D257 + (10:53:04, 24 December 2024)
- 05000324/LER-1981-025, Forwards LER 81-025/01T-0 + (10:53:05, 24 December 2024)
- ML19347D254 + (10:53:06, 24 December 2024)
- ML19347D253 + (10:53:07, 24 December 2024)
- 05000278/LER-1981-008-01, /01T-0:on 810211,main Isolation Valve on Loop B Mistakenly Isolated Instead of Loop a Valve During Installation of Test Connection to 1-inch Containment Atmospheric Dilution Line.Caused by Wrong Valve Designation + (10:53:08, 24 December 2024)
- 05000278/LER-1981-008, Forwards LER 81-008/01T-0 + (10:53:10, 24 December 2024)
- ML19347D248 + (10:53:12, 24 December 2024)
- ML19347D247 + (10:53:12, 24 December 2024)
- ML19347D246 + (10:53:13, 24 December 2024)
- ML19347D245 + (10:53:14, 24 December 2024)
- ML19347D244 + (10:53:15, 24 December 2024)
- ML19347D243 + (10:53:16, 24 December 2024)
- ML19347D241 + (10:53:20, 24 December 2024)
- 05000327/LER-1981-018-03, /03L-0:on 810205,discovered That SI-137.2,RCS Water Inventory,Not Performed within 72-h Per Surveillance Requirements.Caused by Steady State Conditions Not Being Established Long Enough for Performance Before Reactor Trip + (10:53:21, 24 December 2024)
- 05000327/LER-1981-018, Forwards LER 81-018/03L-0 + (10:53:23, 24 December 2024)
- 05000267/LER-1981-015-03, /03L-0:on 810204-0220,plant Operated in Degraded Mode on Nine Occasions.Causes Include Increased Oxidant Outgassing After Power Increase & Moisture Introduced Into Primary Coolant as Part of Approved Test + (10:53:25, 24 December 2024)
- 05000267/LER-1981-015, Forwards LER 81-015/03L-0.Detailed Event Analysis Encl + (10:53:27, 24 December 2024)
- ML19347D234 + (10:53:28, 24 December 2024)
- ML19347D233 + (10:53:29, 24 December 2024)
- ML19347D232 + (10:53:30, 24 December 2024)
- ML19347D231 + (10:53:31, 24 December 2024)
- ML19347D230 + (10:53:32, 24 December 2024)
- ML19347D229 + (10:53:33, 24 December 2024)
- ML19347D228 + (10:53:34, 24 December 2024)
- ML19347D227 + (10:53:34, 24 December 2024)
- DD-80-34, Informs That Time for Commission to Act to Review Directors Decision DD-80-34 Has Expired.Decision Became Final Agency Action on 810303 + (10:53:35, 24 December 2024)
- ML19347D225 + (10:53:38, 24 December 2024)
- ML19347D223 + (10:53:39, 24 December 2024)
- 05000317/LER-1981-009-03, /03L-0:on 810205,reactor Protector Sys Channel D Trip Units Bypassed.Caused by Increase in Temp Detector Resistance,Probably Due to Increased Connection Resistance in Containment.Input Removed from Channel D + (10:53:40, 24 December 2024)