h>d/ A OOD Catchna Power i LgN Compa.y March 2, 1981 File: NG-3514(B)

SERIAL No.:

NO-81-375 Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 2 United States Nuclear Regulatory Commission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 IN-SERVICE INSPECTION AND TEST PROGRAM

Dear Mr. Ippolito:

Carolina Power & Light Company (CP&L) is herewith transmitting to NRC five (5) copies of the revised In-Service Inspection and Test Program for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.

Also included are five (5) copies of the In-Service Diagrams (ISDs) which identify systems and components in the program. This submittal is made in compliance with 10CFR50.55a(g).

This program has been updated in accordance with the require-ments of the ASME Boiler and Pressure Vessel Code,Section XI of the 1977 Edition through the Summer, 1978 Addendum. The program is composed of two sections, as follows:

Section I - Component Inspection Program and Hydrostatic Test Program Section II - Pump and Valve Test Program Section I presents weld, support, and bolting requirements l'or piping and component welds, supports, and bolting within the boundaries of safety-related systems. Also included in Section I is a description of the pressure tests condue.ted on safety-related systems.

Section II preaants the pump and valve test requirements for safety-related pumps and valves. Valve testing requirements for the Standby Gas Treatment System are included in this submittal.

8103110MA

[

-mmm

_m

- m 4*1 A r:teu ? 5; 9:.

O 95

  • W e c rer N O r2%

~

=-

Detailed relief requests from testing or examination as pro-vided for in 10CFR50.55a(g)(5)(iii) are specifically identified in each section of the program.

The updated In-Service Inspection and Test Program will be applicable for a new 120-month ir.terval beginning July 1, 1981. As required additions or changes are identified, we will present the necessary information to you.

Yours very truly, d

'Og L M E. E. Utley Executive Vice President Power Supply and Engineering & Construction HVW/jc (4172)

Attachments cc:

Mr. James P. O'Reilly I&E Region II 101 Marietta St., Suite 3100 Atlanta, GA 30303