Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347D612 + (10:46:48, 24 December 2024)
- 05000338/LER-1981-013, Forwards LER 81-013/03L-0 + (10:46:49, 24 December 2024)
- 05000339/LER-1981-024-03, /03L-0:on 810224,quench Spray Pump & Associated Valves Removed from Svc.Caused by Repair of Pump Leaks.Leaks Repaired & Subsys Returned to Svc + (10:46:50, 24 December 2024)
- 05000339/LER-1981-024, Forwards LER 81-024/03L-0 + (10:46:52, 24 December 2024)
- ML19347D606 + (10:46:53, 24 December 2024)
- ML19347D605 + (10:46:53, 24 December 2024)
- ML19347D603 + (10:46:54, 24 December 2024)
- ML19347D604 + (10:46:54, 24 December 2024)
- ML19347D601 + (10:46:55, 24 December 2024)
- ML19347D600 + (10:46:56, 24 December 2024)
- ML19347D599 + (10:46:57, 24 December 2024)
- ML19347D597 + (10:46:58, 24 December 2024)
- ML19347D598 + (10:46:58, 24 December 2024)
- ML19347D596 + (10:46:59, 24 December 2024)
- A810011, Forwards Annual Environ Operating Rept,Nonradiological, Jan-Dec 1980, Vol 1 + (10:46:59, 24 December 2024)
- ML19347D593 + (10:47:02, 24 December 2024)
- ML19347D592 + (10:47:03, 24 December 2024)
- ML19347D591 + (10:47:04, 24 December 2024)
- ML19347D587 + (10:47:10, 24 December 2024)
- ML19347D586 + (10:47:10, 24 December 2024)
- ML19347D585 + (10:47:11, 24 December 2024)
- ML19347D584 + (10:47:12, 24 December 2024)
- 05000334/LER-1981-020-03, /03L-0:on 810209,remote Control Room Multipoint Recorder Temp Channels Declared Inoperable.Caused by Accidental Repositioing of Local Test Switch Midway Through Gaseous Waste Discharge.Switch Returned to Normal Position + (10:47:13, 24 December 2024)
- 05000334/LER-1981-020, Forwards LER 81-020/03L-0 + (10:47:15, 24 December 2024)
- ML19347D575 + (10:47:17, 24 December 2024)
- ML19347D576 + (10:47:17, 24 December 2024)
- ML19347D572 + (10:47:19, 24 December 2024)
- ML19347D574 + (10:47:19, 24 December 2024)
- 05000318/LER-1981-010-03, /03L-0:on 810301,power-operated Relief Valve ERV-402 Failed to Seat Resulting in Valve Isolation.Caused by Insufficient Pressure in Sys While Filling Rcs.Pressure Raised & Valve Seated + (10:47:21, 24 December 2024)
- ML19347D570 + (10:47:22, 24 December 2024)
- 05000318/LER-1981-010, Forwards LER 81-010/03L-0 + (10:47:23, 24 December 2024)
- ML19347D567 + (10:47:24, 24 December 2024)
- ML19347D565 + (10:47:25, 24 December 2024)
- ML19347D566 + (10:47:25, 24 December 2024)
- ML19347D563 + (10:47:26, 24 December 2024)
- ML19347D562 + (10:47:27, 24 December 2024)
- 05000317/LER-1981-012-03, /03L-0:on 810213,while Shifting from 1 to 2 Running Charging Pumps,Letdown Relief Valve CVC-345-RV Lifted & Failed to Reseat.Possibly Caused by Pressure Surge in Line.Valve Matls Review Being Conducted + (10:47:28, 24 December 2024)
- 05000317/LER-1981-012, Forwards LER 81-012/03L-0 + (10:47:30, 24 December 2024)
- ML19347D558 + (10:47:32, 24 December 2024)
- ML19347D557 + (10:47:33, 24 December 2024)
- ML19347D556 + (10:47:33, 24 December 2024)
- ML19347D555 + (10:47:34, 24 December 2024)
- ML19347D554 + (10:47:35, 24 December 2024)
- ML19347D553 + (10:47:36, 24 December 2024)
- ML19347D552 + (10:47:37, 24 December 2024)
- ML19347D551 + (10:47:38, 24 December 2024)
- ML19347D549 + (10:47:39, 24 December 2024)
- ML19347D548 + (10:47:40, 24 December 2024)
- B10163, Discusses Costs for Implementation of TMI Action Plan Requirements.Nrc Estimates of Required Industry Resources Have Been Consistently Low.Comparison of NRC Estimate W/ Actual Costs Encl + (10:47:41, 24 December 2024)
- ML19347D546 + (10:47:43, 24 December 2024)
- ML19347D544 + (10:47:44, 24 December 2024)
- ML19347D543 + (10:47:45, 24 December 2024)