Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347F888 + (09:51:05, 24 December 2024)
- ML19347F885 + (09:51:07, 24 December 2024)
- ML19347F886 + (09:51:07, 24 December 2024)
- ML19347F884 + (09:51:08, 24 December 2024)
- ML19347F883 + (09:51:11, 24 December 2024)
- ML19347F881 + (09:51:12, 24 December 2024)
- ML19347F880 + (09:51:13, 24 December 2024)
- ML19347F878 + (09:51:14, 24 December 2024)
- ML19347F877 + (09:51:18, 24 December 2024)
- ML19347F876 + (09:51:19, 24 December 2024)
- A01620, Responds to NRC 810327 Request for Info Re SEP Topic VIII-4, Electrical Penetrations of Reactor Containment.Circuit Design & Theory of Operation for Differential Current Protection of Motor Pumps Provided + (09:51:20, 24 December 2024)
- ML19347F872 + (09:51:21, 24 December 2024)
- ML19347F870 + (09:51:23, 24 December 2024)
- 05000338/LER-1981-032-03, /03L-0:on 810428,air Flowrate Through Filter Train 1-HV-F-40A of Safeguards Area Ventilation Sys Exceeded Tech Spec.Caused by Improper Positioning of Air Damper.Damper Readjusted + (09:51:25, 24 December 2024)
- ML19347F868 + (09:51:26, 24 December 2024)
- ML19347F866 + (09:51:32, 24 December 2024)
- 05000338/LER-1981-032, Forwards LER 81-032/03L-0 + (09:51:34, 24 December 2024)
- 05000338/LER-1981-033-03, /03L-0:on 810504,individual Rod Position Indicator D-10 Showed Disagreement of Greater than 12 Steps from Group Demand Position.Caused by Instrument Drift.Channel Recalibr + (09:51:37, 24 December 2024)
- ML19347F862 + (09:51:39, 24 December 2024)
- 05000338/LER-1981-033, Forwards LER 81-033/03L-0 + (09:51:40, 24 December 2024)
- ML19347F858 + (09:51:46, 24 December 2024)
- 05000259/LER-1981-012-03, /03L-0:on 810423,Athens 161 Kv Line Tripped & Cooling Tower Transformer 1 de-energized by B Phase Differential Relay Operation.Cause & Corrective Actions in Accordance W/Ler BFRO-50-259/81013 + (09:51:47, 24 December 2024)
- 05000259/LER-1981-012, Forwards LER 81-012/03L-0 + (09:51:51, 24 December 2024)
- ML19347F854 + (09:51:54, 24 December 2024)
- 05000259/LER-1981-013-03, /03L-0:on 810424,Athens 161 Kv Line Tripped & Cooling Tower Transformer 1 de-energized.Caused by Rolled Current Transformer Leads B & C for Breaker 1928.Lead B in Breaker 1922 Loose.Rolled Leads Corrected + (09:51:55, 24 December 2024)
- 05000259/LER-1981-013, Forwards LER 81-013/03L-0 + (09:51:58, 24 December 2024)
- TXX-3322, Interim Rept Re Westinghouse Valves Failure to Close Completely Under Preoperational Test Conditions,Initially Reported on 810217.Westinghouse Has Modified 4-inch Valves for Use as Prototypes.Final Rept to Be Submitted by 811016 + (09:52:01, 24 December 2024)
- ML19347F848 + (09:52:08, 24 December 2024)
- ML19347F847 + (09:52:09, 24 December 2024)
- IR 05000010/1981005 + (09:52:11, 24 December 2024)
- ML19347F844 + (09:52:12, 24 December 2024)
- IR 05000373/1981008 + (09:52:14, 24 December 2024)
- IR 05000373/1981001 + (09:52:16, 24 December 2024)
- 05000339/LER-1981-021-03, Boron Injection Tank Was Found to Contain Boron Concentration Below Tech Spec Limit. Caused by Leak Past Check Valve 2-CH-155,located in Boric Acid Supply Line.Check Valve Will Be Replaced + (09:52:18, 24 December 2024)
- ML19347F839 + (09:52:22, 24 December 2024)
- 05000339/LER-1981-021, Forwards Updated LER 81-021/03X-1 + (09:52:25, 24 December 2024)
- ML19347F836 + (09:52:31, 24 December 2024)
- ML19347F834 + (09:52:32, 24 December 2024)
- ML19347F832 + (09:52:39, 24 December 2024)
- ML19347F831 + (09:52:45, 24 December 2024)
- ML19347F830 + (09:52:46, 24 December 2024)
- ML19347F829 + (09:52:47, 24 December 2024)
- ML19347F827 + (09:52:48, 24 December 2024)
- ML19347F826 + (09:52:49, 24 December 2024)
- ML19347F824 + (09:52:50, 24 December 2024)
- ML19347F825 + (09:52:50, 24 December 2024)
- 05000325/LER-1981-032-03, /03L-0:on 810419,heat Exchanger,Model Ceu,Size 52-8-144,baffle Plate Was Discovered to Be Bowed.Caused by Excessive Differential Pressure Across Baffle Plate from Accumulation of Shells in Heat Exchanger.Plate Reinstalled + (09:52:52, 24 December 2024)
- ML19347F822 + (09:52:56, 24 December 2024)
- ML19347F820 + (09:52:58, 24 December 2024)
- ML19347F821 + (09:52:58, 24 December 2024)
- 05000325/LER-1981-032, Forwards LER 81-032/03L-0 + (09:53:00, 24 December 2024)